LANDSCAPE CONCEPT PLAN July 2010
The Canal
Residential Development at Phuoc Long BDistrict 9, Vietnam
704/62 Nguyen Dinh Chieu St., Ward 1, Dist. 3, Ho Chi Minh City, Vietnam
Rev. 03
-
8/12/2019 100729 NamLong Presentation
2/31
.
Genius loc i the dist inct ive
atmos phere of a place
Every place has its own unique
qualities, not only in terms of its
physical makeup, but of how it is
perceived.
Landscape considerations:
1) To be sensitive to those unique qualities, to
enhance them rather than to destroy them.
2) Creation of landscape space that attracts
investment corporation.
3) Reactivating the access to the river andrevitalizing its shoreline.
4) Uncovers and showcases the natural river
heritage, while balancing the soft river line
greenery with the hard elements of landscape.
KEY PLAN
LOCATION PLAN
-
8/12/2019 100729 NamLong Presentation
3/31
Below are the amendments, as of 27 thJuly 2010 :
1. Entrance Gateway:
- Shifted edge of kerb to match existing curbline
2. Road towards STP
- Realigned road
3. Retail drop off near Entrance gateway ( Stage 2 )
- Realigned layout
4. Lake
- Realigned lake edge
5. River edge
- Additional 1 nos pontoon
6. Connection from stage 2 condominium to lake
- Curvelinear footpath added
- Position of trees towards the sides of buildings
-
8/12/2019 100729 NamLong Presentation
4/31
INITIAL PLANNING
Plan
Scale : NTS
-
8/12/2019 100729 NamLong Presentation
5/31
PROPOSED ZONE
Area that can be changed
Area that cannot be changed
Temporary landscape
Plan
Stage 2
Scale : NTS
-
8/12/2019 100729 NamLong Presentation
6/31
LANDSCAPE CONCEPT PLAN STAGE 1
Plan
PARK
RIVER EDGE
LILY GARDEN
CUL DE SAC
ENTRANCE GATEWAY
PIAZZA
STREETSCAPE
STP
OPEN
SPACE
OPEN
SPACE
Scale : NTS
-
8/12/2019 100729 NamLong Presentation
7/31
OVERALL LANDSCAPE CONCEPT PLAN
PARK
RIVER EDGE
LILY GARDEN
CUL DE SAC
CANAL
GATEWAY
ENTRANCE GATEWAY
LAKE AREA
PIAZZA
STREETSCAPE
Plan
STP
Scale : NTS
-
8/12/2019 100729 NamLong Presentation
8/31ENTRANCE GATEWAY
PerspectivePerspective
-
8/12/2019 100729 NamLong Presentation
9/31ENTRANCE GATEWAY
KEY PLAN
Plan
Visitors Parking
Guard House
Feature Fence
Lily Pond
Footpath
Footpath
Feature Fence
Grass Area
Grass Area
Feature PotFeature Pot
Special paving
treatment
1. Guard house has been shifted
further in.
2. Direct access from apartment to
public jetty has been provided.
Enlargement
Guard House
Feature Pot
Scale : NTS
-
8/12/2019 100729 NamLong Presentation
10/31PIAZZA
Perspective
-
8/12/2019 100729 NamLong Presentation
11/31
KEY PLANScale : NTS
PIAZZA
Enlargement Plan
Driveway
Footpath
Lily pond
Feature wall
with water
spout
Earth mound
Footpath
-
8/12/2019 100729 NamLong Presentation
12/31
KEY PLANScale : NTS
TYPICAL STREETSCAPE OPTION 1
Visitors parking
Footpath
Visitors Parking
Enlargement Plan
-
8/12/2019 100729 NamLong Presentation
13/31
KEY PLAN
1 4
SectionLagerstroemia floribunda
PlotBoundary
PlotBoundary
Road
6 m
Landscape
3 m
Landscape
3 m
TYPICAL STREETSCAPE OPTION 2
-
8/12/2019 100729 NamLong Presentation
14/31
KEY PLANScale : NTS
CUL DE SAC
Trees
Access to
river edge
Special paving
at cul de sac
Feature Wall
PerspectiveFeature Wall
1. Revised cul-de-sac design with
more softscape.
2. Feature wall at the entrance to
river edge.
Enlargement Plan
-
8/12/2019 100729 NamLong Presentation
15/31
KEY PLANScale : NTS
LILY GARDEN
3
5
1 2
4 6
1
2
3
5
4
Lake
Typha
Pond Creek
Lily PondWeir
Below
Bridge
Bridge
56
6Footpath
Enlargement Plan
-
8/12/2019 100729 NamLong Presentation
16/31
LILY GARDEN - PLANTING SCHEME
Nymphea spp. Nelumbo nucifera Thypa spp3
1
2Bauhinia blakeana
2
Bucida buceras
1
2
3
4
5
Lake
Typha
Pond Creek
Lily PondWeir
Below
Bridge
Bridge
5
6
6Footpath
Enlargement Plan
-
8/12/2019 100729 NamLong Presentation
17/31
KEY PLANScale : NTS
LAKE EDGE / PRIVATE JETTY
Footpath
Floating Pontoon for 12 boats
(length 60m)
Soft Edge Treatment
Stepping stone
Hard edge treatmentUp
Hard edge treatment
Floating Pontoon for 12
boats (length 60m)
Stepping stone
Enlargement Plan
Floating Pontoon for 12
boats (length 60m)
-
8/12/2019 100729 NamLong Presentation
18/31
LAKE EDGE / PRIVATE JETTY
2
KEY PLAN
Perspective
-
8/12/2019 100729 NamLong Presentation
19/31
KEY PLANScale : NTS
LAKE EDGE / PRIVATE JETTY
Footpath
Floating Pontoon
(45m length)
Soft Edge Treatment
Stepping stone
Hard edge treatment
Up
+ 0.0 m
+ 3.0 m
+ 3.15 m
+ 0.3 m
Enlargement Plan
-
8/12/2019 100729 NamLong Presentation
20/31
LAKE EDGE / PRIVATE JETTY
Section
High tide
Low tide
Jetty
Footpath
Stepping stone to villas
KEY PLAN
PlotBoundary
Guard rail
-
8/12/2019 100729 NamLong Presentation
21/31
KEY PLANScale : NTS
PARK
4
Clubhouse
STP
Swimming pool
Wading
Pool
BBQ area
Tennis court
Half Basketball
Court
Sculpture
Open lawn
River
Playground
Service
Road
1. Provide the pedestrian crossing
from lily pond to park with special
paving.
2. Revised layout where the club
house is shifted further with
service road.
Enlargement Plan
-
8/12/2019 100729 NamLong Presentation
22/31
PEDESTRIAN CIRCULATION
Pedestrian Circulation
Plan
Scale : NTS
T F
-
8/12/2019 100729 NamLong Presentation
23/31
FENCING PLAN
Plan
Perimeter wall for
future
development
Temporary Fence
Perimeter Wall For Future Development
Temporary Fence
Perimeter Wall For Future Development
Scale : NTS
-
8/12/2019 100729 NamLong Presentation
24/31
KEY PLANScale : NTS
CANAL GATEWAY & SPORTS CENTRE
Plan
Lake
Step
Terrace
Sports
Centre
Park
Floating
Pavilion
Park
2
Canal
Gate
Restaurant
Parking
Parking
Parking
Sports
Centre
Services
Building
RetailServices
Building
Drop
off area
Cul de
sac
Entrance
Gateway
Retail
-
8/12/2019 100729 NamLong Presentation
25/31
KEY PLANScale : NTS
CANAL GATEWAY & SPORTS CENTRE
Plan3
2 2
3
3
2
Lake
Step
TerraceSports
Centre
Park
Floating
Pavillion
Park
1
2
1
Canal
Gate
Parking
Parking
-
8/12/2019 100729 NamLong Presentation
26/31
-
8/12/2019 100729 NamLong Presentation
27/31
LAKE AREA
Perspective
-
8/12/2019 100729 NamLong Presentation
28/31
KEY PLANScale : NTS
LAKE AREA
Enlargement Plan
Lake
Services
Building
Retail
Each pontoon caters
for 2 boats
Footpath
1
1
Sports
Centre
Parking
Parking
Drop
off area
Cul de
sac
Signage
Free board for pontoon =
150mm
ServicesBuilding
Retail
-
8/12/2019 100729 NamLong Presentation
29/31
LAKE AREA
Plan
1
2
2
3 3
1
2
3
3
Free board for pontoon =
150mm
-
8/12/2019 100729 NamLong Presentation
30/31
LAKE DIMENSION
Plan
14.50 m
90.0
0m
Scale : NTS
-
8/12/2019 100729 NamLong Presentation
31/31
hank you
Scale : NTS