New Plot Demarcation Procedures
-
4
Provisional Demarcation, Demarcation of Plot Corners or Showing Plot Locations to the Owner.
1.
2. Demarcation for Construction
The following actions are permitted once a Provisional Certificate is issued: Conducting soil test only Construction of fence for temporary plot (Al Faya Indust., Ranches, Sea Rest Houses)
Construction not allowedIssuing of Provisional Demarcation Certificate
Demarcation of plot corners with high accuracy and not less than 5 cm using modern instruments and surveying techniques, and handing over reduced level height for gate level purpose. The following actions are permitted after issuing the Demarcation Certificate for construction: Temporary Fence Fixing Issuing of Building Permits Construction allowed
Issuing of Demarcation Certificate for Construction Purpose
-
5 6
It will be carried out at Tie Beam Stage Checking the lay-out of building Checking Gate Level Height Checking if the construction is inside the boundary which was handed over in case of Commercial buildings.
Issuing of Field Survey Report
Lay Out of Building and Gate Level Checking
Checking of Boundary Wall Demarcation or Any Construction Near the Boundary of the Plot
3.
4.
In case of villa construction or any building has a compound wallWhen the contractor starts construction of the boundary wall or any building near/adjacent to the boundary wall, they should get a certificate conforming that they are not exceeding plot boundary limits at the tie beam stage and before they start the concrete work.
Issuing of Field Survey Report
For completion certificate purpose, survey of boundary wall in case of villa or survey of outside limit of building in case of commercial and tower buildings. If the contractor constructs outside the provided boundary which was handed over previously, then a fine is to be paid and sets back the build up to its original permitted limits.
Final building height should be equivalent to the approved designed height.
Issuing of Final Survey Certificate
Final Survey Certificate5.
When applying for a plot demarcation, the Consultant and the Contractor should nominate their representative engineers for plot demarcation. Names along with mobile numbers should be specified on the request form.
The site engineer (surveyor, civil eng., architect) representing Contractor and Consultant, should be attending the demarcation process and receiving the marks on site.
The surveyor will verify the site engineers identity. The Contractor and Consultant representatives should present ID cards to the surveyor.
The Demarcation Certificate will be issued on the second day from demarcation if there are no conflicts.
The issued Demarcation Certificate should be signed only by the representative engineers as per the application and attending the process of demarcation on site. Only to the nominated representative Demarcation Certificate will be issued.
If there is any discrepancy between Demarcated Plot and constructed compound wall, building or approved engineering design (gate level and final level), the Contractor should correct these discrepancies before commencing the work.
If any discrepancies appear during the issuing of the final survey certificate, the Contractor should pay the cost of these discrepancies as well as corrections costs.
Field report will be issued only when tie beams are prepared for all plot corners
General Conditions and Requirements
-
7 8
Request for Plot BoundaryChecking
Handing Over the Plot Corner toContractor and Consulant
New Plot Demarcation Procedures
Request for Building LayOut
Field ReportBuilding LayOut
Request for Final SurveyCerticate
Demarcation for ConstructionRequest
Issuing of Demarcation Certicate
Issuing Feild Report for PlotBoundary
Issuing Final Survey Certicate
ContractorADM
Documents Required Updated site plan Owner passport copy Owner contractor and consultant contract
Documents Required Building Permit Copy Demarcation Certicate Copy Lay-Out Certicate Copy Survey Services Form The Contractor should make sure the site is ready for survey
Documents Required Building Permit Copy Demarcation Certicate Copy Lay-Out Certicate Copy Plot Bounding Certicate Copy Survey Services Form
Documents Required Building Permit Copy Demarcation Certicate Copy Survey Services Form The Contractor should make sure the site is ready for survey
LQG QdG LGe W J
hd VQCG FY J
kbe QSEGh
VQCG `J GAGLEG
G cJ LGe W J
HGdG QG Me Y
e cJ - be e IOT
Ff e IOT W
Ff FY j W J
FY J IOT QGUEG
LGe - be e IOT QGUEG
LQG QdG
d Ff e IOT QGUEG
hGjdG
HG GG
VQCd jM be WQN VQCG de RGL IQU
Yh hGh dG H bdG QSEGGh dG H bdG
HG GG
AdG NQ e f VQCG jGhR J IOT e f G cJ LGe e f
Me eN W P J bG CG e cCdG hG Y
MG d gL
HG GG
AdG NQ e f VQCG jGhR J IOT e f G cJ LGe e f
LQG QdG LGe IOT e f Me eN W P J
HG GG
AdG NQ e f VQCG jGhR J IOT e f Me eN W P J bG CG e cCdG hG Y
MG d gL