106- 72 KA 4674-01106- 72 KA 4674-01 Splitting Revised 10/5/2017 JGB 9 Control density on the...

5
Page 1 of 5 106- 72 KA 4674-01 STP-A467(401)

Transcript of 106- 72 KA 4674-01106- 72 KA 4674-01 Splitting Revised 10/5/2017 JGB 9 Control density on the...

Page 1: 106- 72 KA 4674-01106- 72 KA 4674-01 Splitting Revised 10/5/2017 JGB 9 Control density on the project using an approved rolling procedure with random nuclear gauge density determinations

Page 1 of 5

106-

72

KA

467

4-01

ST

P-A

467(

401)

Page 2: 106- 72 KA 4674-01106- 72 KA 4674-01 Splitting Revised 10/5/2017 JGB 9 Control density on the project using an approved rolling procedure with random nuclear gauge density determinations

Page 2 of 5

106- 72 KA 4674-01

Splitting

Revised 10/5/2017JGB

9 Control density on the project using an approved rolling procedure with random nuclear gauge densitydeterminations as described in section 602.4e.(6)(b) of the standard specifications manual. Densitypay adjustments will not apply.

Page 3: 106- 72 KA 4674-01106- 72 KA 4674-01 Splitting Revised 10/5/2017 JGB 9 Control density on the project using an approved rolling procedure with random nuclear gauge density determinations

Page 3 of 5

10,063.5

828.5

5636.8

Intersections/Driveways 292.3

106- 72 KA 4674-01

Page 4: 106- 72 KA 4674-01106- 72 KA 4674-01 Splitting Revised 10/5/2017 JGB 9 Control density on the project using an approved rolling procedure with random nuclear gauge density determinations

Page 4 of 5

106-

72

KA

467

4-01

Page 5: 106- 72 KA 4674-01106- 72 KA 4674-01 Splitting Revised 10/5/2017 JGB 9 Control density on the project using an approved rolling procedure with random nuclear gauge density determinations

Page 5 of 5

106- 72 KA 4674-01