8/8/2019 11) Precipitator Maintenance and Operations
1/64
Worldwide Pollution
Control Association
FirstEnergy ESP Seminar
November 27th 28th, 2007
Visit our website at www.wpca.info
-
8/8/2019 11) Precipitator Maintenance and Operations
2/64
Precipitator Maintenance and
Operations
By Scott Williams
-
8/8/2019 11) Precipitator Maintenance and Operations
3/64
External Dust Collection
Concerns
-
8/8/2019 11) Precipitator Maintenance and Operations
4/64
Preheater Basket
Material Can
Ground Out
Precipitators
-
8/8/2019 11) Precipitator Maintenance and Operations
5/64
Carbon Loss on Ignition Decreases Collection Capability
-
8/8/2019 11) Precipitator Maintenance and Operations
6/64
Carbon Loss on Ignition Increases Emissions and Opacity
-
8/8/2019 11) Precipitator Maintenance and Operations
7/64
Proper Gas Flow is Critical
-
8/8/2019 11) Precipitator Maintenance and Operations
8/64
Ash Build-up on Turning Vanes in the Duct Causes Poor Gas
Flow
-
8/8/2019 11) Precipitator Maintenance and Operations
9/64
Ash Build-up at Precipitator Inlet
-
8/8/2019 11) Precipitator Maintenance and Operations
10/64
Ash Buildup at Access Door
-
8/8/2019 11) Precipitator Maintenance and Operations
11/64
High Voltage Arcing and
Tracking Causes ComponentFailures
-
8/8/2019 11) Precipitator Maintenance and Operations
12/64
Knife Blade Switch Arcing and High Voltage Cable Failure
-
8/8/2019 11) Precipitator Maintenance and Operations
13/64
Power Path High Voltage Failure
-
8/8/2019 11) Precipitator Maintenance and Operations
14/64
Broken High Voltage Insulator
-
8/8/2019 11) Precipitator Maintenance and Operations
15/64
Tracked Post Insulator Inside a T/R Set
-
8/8/2019 11) Precipitator Maintenance and Operations
16/64
Support Insulator inside T/R - Tracking
-
8/8/2019 11) Precipitator Maintenance and Operations
17/64
High Voltage Insulator Tracking
-
8/8/2019 11) Precipitator Maintenance and Operations
18/64
Water/Air Leakage is a Major
Concern
-
8/8/2019 11) Precipitator Maintenance and Operations
19/64
A Hole in the Precipitator Hot Roof due to ThermalStress/Corrosion
-
8/8/2019 11) Precipitator Maintenance and Operations
20/64
Holes in the Side of the Precipitator Due to Corrosion
-
8/8/2019 11) Precipitator Maintenance and Operations
21/64
Water Leaks From Ductwork
-
8/8/2019 11) Precipitator Maintenance and Operations
22/64
High Voltage Guard Air Leakage
-
8/8/2019 11) Precipitator Maintenance and Operations
23/64
Corrosion of High Voltage Guard Due to Air Leakage
-
8/8/2019 11) Precipitator Maintenance and Operations
24/64
Water Leakage Around Rapper Boot Seal
-
8/8/2019 11) Precipitator Maintenance and Operations
25/64
-
8/8/2019 11) Precipitator Maintenance and Operations
26/64
Ash Buildup in Hopper
-
8/8/2019 11) Precipitator Maintenance and Operations
27/64
Water Leakage Through the Precipitator Roof
-
8/8/2019 11) Precipitator Maintenance and Operations
28/64
Roof Corrosion Due to Water Standing for a Long Period of
Time
-
8/8/2019 11) Precipitator Maintenance and Operations
29/64
Corrosion Around Access Door
-
8/8/2019 11) Precipitator Maintenance and Operations
30/64
Thermal Stress Concerns
-
8/8/2019 11) Precipitator Maintenance and Operations
31/64
Structural Component Bowing due to Thermal Stress
-
8/8/2019 11) Precipitator Maintenance and Operations
32/64
Plate Bowing Due to Thermal Fatigue
-
8/8/2019 11) Precipitator Maintenance and Operations
33/64
Thermal Stress Crack in Casing
-
8/8/2019 11) Precipitator Maintenance and Operations
34/64
Center Wall Cracking
-
8/8/2019 11) Precipitator Maintenance and Operations
35/64
Thermal Fatigue Cracking At Turning Vane Support
-
8/8/2019 11) Precipitator Maintenance and Operations
36/64
Mechanical Component Failures
-
8/8/2019 11) Precipitator Maintenance and Operations
37/64
Hopper Baffle Door- This causes increased opacity
B t St t l C B i
-
8/8/2019 11) Precipitator Maintenance and Operations
38/64
Bent Structural Cross Brasing
-
8/8/2019 11) Precipitator Maintenance and Operations
39/64
Baffle Component Failure- Gas will bypass the baffle
-
8/8/2019 11) Precipitator Maintenance and Operations
40/64
Cracked Plate- Mechanical Stress
-
8/8/2019 11) Precipitator Maintenance and Operations
41/64
Crack Plate
C k Pl S d
-
8/8/2019 11) Precipitator Maintenance and Operations
42/64
Crack Plate Swords
-
8/8/2019 11) Precipitator Maintenance and Operations
43/64
Cracked Plate on top
-
8/8/2019 11) Precipitator Maintenance and Operations
44/64
Plate Repairs
-
8/8/2019 11) Precipitator Maintenance and Operations
45/64
Weld Failure At Top of Plate
-
8/8/2019 11) Precipitator Maintenance and Operations
46/64
Channel Cracking at Top of Plate
-
8/8/2019 11) Precipitator Maintenance and Operations
47/64
Insulation Problems
-
8/8/2019 11) Precipitator Maintenance and Operations
48/64
Poor Insulation Can Promote Corrosion
-
8/8/2019 11) Precipitator Maintenance and Operations
49/64
Plate to Wire Clearances are
Important
-
8/8/2019 11) Precipitator Maintenance and Operations
50/64
The Wire/Electrode Carries the Charge
The Plate Collects the Ash
Plate to Wire Clearance is Critical
-
8/8/2019 11) Precipitator Maintenance and Operations
51/64
Rapper Failures
-
8/8/2019 11) Precipitator Maintenance and Operations
52/64
Rapper Shaft Cracked at Anvil Beam- Shaft has fell down
-
8/8/2019 11) Precipitator Maintenance and Operations
53/64
Broken Rapper Shaft- In the Penthouse
-
8/8/2019 11) Precipitator Maintenance and Operations
54/64
Broken Tumbling Hammer
Chain of Tumbling Hammer Sprocket
-
8/8/2019 11) Precipitator Maintenance and Operations
55/64
g p
Vibrator Shaft Broken
-
8/8/2019 11) Precipitator Maintenance and Operations
56/64
Vibrator Shaft Broken
-
8/8/2019 11) Precipitator Maintenance and Operations
57/64
Operational Problems
-
8/8/2019 11) Precipitator Maintenance and Operations
58/64
Ammonia System Ash Buildup
-
8/8/2019 11) Precipitator Maintenance and Operations
59/64
Ash Hopper Overfilled
-
8/8/2019 11) Precipitator Maintenance and Operations
60/64
Ash Buildup on Electrodes- Opacity Can Increase
-
8/8/2019 11) Precipitator Maintenance and Operations
61/64
Structural Erosion
-
8/8/2019 11) Precipitator Maintenance and Operations
62/64
Erosion Due to Ash if Flue Gas on Structural Support
-
8/8/2019 11) Precipitator Maintenance and Operations
63/64
T/R Set Oil Leakage
-
8/8/2019 11) Precipitator Maintenance and Operations
64/64
Start Up Procedure
Back section should be energized first atstart of first mill operation.
Sections added as needed.
Start SO3 injection at 125oC.
Start NH4 injection when SO3 effects are
evident (usually the next day).