10 FLOOR AMENITY AREA - LoopNet...3D Views Corridor Conference Rooms Key Plan * This renderings are...
Transcript of 10 FLOOR AMENITY AREA - LoopNet...3D Views Corridor Conference Rooms Key Plan * This renderings are...
10TH FLOOR AMENITY AREA
JACOBS Buildings & Infrastructure
WORK LOUNGE SUPPORT GYMLANDING SOCIAL/ AMENITY SPACEMEETING ROOMS
2
3
4
5
7
68
11
FILE/COPY/PRINT
OPTIONAL TOWN HALL CONFIGURATIONS
HARWOOD CENTER- 10th Floor
11 October 2018 | 2
Space Planning Solution
9
Amenity Space: 9,350 ApproxGym: 3,650 sf Approx
TOTAL: 13,000 SF Approx.
Legend
1 ReceptionArea2 ManagementOffice3 CoffeeBreakArea4 PrepKitchen5 TouchDown/Printing6 TownHallspace/WorkLounge7 Servingcounter8 Screen/Projector9 DividerCurtain10 WineBar11 GamingArea12 FitnessCenter
1
1210
STOR.
TOTAL SEATING SHOWN: 88TOTAL SEATING SHOWN: 60
10TH FLOOR AMENITY AREA
15 August 2017 | 10
HARWOOD CENTER - Amenity Space. 10th Floor
JACOBS Buildings & Infrastructure
Birds Eye View
10TH FLOOR AMENITY AREA
JACOBS Buildings & Infrastructure
HARWOOD CENTER- 10th Floor
11 October 2018 | 7
3D ViewsReception
Key Plan
* This renderings are based on design presented on 7.12.208 and do not represent latest layout.
JACOBS Buildings & Infrastructure
HARWOOD CENTER- 10th Floor
11 October 2018 | 9
3D ViewsOpen Lounge and Wine Bar
Key Plan
* This renderings are based on design presented on 7.12.208 and do not represent latest layout.
JACOBS Buildings & Infrastructure
HARWOOD CENTER- 10th Floor
11 October 2018 | 8
3D ViewsCorridor Conference Rooms
Key Plan
* This renderings are based on design presented on 7.12.208 and do not represent latest layout.
JACOBS Buildings & Infrastructure
HARWOOD CENTER- 10th Floor
11 October 2018 | 12
3D ViewsFitness Center
Key Plan
* This renderings are based on design presented on 7.12.208 and do not represent latest layout.
RECEPTION AREA
FITNESS CENTERLOUNGE & WINE BAR
CORRIDOR CONFERENCE ROOMS
LOBBY RENOVATION
15 August 2017 | 2
HARWOOD CENTER - Lobby
JACOBS Buildings & Infrastructure
WAITING AREA/ LOUNGE RECEPTION DESK CAFESOCIAL/ AMENITY SPACE BUILDING CORE
Cafe Niches
DART User Entry
GarageUser Entry
MAIN Entry
Cafe
General Layout
LOBBY RENOVATION
15 August 2017 | 4
HARWOOD CENTER - Lobby
JACOBS Buildings & Infrastructure
Desk
LOBBY RENOVATION
15 August 2017 | 6
HARWOOD CENTER - Lobby
JACOBS Buildings & Infrastructure
Platform feature Wall