100% BID DOCUMENTS
Transcript of 100% BID DOCUMENTS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
VENT LINE
SOLAR WATER RETURN
SOLAR WATER SUPPLY
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
MAKE-UP WATER
CONDENSER WATER RETURN (TO TOWER)
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
CONDENSER WATER SUPPLY (FROM TOWER)
HOT WATER HEATING RETURN
HPS
HPR
MPS
MPR
LPS
LPR
PC
HWS
HWR
GHS
GHR
V
SWS
SWR
CWR
CHR
GCR
RL
RS
RHG
CWS
CHS
GCS
MW
D
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURNGRR
GRS
X EXISTING PIPE TO BE REMOVED
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDINGPIPING ACCESSORIES SEE DETAIL
PIPING ACCESSORIES SEE DETAILINVERTED BUCKET TRAP SET INCLUDING
FE
~
~
~
~
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENTAV
MANUAL AIR VENTMV
THERMOSTATIC TRAP SET INCLUDINGPIPING ACCESSORIES SEE DETAIL
QUICK-COUPLE HOSE CONNECTOR
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
HOSE CONNECTORWYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
WATER LEVEL CONTROLLERLC
FLOW METERM
A/E AAHX AB AAV ACC ACCH ACCUACU ACD
ACD-TP
AD AF AFCV AFF AFMD AFW AHU AMP AP APD ARI
AS ASME
AW AXF
B BD BDD BDR BFP BFT BG BHP BHW BHX BIW BMT BR BSC BT BTC BTU BTUH BWT
C CC CCD CD CD-1
CD-2
CENT CFH CFM CFT CFP CG CH CHP CHW CHR CHS CI CM CM CM/S CO CO2
COMP COP CP CR CS CSG CT CU CUH CV CW CWCCCWP CWR
CWS
D D-1 D-2 D-3 DB Db DD-1
DD-2
DDC DEG DF DIA DIW DP DP DPA DPS DX DXCC
EA EAT EC ECC ECU EDH EER EF EG EGS EGT EH EJ EMD ENT ER ERC ERP ESP ET ETO EUH EWC EWT EX.
F F&T FA FC FCU FCUCFCUH FCW
FD FD FF FHX
FM FOP FOT FOHX FPM FPS FPTU FR FRP FS FSTAT FT FT-LB FTR FV
GA GAL GH GPD GPH GPM GPR GS
H H&CWHAC HB HC HD HD HOA HP HP HPDT HPR
HPS
HRC HRD HRP
HRW HSTAT HTM HUM HVU HW HWC HWHC HWP HWR HWS HWUH HVD HX HZ H H&CW HAC HB HC HD HD HOA HP
HP HPDT HPR
HPS
HRC HRD HRP
HRW HSTAT HTM HUM HVU HW HWC HWHC HWP HWR HWS HWUHHVD HX HZ
I/O IAQ IBT ICF ICU ID IFB IN IN HGIN WCIN WGIN-LBIPLV IRH IS IU IV
J
kg kg/HR kPa kW kWh
L L/h L/m L/s
LAT LF LGT LH LPG LPR
LPRC LLHX LPS LPSC LSD LTCP LVG LVR LWT
M M/s
MA MAT MAU MAV MAXMB MBH MCA MER MERV
MH MHP MIN MMMOV MPR
MPS MRI MTD MVD MZ
NA NC NC NG NGFM NO NOAA
NOM NPLV NPSH NTS
OA OAG OAI OD OFM OR
P PA PC PCF PD PEF PF PG PGW PHC PPM PRS PRV PSI
PSIG PSS PSV PTAC
R/E RA RAD RAF RAHX RAT RCCH
RCU RD RDS REA RF RG RH RHC RHG RL RLA RO RPM RR RS RTU RV
SA SAD SAT SC SCFM SCI SCR SD SD SD-1 SD-2 SDPR SDR SDS SEN SF SG SH SHC SI SP SP GR SPD SPRV SPS SQ FT SR SS SSHX SSR ST SUH SV SVS SWHX
T & PCV
TAB TD TDH TDS TG TP TR TSP TSTAT TU TWU
UC UC UH UL URV
V VAF VAVVD VFD VHA VI VIV VP VPS VR VSD VUH
W WAG Wb WC WCCH WCCUWCHP WCPU WEF WF WFCVWFM WFMD WG WPD
YR
ARCHITECT / ENGINEERAIR TO AIR HEAT EXCHANGERAIR BLENDER
AUTOMATIC AIR VENTAIR COOLED CONDENSERAIR COOLED CHILLERAIR-COOLED CONDENSING UNITAIR CONDITIONING UNITAUTOMATIC CONTROLDAMPER,MODULATINGAUTOMATIC CONTROLDAMPER,TWO POSITIONACCESS DOORAFTER FILTER
AIR FLOW CONTROL VALVEABOVE FINISHED FLOORAIR FLOW MEASURING DEVICEAIR FOIL WHEEL (FAN)AIR-HANDLING UNITAMPERGE
ACCESS PANELAIR PRESSURE DROPAIR CONDITIONING ANDREFRIGERATION INSTITUTEAIR SEPARATORAMERICAN SOCIETY OF MECHANICALENGINEERSAIR WASHERAXIAL FLOW
BOILERBUTTERFLY DAMPERBACKDRAFT DAMPERBASE BOARD RADIATORBACKFLOW PREVENTERBOILER PLANT FIRE TUBEBOTTOM GRILLEBRAKE HORSEPOWERHOT WATER HEATING BOILERBOILER BLOWDOWN HEAT EXCHANGERBACKWARD INCLINED WHEEL (FAN)BONE MARROW TRANSPLANTBOTTOM REGISTERBIOLOGICAL SAFETY CABINETSBLOWOFF TANKBLOWOFF TANK CONTROL VALVEBRITISH THERMAL UNITBRITISH THERMAL UNIT PER HOURBOILER PLANT WATER TUBE
CENTIGRADE (CELCIUS)COOLING COILCOOLING COIL CONDENSATE DRAINCEILING DIFFUSERCONSTRUCTION DOCUMENTS(SUBMISSION1)CONSTRUCTION DOCUMENTS(SUBMISSION2)CENTRIFICAL
CUBIC FEET PER HOURCUBIC FEET PER MINUTECUBIC FEET
CHEMICAL FEED PUMPCEILING GRILLECHILLER
CHILLED WATER PUMPCHILLER WATERCHILLED WATER RETURNCHILLED WATER SUPPLYCAST IRON
CARBON MONOXIDECUBIC METER
CUBIC METER PER SECONDCLEAN OUT
CARBON DIOXODE
COMPRESSOR UNITCOEFFICIENT OF PERFORMANCECONDENSATE PUMPCEILING REGISTERCONDENSATE STORAGE TANKCLEAN STEAM GENERATORCOOLING TOWERCONDENSING UNITCABINET UNIT HEATERCONSTANT VOLUMECOLD WATER (POTABLE)CHILLED WATER COOLING COILCONDENSER WATER PUMPCONDENSER WATER RETURN (TOCOOLING TOWER)CONDENSER WATER SUPPLY(FROM COOLING TOWER)
DAMPER - AUTOMATICOUTDOOR AIR DAMPERRETURN AIR DAMPERRELIEF AIR DAMPERDECIBELS
DRY-BULB TEMPERATUREDESIGN DEVELOPMENT(SUBMISSION1)DESIGN DEVELOPMENT(SUBMISSION2)DIRECT DIGITAL CONTROLSDEGREEDIFFUSERDIAMETER
DEIONIZED WATERDEW POINT TEMPERATUREDIFFUSER PLATEDIFFERENTIAL PRESSURE ASSEMBLYDIFFERENTIAL PRESSURE SENSORDIRECT EXPANSIONDIRECT EXPANSION COOLING COIL
EXHAUST AIRENTERING AIR TEMPERATUREEVAPORATIVE COOLERENGINEERING CONTROL CENTEREVAPORATIVE CONDENSER UNITELECTRIC DUCT HEATERENERGY EFFICIENCY RATIOEXHAUST FANEXHAUST GRILLEEMERGENCY GAS SHUTOFFENTERING GLYCOL TEMPERATUREEXHAUST HOODEXPANSION JOINTEND OF MAIN DRIP (STEAM)ENTERING
EXHAUST REGISTERELECTRIC REHEAT COILELECTRIC RADIANT PANELEXTERNAL STATIC PRESSUREEXPANSION TANKETHYLENE OXIDEELECTRIC UNIT HEATEREVAPORATIVE WATER COOLERENTERING WATER TEMPERATUREEXISTING
FAHRENHEITFLOAT AND THERMOSTATICFREE AREA
FLEXIBLE CONNECTIONFAN COIL UNIT (4 PIPE)FAN COIL UNIT COOLING ONLYFAN COIL UNIT HEATING ONLYFORWARD CURVED WHEEL (FAN)
FLOOR DRAINFIRE DAMPERFINAL FILTERFLUE GAS/FEEDWATER HEATEXCHANGERFLOW METERFUEL OIL PUMPFUEL OIL TANKFUEL OIL HEAT EXCHANGERFEET PER MINUTEFEET PER SECONDFAN POWERED TERMINAL UNITFLOOR REGISTERFIBER REINFORCED POLYESTERFLOW SWITCHFREEZESTATFEET
FOOT-POUNDFIN TUBE RADIATIONFACE VELOCITY
GAUGEGALLONSGRAVITY HOODGALLONS PER DAYGALLONS PER HOURGALLONS PER MINUTEGAS PRESSURE REGULATORGALVANIZED STEEL
HUMIDIFERHOT & COLD WATERHOUSEKEEPING AID CLOSETHOSE BIBBHEATING COILHEADHOODHAND/OFF/AUTOMATICHEAT PUMPHORSEPOWERHIGH PRESSURE DRIP TRAPHIGH PRESSURE RETURN(STEAM CONDENSATE)HIGH PRESSURE SUPPLY(STEAM)HEAT RECOVERY COILHEAT RECOVERY DEVICEHYDRONIC RADIANT (CEILING)PANELHEAT RECOVERY WHEELHUMIDISTATHUMIDIFIER TERMINALHUMIDIFIER UNIT MOUNTEDHEATING AND VENTILATING UNITHOT WATERHOT WATER COILHOT WATER HEATING COILHEATING HOT WATER PUMPHEATING HOT WATER RETURNHEATING HOT WATER SUPPLYHOT WATER UNIT HEATERHOISTWAY VENT DAMPERHEAT EXCHANGERHERTZHUMIDIFERHOT & COLD WATERHOUSEKEEPING AID CLOSETHOSE BIBBHEATING COILHEADHOODHAND/OFF/AUTOMATICHEAT PUMP
HORSEPOWERHIGH PRESSURE DRIP TRAPHIGH PRESSURE RETURN(STEAM CONDENSATE)HIGH PRESSURE SUPPLY(STEAM)HEAT RECOVERY COILHEAT RECOVERY DEVICEHYDRONIC RADIANT (CEILING)PANEL
HEAT RECOVERY WHEELHUMIDISTATHUMIDIFIER TERMINALHUMIDIFIER UNIT MOUNTEDHEATING AND VENTILATING UNITHOT WATERHOT WATER COILHOT WATER HEATING COILHEATING HOT WATER PUMPHEATING HOT WATER RETURNHEATING HOT WATER SUPPLYHOT WATER UNIT HEATERHOISTWAY VENT DAMPERHEAT EXCHANGERHERTZ
INPUT/OUTPUTINDOOR AIR QUALITYINVERTED BUCKET TRAPIN-LINE CENTRIFUGAL FANINTENSIVE CARE UNITINSIDE DIAMETERINTEGRAL FACE AND BYPASSINCHES
INCHES OF MERCURYINCH WATER COLUMNINCH WATER GAUGEINCH-POUNDINTERGRATED PART LOAD VALUEINTRARED HEATERINSECT SCREENINDUCTION UNITINLET VANES
INTENTIALLY LEFT BLANK
KILOGRAMKILOGRAM PER HOURKILOPASCALKILOWATTKILOWATT HOUR
LITERLITERS PER HOUR (OR LITERS/HOUR)LITERS PER MINUTE (OR LITERS/MINUTE)LITERS PER SECOND (ORLITERS/SECOND)LEAVING AIR TEMPERATURELINEAR FOOT (FEET)LEAVING GLYCOL TEMPERATURELATENT HEATLIQUID PROPANE GASLOW PRESSURE RETURN (STEAMCONDENSATE)LOW PRESSURE STEAM RETURN (CLEAN)LIQUID TO LIQUID HEAT EXCHANGERLOW PRESSURE STEAMLOW PRESSURE STEAM (CLEAN)LSD LINEAR SLOT DIFFUSERLOCAL TEMPERATURE CONTROL PANELLEAVINGLOUVERLEAVING WATER TEMPERATURE
METER, SI UNITMETERS PER SECOND(OR METERS/SECOND)MIXED AIRMIXED AIR TEMPERATUREMAKE-UP AIR UNITMANUAL AIR VENTMAXIMUMMIXING BOX1000 BTUHMINIMUM BRANCH CIRCUIT AMPACITYMECHANICAL EQUIPMENT ROOMMINIMUM EFFICIENCY REPORTINGVALUEMANHOLEMOTOR HORSEPOWERMINIMUMMILLIMETERMOTOR OPERATED VALVEMEDIUM PRESSURE RETURN(STEAM CONDENSATE)MEDIUM PRESSURE STEAMMAGNETIC RESONANCE IMAGINGMEAN TEMPERATURE DIFFERENCEMANUAL VOLUME DAMPERMULTI-ZONE
NOT APPLICABLENOISE CRITERIANORMALLY CLOSEDNATURAL GASNATURAL GAS FLOWMETERNORMALLY OPENNATIONAL OCEANIC & ATMOSPHERICADMINISTRATIONNOMINALNON-STANDARD PART LOAD VALUENET POSITIVE SUCTION HEADNOT TO SCALE
OUTSIDE AIROUTSIDE AIR GRILLEOUTSIDE AIR INTAKEOUTSIDE DIAMETEROIL FLOWMETEROPERATING ROOM
PUMPPASCALPUMPED CONDENSATEPOUNDS PER CUBIC FOOT (FEET)PRESSURE DROPPROPELLER (TYPE) EXHAUST FANPRE-FILTERPRESSURE GAGEPROPYLENE GLYCOL-WATER (SOLUTION)PREHEAT COILPARTS PER MILLIONPRESSURE REGULATING (VALVE) STATIONPRESSURE REGULATING VALVEPOUNDS PER SQUARE INCHPOUNDS PER SQUARE INCH - ABSOLUTEPOUNDS PER SQUARE INCH - GAGEPRIMARY SECONDARY SYSTEMPRESSURE SAFETY VALVEPACKAGED TERMINAL AIR CONDITIONER
RETURN OR EXHAUSTRETURN AIRREFRIGERANT AIR DRYERRADIO FREQUENCYROTARY AIR HEAT EXCHANGERRETURN AIR TEMPERATUREREMOTE CONDENSER CHILLER
RECIPROCATING CHILLER UNITREFRIGERANT DISCHARGEROOM DATA SHEETSRELIEF AIRRETURN FANRETURN GRILLERELATIVE HUMIDITYREHEAT COILREFRIGERANT HOT GASREFRIGERANT LIQUID LINERUN LOAD AMPEREREVERSE OSMOSISREVOLUTIONS PER MINUTERETURN REGISTERREFRIGERANT SUCTIONROOF TOP UNITRELIEF VALVE
SUPPLY AIRSOUND ATTENUATING DEVICESUPPLY AIR TEMPERATURESHADING COEFFICIENTSTANDARD CUBIC FEET PER MINUTESPINAL CODE INJURYSILICON CONTROLLED RECTIFIERSMOKE DETECTORSUPPLY AIR DIFFUSERSCHEMATIC DESIGN (SUBMISSION1)SCHEMATIC DESIGN (SUBMISSION2)SMOKE DAMPERSMOKE DAMPER (RETURN)SMOKE DAMPER (SUPPLY)SENSIBLE HEATSUPPLY FANSUPPLY AIR GRILLESTEAM HUMIDIFIERSTEAM HEATING COILSQUARE INCHESSTATIC PRESSURESPECIFIC GRAVITYSUPPLY PROCESS AND DISTRIBUTIONSTEAM PRESSURE REDUCING VALVESTATIC PRESSURE SENSORSQUARE FOOT (FEET)SUPPLY AIR REGISTERSTAINLESS STEELSTEAM TO STEAM HEAT EXCHANGERSOLID SEPARATORSTEAM TRAPSTEAM UNIT HEATERSTEAM PRESSURE REDUCING VALVESTEAM VENT SILENCERSTEAM TO WATER HEAT EXCHANGER
TEMPERATURE AND PRESSURECONTROL VALVETESTING, ADJUSTING, BALANCETEMPERATURE DIFFERENCETOTAL DYNAMIC HEADTOTAL DISSOLVED SOLIDSTRANSFER GRILLETRAPTOP REGISTERTOTAL STATIC PRESSURETHERMOSTATTERMINAL UNITTHRU-WALL UNIT
UNDER CUTUNIT COOLERUNIT HEATERUNDERWRITERS LABORATORYUPBLAST UNIT VENTILATOR
VALVEVANE-AXIAL FANVARIABLE AIR VOLUMEVOLUME DAMPER (MANUAL OPPOSED BLADE)VARIABLE FREQUENCY DRIVEVETERANS HEALTH ADMINISTRATIONVIBRATION ISOLATORVARIABLE INLET VANESVACUUM PUMPVARIABLE PRIMARY SYSTEMVACUUM (STEAM CONDENSATE) RETURNVARIABLE SPEED DRIVEVERTICAL UNIT HEATER
WATTSWASTE ANETHESIA GASWET-BULB (TEMPERATURE)WATER COOLEDWATER COOLED CHILLERWATER COOLED CONDENSING UNITWATER COOLED HEAT PUMPSWATER COOLED PACKAGED UNITWALL EXHAUST FANWATER FILTERWATER FLOW CONTROL VALVEWATER FLOWMETERWATER FLOW MEASURING DEVICEWATER GAGEWATER SIDE PRESSURE DROP
YEAR
ROOF DRAIN
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
MEDICAL VACUUM
MEDICAL AIR
DOMESTIC HOW WATER RETURN, HOT WATER RETURN
STORM WATER, BELOW GRADE
STORM WATER
SANITARY SEWER, BELOW GRADE
DRAIN
DRINKING WATER SUPPLY
DRINKING WATER RETURN
NITROUS OXIDE
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
MA MA MA
MV MV MV
LA LA LA
LV LV LV
OA OA OA
IA IA IA
D D D
SAN SAN SAN
SD SD SD
SD SD SD
TWR TWR TWR
DWS DWS DWS
DWR DWR DWR
TWS TWS TWS
SANITARY SEWERSAN SAN SAN
SANITARY SEWER (OPTIONAL)SS SS SS
SOFTEN COLD WATERSCW SCW SCW
FILTERED COLD WATERFCW FCW FCW
N20 N20 N20
OXYGEN0 0 0
NITROGENN2 N2 N2
NATURAL GAS, BELOW GRADE
NATURAL GAS
NG NG NG
NG NG NG
FUEL OIL DISCHARGEFOD FOD FOD
FUEL OIL SUPPLYFOS FOS FOS
FUEL OIL RETURN
FUEL OIL VENT
FOR FOR FOR
FOV FOV FOV
100% BID DOCUMENTS
All concepts, ideas, design elements, plans,and details as shown on this document are thesole property of Viridian Architectural DesignInc. and shall not be used for any purposewithout prior expressed written consent. TheContracting Officer Representative shall bepermitted to retain copies for information andreference.
2020 E. Washington BoulevardSuite 200Fort Wayne, Indiana 46803PH: 260.424.4830www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NTS
FINISHED FLOOR
FINISHED WALL
18
"[4
50
mm
]
2'-9
"[8
25
mm
]3'-5
"[1
02
5m
m] SOLENOID
OPERATED FLUSHVALVE
GRAB BAR,SEE ARCH.DRAWINGS TRANSFORMER
IN JUNCTIONBOX
12"x16" [300x400mm]STAINLESS STEEL ACCESSDOOR WITH OPERATEDCYLINDER LOCK
MOUNT ELECTRONICSENSOR IN 12"x16"[300x400mm] PANEL
SOLENOID
BACK CHECKANGLE STOP
FOR F
IXTU
RE
HEI
GHTS
SEE
ARC
HIT
ECTU
RAL
DRAW
ING
S
CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
ADMINISTRATIVEASSISTANT
STORAGE /FILE ROOM
0048
CORRIDORC12
EXAM / TREATMENT0118
STORAGE0105
KITCHEN / MISC.0100
PHONE ROOM0050D
MECHANICAL ROOM0050F
ENGINEERING ROOM0050E
TOILET0100A
EXAM /TREATMENT
0122
RESTROOM0121
1
2LAV
3 3
SCALE: 1/2" = 1'-0"PLUMBING - DEMOLITION GROUND FLOOR PLAN
02.PD1001
DISCONNECT HOT, COLD, AND DRAIN FROM SINK AND REMOVE SINK, COMPLETE.
DISCONNECT AND REMOVE HOT AND COLD SUPPLIES FROM FAUCET TO FIXTUREISOLATION VALVES.
DISCONNECT FIXTURE AND ACCESSORIES AND REMOVE FOR CONSTRUCTION. FIXTUREAND ACCESSORIES SHALL BE REINSTALLED AFTER CONSTRUCTION.
1
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/ORSUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALLFINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THEINTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIARWITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THECONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BEHELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TOENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTINGSITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITYMAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALLSUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALSAND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BYTHE CONTRACTOR - DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRISAND DAMAGE DURING CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TOCOMPLETING ALL DEMOLITION WORK.
9. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEMDURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTORIS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OFCONSTRUCTION.
10. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING ANDDEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OFCONSTRUCTION.
100% BID DOCUMENTS
All concepts, ideas, design elements, plans,and details as shown on this document are thesole property of Viridian Architectural DesignInc. and shall not be used for any purposewithout prior expressed written consent. TheContracting Officer Representative shall bepermitted to retain copies for information andreference.
2020 E. Washington BoulevardSuite 200Fort Wayne, Indiana 46803PH: 260.424.4830www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE GROUND FLOORBUILDING #02 KEY PLAN
BATTLE CREEKVA MEDICAL CENTER N
RENOVATIONAREA
2
3
CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
EXAM /TREATMENT
0122
STORAGE /FILE ROOM
0048
CORRIDORC12
STORAGE0105
KITCHEN / MISC.0100
PHONE ROOM0050D
MECHANICAL ROOM0050F
ENGINEERING ROOM0050ETOILET
0100A
IMMEDIATE CARE0100
RESTROOM0121
1
TMV-1
TMV-12 3 2
SCALE: 1/2" = 1'-0"PLUMBING - GROUND FLOOR PLAN
02.PL1001
100% BID DOCUMENTS
All concepts, ideas, design elements, plans,and details as shown on this document are thesole property of Viridian Architectural DesignInc. and shall not be used for any purposewithout prior expressed written consent. TheContracting Officer Representative shall bepermitted to retain copies for information andreference.
2020 E. Washington BoulevardSuite 200Fort Wayne, Indiana 46803PH: 260.424.4830www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
1. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.
2. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALSAND EQUIPMENT WITH CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TOBEGINNING OF CONSTRUCTION.
3. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURINGTHE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TOCONTACT THE COR IMMEDIATELY.
INSTALL NEW MIXING VALVE. RUN HOT WATER SUPPLY FROM WALL TO TMV-1. BRANCHCOLD UP TO SINK AND TO TMV-1. RUN 110°F HOT WATER FROM MIXING VALVE UPTO SINK. CONNECT 1 1/4" DRAIN TO EXISTING STUB IN WALL.
REINSTALL FIXTURE AND ACCESSORIES.
INSTALL MIXING VALVE ON HOT SUPPLY. BRANCH COLD TO MIXING VALVE AND 110°FHOT FROM MIXING VALVE TO LAV.
1
NOT TO SCALE GROUND FLOORBUILDING #02 KEY PLAN
BATTLE CREEKVA MEDICAL CENTER N
RENOVATIONAREA
2
3
CONSTRUCTION LIMIT LINE CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CORRIDORC15
STAIRSS02
TOILET138A
BEDROOM138
ANTEROOM137
5
2
4
CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CORRIDORC12
CONFERENCE124
STAIRSS01
TOILET122A
BEDROOM122
ANTEROOM123
4
4
3
1
1
SCALE: 1/2" = 1'-0"PLUMBING - DEMOLITION FIRST FLOOR PLAN
82.PD1012
DISCONNECT AND REMOVE HOT AND COLD SUPPLIES FROM FAUCET TO FIXTUREISOLATION VALVES.
DISCONNECT HOT, COLD, AND DRAIN FROM SINK AND REMOVE SINK COMPLETE.
DISCONNECT WATER CLOSET AND FLUSH VALVE. REMOVE FIXTURE AND VALVE.
REMOVE FIXTURE, VALVES AND ACCESSORIES TO BE REINSTALLED LATER.
DISCONNECT AND REMOVE HOT AND COLD SUPPLIES FROM FAUCET TO FIXTUREISOLATION VALVES. REMOVE SINK COMPLETE.
1
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/ORSUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALLFINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THEINTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIARWITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THECONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BEHELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TOENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTINGSITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITYMAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALLSUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALSAND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BYTHE CONTRACTOR - DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRISAND DAMAGE DURING CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TOCOMPLETING ALL DEMOLITION WORK.
9. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEMDURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTORIS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OFCONSTRUCTION.
10. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING ANDDEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OFCONSTRUCTION.
100% BID DOCUMENTS
All concepts, ideas, design elements, plans,and details as shown on this document are thesole property of Viridian Architectural DesignInc. and shall not be used for any purposewithout prior expressed written consent. TheContracting Officer Representative shall bepermitted to retain copies for information andreference.
2020 E. Washington BoulevardSuite 200Fort Wayne, Indiana 46803PH: 260.424.4830www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
SCALE: 1/2" = 1'-0"PLUMBING - DEMOLITION FIRST FLOOR PLAN
82.PD1011
NOT TO SCALE FIRST FLOORBUILDING #82 KEY PLAN
BATTLE CREEKVA MEDICAL CENTER N
CB-1
RENOVATIONAREA
RENOVATIONAREA
2
3
4
5
CONSTRUCTION LIMIT LINE CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CORRIDORC15
STAIRSS02
BEDROOM138
ANTEROOM137
TOILET138A
1
P-408TMV-1
TMV-1
2
4
CONSTRUCTION LIMIT LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CONS
TRUC
TION
LIMIT
LINE
CORRIDORC12
CONFERENCE124
STAIRSS01
BEDROOM122
ANTEROOM123
TOILET122A
2
TMV-1
TMV-1
3
P-112
2
4
SCALE: 1/2" = 1'-0"PLUMBING - FIRST FLOOR PLAN
82.PL1012
100% BID DOCUMENTS
All concepts, ideas, design elements, plans,and details as shown on this document are thesole property of Viridian Architectural DesignInc. and shall not be used for any purposewithout prior expressed written consent. TheContracting Officer Representative shall bepermitted to retain copies for information andreference.
2020 E. Washington BoulevardSuite 200Fort Wayne, Indiana 46803PH: 260.424.4830www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
SCALE: 1/2" = 1'-0"PLUMBING - FIRST FLOOR PLAN
82.PL1011
NOT TO SCALE FIRST FLOORBUILDING #82 KEY PLAN
BATTLE CREEKVA MEDICAL CENTER N
CB-1
RENOVATIONAREA
RENOVATIONAREA
1. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.
2. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALSAND EQUIPMENT WITH CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TOBEGINNING OF CONSTRUCTION.
3. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURINGTHE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TOCONTACT THE COR IMMEDIATELY.
INSTALL NEW SINK AND MIXING VALVE. RUN HOT WATER SUPPLY FROM WALL TOTMV-1. BRANCH COLD UP TO SINK AND TO TMV-1. RUN 110°F HOT WATER FROMMIXING VALVE UP TO SINK. CONNECT 1 1/4" DRAIN TO EXISTING STUB IN WALL.
INSTALL NEW MIXING VAVLVE RUN HOT WATER SUPPLY FROM WALL TO TMV-1.BRANCH COLD UP TO SINK AND TO TMV-1. RUN 110°F HOT WATER FROM MIXINGVALVE UP TO SINK. CONNECT 1 1/4" DRAIN TO EXISTING STUB IN ALVE.WALL.
INSTALL NEW WATER CLOSET WITH BACK SPUD FOR FLUSH VALVE. REFER TO DETAILON SHEET PG001.
REINSTALL FIXTURE AND ACCESSORIES FROM PREVIOUS PHASE.
2
3
1
4