YYaa nn bb uu EE xx pp oo r r tt RR ee f f iinn ee r r yy PP r r oo j j ee cc tt PROJECT PROCEDURE MANUAL (PPM)
YERP-SAEP-1143, Radiographic ExaminationDocument No.: 100-YER-PM-PPM-0524
Revision No.: 1 Issue Date: 13 October 2009
General Business Confidential
Page 2 of 8
PREFACE
This procedure is a revision or an overlay to a Saudi Aramco Engineering Procedure(SAEP) for the scope of the Yanbu Export Refinery Project, YERP, unlessspecifically defined as a New document. A YERP procedure consists of a revision oran overlay and the Saudi Aramco (SA) document with the same name. An overlayestablishes any required changes to the SA document and specifically defines thechanges. If the SA document is to be used without any changes the overlay willstate there are no changes required. If the document is a new YERP document, withno reference to a SA procedure, the overlay will state it.
The YERP Procedure Index identifies which YERP documents are new and the ones
that relate to SA documents that are unchanged, changed, or deleted. All references to SA procedures, specifications and standards are to be defined asreferences to YERP procedures, specifications and standards unless specificallystated otherwise in the overlay.
All references to SA organizations are to be defined as the YERP ManagementTeam.
Interpret the following as specified: Revise A specific revision to a SA or other Code paragraph or sentence as
noted in this specification
Add continuation of an SA or other Code paragraph with an overlayrequirement Substitute replace the SA or other Code paragraph in entirety by the overlay
requirement New New paragraph number in the overlay with no corresponding SA or other
Code paragraph Delete SA or other Code paragraph is deleted by the overlay
REVISION
This is a new YERP document that replaces Saudi Aramco Engineering
Procedure (SAEP), SAEP-1143 Radiographic Examination, 29 May 2002. ATTA CHMENT
None This is a stand alone document that replaces SAEP-1143, RadiographicExamination.
1
1
-
8/14/2019 100-YER-PM-PPM-0524
3/8
YYaa nn bb uu EE xx pp oo r r tt RR ee f f iinn ee r r yy PP r r oo j j ee cc tt PROJECT PROCEDURE MANUAL (PPM)
YERP-SAEP-1143, Radiographic ExaminationDocument No.: 100-YER-PM-PPM-0524
Revision No.: 1 Issue Date: 13 October 2009
General Business Confidential
Page 3 of 8
TABLE OF CONTENTS
1.0 SCOPE..................................................................................................................4
2.0 CONFLICTS AND DEVIATIONS ..........................................................................4
3.0 REFERENCES...................................................................................................... 4
3.1 YERP References ................................................................................................ 4
3.2 Indust ry Codes and Standards ..........................................................................4
4.0 DEFINITIONS AND ABBREVIATIONS ................................................................5
4.1 Defini tions ............................................................................................................5
4.2 Abbreviations .......... .......... ........... .......... ........... ........... .......... ........... .......... ........ 6
5.0 REQUIREMENTS ................................................................................................. 6
5.1 Preparatio n of Radiographic Examination Procedures ................................... 6
5.2 Safety Requirements...........................................................................................6
5.3 Equipment and Materi als .................................................................................... 6
5.4 Creating Radiographs ......................................................................................... 7
5.5 Radiographic Film Interp retation ....................................................................... 7
5.6 Radiograph Documentation ............................................................................... 7
6.0 YERP REVIEW OF PROCEDURES ..................................................................... 8
-
8/14/2019 100-YER-PM-PPM-0524
4/8
YYaa nn bb uu EE xx pp oo r r tt RR ee f f iinn ee r r yy PP r r oo j j ee cc tt PROJECT PROCEDURE MANUAL (PPM)
YERP-SAEP-1143, Radiographic ExaminationDocument No.: 100-YER-PM-PPM-0524
Revision No.: 1 Issue Date: 13 October 2009
General Business Confidential
Page 4 of 8
1.0 SCOPE
This procedure establishes the requirements for written procedures governing theradiographic examination of welds. This procedure applies to radiographicexaminations made by the Contractor or subcontractors to the Contractor, wherethese examinations are made onsite to the Yanbu Export Refinery Project.
This procedure does not apply to vendors performing radiographic examinations at amanufacturing facility. The requirements for vendor radiographic examinations aregiven in Project Standards and Specifications.
2.0 CONFLICTS AND DEVIATIONS
Any conflicts between this Procedure and other applicable YERP EngineeringProcedures (YERP SAEP), YERP Engineering Standards (YERP-SAES), YERPMaterials System Specifications (YERP-SAMSS), YERP Standard Drawings (YERP-SASD), or industry standards, codes, and forms shall be resolved in writing by thePMT.
Direct all requests to deviate from this Procedure in writing to the PMT, who shallfollow internal company procedure YERP-SAEP-302, Instructions for Obtaining aWaiver of a Mandatory YERP Engineering Requirements, and forward suchrequests to the appropriate channel for review and approval.
3.0 REFERENCES
3.1 YERP References
YERP Engin eering Procedures
YERP-SAEP-302 Instructions for Obtaining a Waiver of a MandatoryYERP Engineering Requirement
YERP-SAEP-1142 Qualification of Non-YERP NDT Personnel
YERP Project Procedures
Project Procedure 865 Radiation Control for Radiographic Services
3.2 Indust ry Codes and Standards
Am erican Soc iety o f Mech anical Eng ineers
ASME B31.1 Power Piping
ASME B31.3 Process Piping
ASME B31.4 Pipeline Transportation Systems for LiquidHydrocarbons and other Liquids
-
8/14/2019 100-YER-PM-PPM-0524
5/8
YYaa nn bb uu EE xx pp oo r r tt RR ee f f iinn ee r r yy PP r r oo j j ee cc tt PROJECT PROCEDURE MANUAL (PPM)
YERP-SAEP-1143, Radiographic ExaminationDocument No.: 100-YER-PM-PPM-0524
Revision No.: 1 Issue Date: 13 October 2009
General Business Confidential
Page 5 of 8
ASME B31.8 Gas Transmission & Distribution Piping Systems
ASME B46.1 Surface Texture
ASME SEC I Rules for Construction of Power Boilers
ASME SEC V Nondestructive Examination
ASME SEC VIII D1 Boiler and Pressure Vessel Code
ASME SEC IX Welding and Brazing Qualifications
Am erican Weld ing Soci ety
AWS D1.1 Structural Welding Code - Steel
Am erican Petr oleum Ins ti tu te API STD 650 Welded Steel Tanks for Oil Storage
API STD 1104 Welding of Pipelines and Related Facilities
Am erican Soc iety f or Testing & Mater ial s
ASTM E-94 Standard Guide for Radiographic Examination
ASTM E-747 Standard Practice for Design, Manufacture andMaterial Grouping Classification of Wire Image QualityIndicators (IQI) Used for Radiology
ASTM E-1079 Standard Practice for Calibration of Transmission.Densitometers
International Organization for Standardization
ISO 1027 Radiographic Image Quality Indicators for NDT -Principles and Identification
ISO 5580 Industrial Radiographic Illuminators - Min.Requirements
4.0 DEFINITIONS AND ABBREVIATIONS
4.1 Definitions
Contract Package A defined and designated portion of the Yanbu Export RefineryProject that is executed and managed as a unit.
Contract Package PMT The personnel of the YERP Project Management Teamassigned to manage a particular Contract Package.
Contractor or Contractors Any Design, Construction or Service Contractor(s);Manufacturer(s); Vendor(s); Government Agencies; and other similar organization(s)having a contractual relationship or a prospective contractual relationship with theCompany.
-
8/14/2019 100-YER-PM-PPM-0524
6/8
YYaa nn bb uu EE xx pp oo r r tt RR ee f f iinn ee r r yy PP r r oo j j ee cc tt PROJECT PROCEDURE MANUAL (PPM)
YERP-SAEP-1143, Radiographic ExaminationDocument No.: 100-YER-PM-PPM-0524
Revision No.: 1 Issue Date: 13 October 2009
General Business Confidential
Page 6 of 8
Onsite The areas of property that will contain the facilities to be built as part of theYERP project.
Vendor A company providing materials or equipment for the YERP projectaccording to the provisions of a Purchase Order.
YERP Project Management Team The group responsible for the management ofthe entire project and dedicated to the overall success, development and executionof the work and alignment across the numerous project interfaces.
YERP Welding Representativ e A welding engineer/inspector for the YERP PMTwho has the approval authority for project welding procedures.
4.2 AbbreviationsPMT Project Management Team
YERP Yanbu Export Refinery Project
5.0 REQUIRE MENTS
5.1 Preparation of Radiographic Examination Procedures
The Contractor is to prepare the radiographic examination procedures that will berequired for examinations to be performed by the Contractor. The Contractor willdecide if subcontractors are to generate their own procedures or whether thesubcontractors are to use procedures prepared by the Contractor. If radiographicexamination procedures are to be prepared by subcontractors, the Contractor shallbe responsible to make sure they are prepared, submitted, and approved.
5.2 Safety Requir ements
The procedures governing radiographic examinations need to specify the steps to betaken to prevent the excessive exposure of personnel to radiation. The requirementsof Project Procedure 865, Radiation Control for Radiographic Services, must befollowed.
5.3 Equipment and Materials
The radiographic examination procedures need to address the following aspects of
equipment and materials to be used. Acceptable Radiation Sources
Film including types, processing, and storage
Intensifying Screens
Image Quality Indicators
Viewing Facilities
-
8/14/2019 100-YER-PM-PPM-0524
7/8
YYaa nn bb uu EE xx pp oo r r tt RR ee f f iinn ee r r yy PP r r oo j j ee cc tt PROJECT PROCEDURE MANUAL (PPM)
YERP-SAEP-1143, Radiographic ExaminationDocument No.: 100-YER-PM-PPM-0524
Revision No.: 1 Issue Date: 13 October 2009
General Business Confidential
Page 7 of 8
5.4 Creating Radiographs
The radiographic examination procedures need to address the following aspects ofmaking or creating radiographs.
Surface Preparation
Single Wall Exposure
Double Wall Exposure
Single Wall Viewing
Double Wall Viewing
Selection of Radiation Energy Geometric Unsharpness
Location Markers including starting point and direction of numbering
Film Identification including item, weld, and date
Penetrameter including selection, placement, number, and density variation
Backscatter Radiation Detection
Film including number of sheets, number of exposures, and film density
5.5 Radiog raphic Film Interpretation
The radiographic examination procedures need to address the following aspects ofradiographic film interpretation.
Blemishes including fogging, streaks, stains, scratches, crimps, marks, andfalse indications
Penetrameter Clarity
Backscatter Radiation Allowance
Weld Acceptance Criteria including cracks, lack of fusion, incompletepenetration, inclusions, undercutting, porosity, and concavity
5.6 Radiograph DocumentationThe radiographic examination procedures need to address the following aspects ofradiograph documentation.
Radiography Reports including date, radiographer, weld identification,number of films, radiation description (source, type, strength, size, exposuretime, source distance), film (brand, type, processing), and film reviewer
Radiograph Retention and Storage
-
8/14/2019 100-YER-PM-PPM-0524
8/8
YYaa nn bb uu EE xx pp oo r r tt RR ee f f iinn ee r r yy PP r r oo j j ee cc tt PROJECT PROCEDURE MANUAL (PPM)
YERP-SAEP-1143, Radiographic ExaminationDocument No.: 100-YER-PM-PPM-0524
Revision No.: 1 Issue Date: 13 October 2009
General Business Confidential
Page 8 of 8
6.0 YERP REVIEW OF PROCEDURES
The Contractor will submit all applicable, Contractor and subcontractor, radiographicexamination procedures to the Contract Package PMT for YERP PMT review andcomment. The Contract Package PMT will forward the procedures to the YERPWelding Representative for review.
The YERP Welding Representative will comment on the procedures and return themto the Contract Package PMT for forwarding to the Contractor.
The Contractor will ensure that YERP comments are incorporated before theprocedures are used onsite. After YERP and Contractor comments have beenincorporated, the Contractor will approve subcontractor procedures.
The Contractor will ensure that all reviewed, applicable, Contractor andsubcontractor, radiographic examination procedures are available to the YERPinspectors onsite.