10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System...
-
Upload
melanie-horton -
Category
Documents
-
view
214 -
download
1
Transcript of 10/30/2012 Group2 Project - 2012. Department Work load Equitable Workload System Workload System...
Group 02
Dr. Deepani B.GurugeMs.D.W.C.P.Kumari
Members J.M.N.D.Jayasekara I.K.N.Mudalige K.A.D.I.H.Gunarathna S.R.T.B.Samaraweera K.G.Abeysekera
Staff Workload Management System
10/30/2012Group2 Project - 2012
Group2 Project - 2012
Evenly workload allocation Workload comparison between each staff memberTransparency
Clarity of expectation
Facilitation of time
management
sense of fairnessTraceability
Flexibility
career development
& documentatio
n
Department
Work load
Department
Work load
Equitable
WorkloadSystem
WorkloadSystem
10/30/2012
Objective
Group2 Project - 2012
Login(Emp_ID , Pwd , Level)Info(Emp_ID ,Name ,Post ,Degree, Current _residency )Value(work_type, value1, value2)
Work(Emp_ID, Date, Str_hr, End_hr, work_type, course#)
Emp_ID
Course#
Date
Work_type
End_hr
Str_hr
Mutually Dependant
Normalization
Not fully
functionally
Dependant
10/30/2012
DB Structure
Group2 Project - 2012
So Work relation can be divided in to three relations as follows
Emp_work(Emp_ID , work_type , course#)Emp(Emp_ID ,Date )Type(Emp_ID, Str_hr, End_hr, work_type)
10/30/2012
Load FormulaLet assume week is 35 hrs
f= #of lec_hrs*load value+#of practical_hrs*load value+…..
Group2 Project - 2012
LAMP as platformPHP as server side softwareJavaScriptAjaxHTML for create web pages
10/30/2012
Software used
Group2 Project - 2012 10/30/2012
week 1 2 3 4 5 6 7 8 9 10
Kamal
Deshani
Thilini
Kelumi
Ishara
Time Line
Graphs
DB design
Interface design
Ajax auto complete
Formula for
workload
Error checking
Testing
Tuning
Group2 Project - 2012 10/30/2012
End of the presentation
Thank you…