Working with D-Flow Flexible Mesh in the San Francisco Estuary
Gerben de Boer, Arthur van Dam, Ali Dastgheib, Edwin Elias, Bruce Jaffe, Bert Jagers, Noah Knowles, Herman Kernkamp,
Hans Los, Lisa Lucas, Dano Roelvink, Mick van der Wegen and others
2 2
500 km
California
San Francisco
Los Angeles
Sacramento
Courtesy J. Cloern
California
3
Delta
2
San F
ranci
sco B
ay
Sacramento R. San Joaquin R.
Sierra Nevada
Pacific Ocean
Courtesy J. Cloern
7
San Francisco Estuary
in the 1980s
• Area: ~1200 km2 • Average depth: 7 m• Median depth: 3 - 4 m• Deepest point: ~120 m (Golden Gate)
San Pablo Bay
Central Bay
Suisun Bay
South BayJaffe 2009
11 11
Cascade project
• 1.3 M USD• Financed by USGS and DWR California• Scientific approach to
study climate change impact on water quality dynamics
• Central place for D-Flow Flexible Mesh
12 12October 12, 2010
Flexibility: Orthogonal curvilinear grids + triangles + pentagons+…
13 13October 12, 2010
Flexibility: Orthogonal curvilinear grids + triangles + pentagons+…
20 20
Calibration periods
• Dec 16 1999 - Mar 16 2000 (high Q)
• Jul 16 2001 – Oct 16 2001 (low Q)
Water level plots at GGT
32 32
Modeling Scenarios CasCade 2
Impact of • Changing river flow (100 years)• Sea level rise (100 years)• Anthropogenic acts (10 years)
on• SSC and morphodynamics• Selenium contamination• Valve distribution and contamination• Phytoplankton growth
35 35
35
Biological Opinions Restrict Southerly Flows
SWP PumpsCVP Pumps
Stockton
Sacramento
37
Below Sea Level-8 -6 -3 -1 m
Land SubsidenceDue to Farming & Peat Soil Oxidation
-6.1 M (- 20 ft.)
-1.5 M (- 5 ft.)
- 4.6 M (- 15 ft.)
- 7.6 M (- 25 ft.)
38 38
SJ River
SJ RiverSWP PumpsSWP PumpsCVP PumpsCVP Pumps
Sac RiverSac River
StocktonStockton
SacramentoSacramento
Bay Delta Conservation PlanConveyance options
39 39
East Canal ~ $8 billion *
West Canal ~ $9 - 11 billion *
All Tunnel ~ $10 -12 billion *
BDCP New Delta Conveyance Cost Analysis
Bay-Delta Conservation Plan
39
Preliminary Subject to RevisionThanx to Peter Wijsman (Arcadis) for slides