www.egyptrol.com Page 1 of 3 Updated: Jul. 2011
100616-ICX-CMOS-E-2003 I&C Engineer
Holds a B. Sc. in Electrical Engineering and has about 6 years hands-on experience in preparation of site activity planning, leading the commissioning team till successful start-up and handover to the client, safety practices, material take off, man power/equipment, requirement, understanding of P&ID drawing, coordinate with QA/QC, start-up of Gas/Steam Turbines, I&C devices, pumps, valves, generators and transformers.
PERSONAL DATA
Nationality : Egyptian
Birth Date : 19/08/1981
Gender : Male
Marital Status : Married
Residence : El-Behira
EDUCATION
: B. Sc. in Electrical Engineering, Tanta University, 2003
LANGUAGES
Arabic : Native Language
English : Very Good
COMPUTER SKILLS
: Windows, MS Office, Internet
TRAINING COURSES AND CERTIFICATIONS
: Maintenance & Operating of GIS system 220KV, Siemens Power Academy in Nuernberg Germany, Feb./Mar. 2009.
: Fire fighting training, INITEC-CHEMTROL under the direction of INITEC Energia Spain, El-Atf site, Jun. 2009.
: I&C Maintenance training of Gas Turbine, MHI Power Generation, El-Atf site, Aug. 2009.
: Maintenance & Operating of Steam Turbine Generator, Ansaldo Energia Coorporation Energy in El-Atf site, Sep. 2009.
: Continuous Emission Monitoring Control System, MITSUBISHI, held in Egypt, May/Jun. 2009.
: Basic operation training of gas turbine, MITSUBISHI, El-Atf site, Apr. 2009.
: Bentley Nevada training of control of vibration steam turbine, ABB, El-Atf site.
-
www.egyptrol.com Page 2 of 3 Updated: Jul. 2011
: Metito complete automation course:
PLC & SCADA: Allen Bradley (PLC (RSLOGIX (HW-SW))) & SCADA (RSVIEW).
INSTRUMENTATION: - ROSEMOUNT (all liquid analysis sets (installation &
commissioning). - E&H (all liquid and measurements sets (installation &
commissioning).
: TOSHIBA training course for H2 production plant.
: DCS TRAINING CENTUM (CS3000R3) YOKOGAWA.
CHRONOLOGICAL EXPERIENCE RECORD
Dates : From Oct. 2008 till now
Employer : Middle Delta Electricity Production Company (MDEPC)
Project : El-Atf Combined Cycle (750MW) Power Station
Job title : I&C Project Constructions & Commissioning Engineer
Job Description : Contract No. 10049, CP-101 MHI (Combustion Turbine Generator & Auxiliaries Safety engineering follow-up: - Supervise the construction and calibration of the instruments on the
MHI Gas Turbine F701 (TI, TIT, PI, PIT, Pneumatic valves and others).
- Loop Check for all signals from DCS Station to field by YOKOGAWA DCS.
- Attend I&C activity progress meetings and make sure that site activities are in line with project schedule.
- Review and approve MRRs (Material Receiving Reports). - Review and approve contractors progress invoices. - Follow up the project daily works (cables, calibration and all
auxiliary equipment construction). - Responsible for safety insurance in all site works and preparing
safety meeting with all contractors. - Approving designs & submittals, site acceptance tests,
commissioning, start-up and spare parts amount optimization regarding to the cost of each spare part for gas, steam turbines and their auxiliaries equipment like fuel gas skid, fuel oil skid, lube oil unit, hydrogen unit, etc.
Contract No. 10049, CP-105 (NEM Company): - Supervise the construction and calibration of the instrument on the
heat recovery steam generation (TI, TIT, PI, PIT, Pneumatic valves and others).
- Loop Check for all signals from DCS Station to field by YOKOGAWA DCS.
Contract No. 10049, CP-111: - Metito Overseas Ltd. for Water Treatment, Egypt, Automation and
Commission Instrumentation & Control in El-Atf Power Station Project.
- MRR for all instruments and its accessories. - Calibration for all instruments (TS, PI, PIT, FIT, AIT, NA-AIT,
SIO2-AIT) and also pneumatic valves and motorized valves by hart 375 communicator, MA INJECTOR, etc.).
-
www.egyptrol.com Page 3 of 3 Updated: Jul. 2011
- Loop check for 1034 signal from PLC (Allen Bradley RSLOGIX5000) to the field and also function check for all equipments which response for water treatment system.
The above mentioned operations were actually done for: - Gas Turbine MHI (MITSUBISHI Heavy Industries) 250MW x 2 units
Generator for melco. - Fire protecting system (building, administrative office, warehouse,
any yard. - Life line wash system of switch yard (500 & 220KV) Siemens. - Hydrogen gas plant. - Fire Fighting Systems such as Wet/Dry Riser, Sprinkler, Foam
System-Fixed, Deluge, HRSG for NEM Company no. 2. - Steam turbine for Ansaldo Energia 250MW, CP-106. - GIS switch yard for SIEMENS Company.
Dates : From Oct. 2007 till Oct. 2008
Employer : National Guard in Jeddah KSA
Project : Contract with the National Guard in El-Malek Khaled Hospital Jeddah
Job title : Project Constructions & Commissioning Engineer
Job Description : Responsible for supervising technical specification and construction activities, supervise the contract package schedule and related financial, technical specifications for approving designs & submittals from vendors and check the suitability of the submitted specifications to the required contracted specifications, which also includes assigning the incompatible specifications and making additional implementations if necessary.
Attend electrical activity progress meetings and make sure that site activities are in line with project schedule.
Coordinate all electrical activities (mechanical equipment installation) with other disciplines i.e. civil, mechanical.
Review and approve MRRs (Material Receiving Reports).
Review and approve contractors progress invoices.
Dates : From Oct. 2005 till Oct. 2007
Project : Mahmoudia Power Station
Job title : Operation Engineer
Job Description : Preparing of routine, preventive and breakdown maintenance of gas & steam turbines.
Coordinate all electrical activities (electrical equipment maintenance) with other divisions i.e. mechanical by ensuring good safety practices in work.
Attending & participation of 3 outage of 3 gas turbines units 5, 6, 7 for maintenance for 3 months.
The above mentioned operations were actually done for: - 8 GE gas turbine 25MW each (MS5001 Frame P).