Material Material Requirement Requirement Planning Planning Dr. Nimit Chowdhary Professor Production and Operations Management

Transcript of 11 mrp

Page 1: 11 mrp

Material Material Requirement Requirement PlanningPlanning

Dr. Nimit Chowdhary Professor

Production and Operations Management

Page 2: 11 mrp

Material Requirements Material Requirements PlanningPlanning

Computerized inventory control & Computerized inventory control & production planning systemproduction planning system

Schedules component items when Schedules component items when they are needed - no earlier and no they are needed - no earlier and no laterlater

Page 3: 11 mrp

ERP and MRPERP and MRP MRP (material requirements planning) MRP (material requirements planning)

was the precursor to ERPwas the precursor to ERP Primarily a production planning and Primarily a production planning and

control systemcontrol system MRP evolved to MRP II (manufacturing MRP evolved to MRP II (manufacturing

resource planning)resource planning) ERP and ERP II continue to extend the ERP and ERP II continue to extend the

links through all business processeslinks through all business processes

Page 4: 11 mrp

When to Use MRPWhen to Use MRP

Dependent and discrete itemsDependent and discrete items Complex productsComplex products Job shop productionJob shop production Assemble-to-order environmentsAssemble-to-order environments

Page 5: 11 mrp

Demand CharacteristicsDemand Characteristics

11 22 33 44 55WeekWeek

400 400 –

300 300 –

200 200 –

100 100 –

No

. of

tab

les

No

. of

tab

les

Continuous demandContinuous demand

M T W Th F M T W Th FM T W Th F M T W Th F

400 400 –

300 300 –

200 200 –

100 100 –

No

. o

f ta

ble

sN

o.

of

tab

les

Discrete demandDiscrete demand

Independent demandIndependent demand

100 tables100 tables

Dependent demandDependent demand

100 x 1 = 100 x 1 = 100 tabletops100 tabletops

100 x 4 = 400 table legs100 x 4 = 400 table legs

Figure 12.4Figure 12.4

Page 6: 11 mrp

Material Material Requirements Requirements PlanningPlanning

Page 7: 11 mrp

Material Material Requirements Requirements PlanningPlanning

Materialrequirements

planning

Planned order

releases

Work orders

Purchase orders

Rescheduling notices

Itemmaster

file

Productstructure

file

Master production schedule

Page 8: 11 mrp

Master Production Master Production ScheduleSchedule

Drives MRP process with a schedule of Drives MRP process with a schedule of finished productsfinished products

Quantities represent production not Quantities represent production not demanddemand

Quantities may consist of a combination of Quantities may consist of a combination of customer orders & demand forecastscustomer orders & demand forecasts

Quantities represent what needs to be Quantities represent what needs to be produced, not what can be producedproduced, not what can be produced

Page 9: 11 mrp

Master Production Master Production ScheduleSchedule

PERIODPERIODMPS ITEMMPS ITEM 11 22 33 44 55

ClipboardClipboard 8585 9595 120120 100100 100100LapdeskLapdesk 00 5050 00 5050 00LapboardLapboard 7575 120120 4747 2020 1717Pencil CasePencil Case 125125 125125 125125 125125 125125

Page 10: 11 mrp

Product Structure TreeProduct Structure Tree

Top clip (1) Bottom clip (1)

Pivot (1) Spring (1)

Rivets (2)Finished clipboard Pressboard (1)

Clipboard

Page 11: 11 mrp

Product Structure TreeProduct Structure Tree

Clipboard Level 0Level 0

Level 1Level 1

Level 2Level 2Spring

(1)Bottom Clip

(1)Top Clip

(1)Pivot

(1)

Rivets (2)

Clip Ass’y (1)

Pressboard (1)

Page 12: 11 mrp

Indented Bill of MaterialIndented Bill of Material

0 - - - -0 - - - - ClipboardClipboard eaea 11- 1 - - -- 1 - - - Clip AssemblyClip Assembly eaea 11- - 2 - -- - 2 - - Top ClipTop Clip eaea 11- - 2 - -- - 2 - - Bottom ClipBottom Clip eaea 11- - 2 - -- - 2 - - PivotPivot eaea 11- - 2 - -- - 2 - - SpringSpring eaea 11- 1 - - -- 1 - - - RivetRivet eaea 22- 1 - - -- 1 - - - Press BoardPress Board eaea 11

LEVELLEVEL ITEMITEM UNIT OF MEASUREUNIT OF MEASURE QUANTITYQUANTITY

Page 13: 11 mrp

Specialized BOMSSpecialized BOMS Phantom billsPhantom bills

Transient subassembliesTransient subassembliesNever stockedNever stocked Immediately consumed in next stageImmediately consumed in next stage

K-billsK-billsGroup small, loose parts under Group small, loose parts under

pseudo-item numberpseudo-item numberReduces paperworkReduces paperwork

Page 14: 11 mrp

Specialized BOMSSpecialized BOMS Modular billsModular bills

Product assembled from major Product assembled from major subassemblies & customer optionssubassemblies & customer options

Modular bill kept for each major Modular bill kept for each major subassemblysubassembly

Simplifies forecasting & planningSimplifies forecasting & planning X10 Automobile exampleX10 Automobile example

3 x 8 x 3 x 8 x 4 = 2,304 configurations3 x 8 x 3 x 8 x 4 = 2,304 configurations 3 + 8 + 3 + 8 + 4 = 26 modular bills3 + 8 + 3 + 8 + 4 = 26 modular bills

Page 15: 11 mrp

Basic MRP Basic MRP ProcessesProcesses

1.1. Exploding the bill of materialExploding the bill of material

2.2. Netting out inventoryNetting out inventory

3.3. Lot sizingLot sizing

4.4. Time-phasing requirementsTime-phasing requirements

Page 16: 11 mrp

School Mate ProductsSchool Mate ProductsMaster Production ScheduleMaster Production Schedule

11 22 33 44 55

ClipboardClipboard 8585 9595 120120 100100 100100LapdeskLapdesk 00 6060 00 6060 00

Item Master FileItem Master File

CLIPBOARDCLIPBOARD LAPDESKLAPDESK PRESSBOARDPRESSBOARDOn handOn hand 2525 2020 150150On orderOn order 175 (Period 1)175 (Period 1) 00 00 (sch receipt)(sch receipt)LLCLLC 00 00 11Lot sizeLot size L4LL4L Mult 50Mult 50 Min 100Min 100Lead timeLead time 11 11 11

Page 17: 11 mrp

School Mate ProductsSchool Mate ProductsProduct Structure RecordProduct Structure Record

Clipboard

Lapdesk

Pressboard(2)

Trim(3’)

Beanbag(1)

Glue(4 oz)

Level 0Level 0

Level 0Level 0

Pressboard(1)

Clip Ass’y(1)

Rivets(2) Level 1Level 1

Level 1Level 1

Page 18: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 8585 9595 120120 100100 100100

Scheduled ReceiptsScheduled Receipts 175175

Projected on HandProjected on Hand 2525

Net RequirementsNet Requirements

Planned Order ReceiptsPlanned Order Receipts

Planned Order ReleasesPlanned Order Releases

Page 19: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 8585 9595 120120 100100 100100

Scheduled ReceiptsScheduled Receipts 175175

Projected on HandProjected on Hand 2525 115115

Net RequirementsNet Requirements 00

Planned Order ReceiptsPlanned Order Receipts

Planned Order ReleasesPlanned Order Releases

(25 + 175) = 200 units available(25 + 175) = 200 units available(200 - 85) = 115 on hand at the end of Period 1(200 - 85) = 115 on hand at the end of Period 1

Page 20: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 8585 9595 120120 100100 100100

Scheduled ReceiptsScheduled Receipts 175175

Projected on HandProjected on Hand 2525 115115 2020

Net RequirementsNet Requirements 00 00

Planned Order ReceiptsPlanned Order Receipts

Planned Order ReleasesPlanned Order Releases

115 units available115 units available(115 - 85) = 20 on hand at the end of Period 2(115 - 85) = 20 on hand at the end of Period 2

Page 21: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 8585 9595 120120 100100 100100

Scheduled ReceiptsScheduled Receipts 175175

Projected on HandProjected on Hand 2525 115115 2020 00

Net RequirementsNet Requirements 00 00 100100

Planned Order ReceiptsPlanned Order Receipts 100100

Planned Order ReleasesPlanned Order Releases 100100

20 units available20 units available(20 - 120) = -100 — 100 additional Clipboards are required(20 - 120) = -100 — 100 additional Clipboards are requiredOrder must be placed in Period 2 to be received in Period 3Order must be placed in Period 2 to be received in Period 3

Page 22: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 8585 9595 120120 100100 100100

Scheduled ReceiptsScheduled Receipts 175175

Projected on HandProjected on Hand 2525 115115 2020 00 00 00

Net RequirementsNet Requirements 00 00 100100 100100 100100

Planned Order ReceiptsPlanned Order Receipts 100100 100100 100100

Planned Order ReleasesPlanned Order Releases 100100 100100 100100

Following the same logic Gross Requirements in Periods 4 Following the same logic Gross Requirements in Periods 4 and 5 develop Net Requirements, Planned Order Receipts, and and 5 develop Net Requirements, Planned Order Receipts, and Planned Order ReleasesPlanned Order Releases

Page 23: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: LAPDESKITEM: LAPDESK LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MULT 50LOT SIZE: MULT 50 LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 00 6060 00 6060 00

Scheduled ReceiptsScheduled Receipts

Projected on HandProjected on Hand 2020

Net RequirementsNet Requirements

Planned Order ReceiptsPlanned Order Receipts

Planned Order ReleasesPlanned Order Releases

Page 24: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: LAPDESKITEM: LAPDESK LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MULT 50LOT SIZE: MULT 50 LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 00 6060 00 6060 00

Scheduled ReceiptsScheduled Receipts

Projected on HandProjected on Hand 2020 2020 1010 1010 00 00

Net RequirementsNet Requirements 00 4040 5050

Planned Order ReceiptsPlanned Order Receipts 5050 5050

Planned Order ReleasesPlanned Order Releases 5050 5050

Following the same logic, the Lapdesk MRP matrix is Following the same logic, the Lapdesk MRP matrix is completed as showncompleted as shown

Page 25: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: PRESSBOARDITEM: PRESSBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MIN 100LOT SIZE: MIN 100 LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross RequirementsScheduled ReceiptsScheduled ReceiptsProjected on HandProjected on Hand 150150Net RequirementsNet RequirementsPlanned Order ReceiptsPlanned Order ReceiptsPlanned Order ReleasesPlanned Order Releases

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Planned Order ReleasesPlanned Order Releases 100100 100100 100100

ITEM: LAPDESKITEM: LAPDESK LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MULT 50LOT SIZE: MULT 50 LT: 1LT: 1 11 22 33 44 55

Planned Order ReleasesPlanned Order Releases 5050 5050

Page 26: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: PRESSBOARDITEM: PRESSBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MIN 100LOT SIZE: MIN 100 LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 100100 100100 200200 100100 00Scheduled ReceiptsScheduled ReceiptsProjected on HandProjected on Hand 150150Net RequirementsNet RequirementsPlanned Order ReceiptsPlanned Order ReceiptsPlanned Order ReleasesPlanned Order Releases

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Planned Order ReleasesPlanned Order Releases 100100 100100 100100

ITEM: LAPDESKITEM: LAPDESK LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MULT 50LOT SIZE: MULT 50 LT: 1LT: 1 11 22 33 44 55

Planned Order ReleasesPlanned Order Releases 5050 5050

x2x2 x2x2

x1x1 x1x1x1x1

Page 27: 11 mrp

School Mate ProductsSchool Mate Products

ITEM: PRESSBOARDITEM: PRESSBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MIN 100LOT SIZE: MIN 100 LT: 1LT: 1 11 22 33 44 55

Gross RequirementsGross Requirements 100100 100100 200200 100100 00Scheduled ReceiptsScheduled ReceiptsProjected on HandProjected on Hand 150150 5050 5050 00 00 00Net RequirementsNet Requirements 5050 150150 100100Planned Order ReceiptsPlanned Order Receipts 100100 150150 100100Planned Order ReleasesPlanned Order Releases 100100 150150 100100

ITEM: CLIPBOARDITEM: CLIPBOARD LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: L4LLOT SIZE: L4L LT: 1LT: 1 11 22 33 44 55

Planned Order ReleasesPlanned Order Releases 100100 100100 100100

ITEM: LAPDESKITEM: LAPDESK LLC: 0LLC: 0 PERIODPERIOD

LOT SIZE: MULT 50LOT SIZE: MULT 50 LT: 1LT: 1 11 22 33 44 55

Planned Order ReleasesPlanned Order Releases 5050 5050

Page 28: 11 mrp

School Mate ProductsSchool Mate Products

Planned Order ReportPlanned Order Report

PERIODPERIOD

ITEMITEM 11 22 33 44 55

ClipboardClipboard 100100 100100 100100

LapdeskLapdesk 5050 5050

PressboardPressboard 100100 150150 100100

Page 29: 11 mrp

MRP OutputsMRP Outputs

Planned ordersPlanned ordersWork ordersWork ordersPurchase ordersPurchase orders

Changes to previous plans or Changes to previous plans or existing schedulesexisting schedulesAction noticesAction noticesRescheduling noticesRescheduling notices

Page 30: 11 mrp

Planned Order ReportPlanned Order ReportItemItem #2740#2740 DateDate 9 - 25 - 029 - 25 - 02On handOn hand 100100 Lead timeLead time 2 weeks2 weeksOn orderOn order 200200 Lot sizeLot size 200200AllocatedAllocated 5050 Safety stockSafety stock 5050

SCHEDULEDSCHEDULED PROJECTEDPROJECTEDDATEDATE ORDER NO.ORDER NO. GROSS REQS.GROSS REQS. RECEIPTSRECEIPTS ON HANDON HAND ACTIONACTION

50509-269-26 AL 4416AL 4416 2525 25259-309-30 AL 4147AL 4147 2525 0010-0110-01 GR 6470GR 6470 5050 - 50- 5010-0810-08 SR 7542SR 7542 200200 150150 Expedite SR 10-01Expedite SR 10-0110-1010-10 CO 4471CO 4471 7575 757510-1510-15 GR 6471GR 6471 5050 252510-2310-23 GR 6471GR 6471 2525 0010-2710-27 GR 6473GR 6473 5050 - 50- 50 Release PO 10-13Release PO 10-13

Key:Key: ALAL = allocated= allocated WOWO = work order= work orderCOCO = customer order= customer order SRSR = scheduled receipt= scheduled receiptPOPO = purchase order= purchase order GRGR = gross requirement= gross requirement

Page 31: 11 mrp

MRP Action ReportMRP Action ReportCurrent date 9-25-02Current date 9-25-02

ITEMITEM DATEDATE ORDER NO.ORDER NO. QTY.QTY. ACTIONACTION

#2740#2740 10-0810-08 75427542 200200 ExpediteExpedite SRSR 10-0110-01

#3616#3616 10-0910-09 Move forwardMove forward POPO 10-0710-07

#2412#2412 10-1010-10 Move forwardMove forward POPO 10-0510-05

#3427#3427 10-1510-15 Move backwardMove backward POPO 10-2510-25

#2516#2516 10-2010-20 76487648 100100 De-expediteDe-expedite SRSR 10-3010-30

#2740#2740 10-2710-27 200200 ReleaseRelease POPO 10-1310-13

#3666#3666 10-3110-31 5050 ReleaseRelease WOWO 10-2410-24