1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the...

34
1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless communication of circuit loading from substation enabling generator to manage circuit loading to a specific level.

Transcript of 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the...

Page 1: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

1

Wayne DC9435 13.2kV multi-grounded Y

Emergency installation of 2MW Diesel internal to the distribution circuit

operated in parallel to grid uses wireless communication of circuit loading from substation enabling generator to manage circuit loading to a specific level.

Page 2: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

2

Richville 2.5 MVA, 41.57/4.8 kV Substation2MW Diesel Islanded to perform maintenance

17.5 miles of radial 41.57kV exposure feeds Richville and Quail Substations Richville Substation(rural substation in Michigan’s Thumb region)36 miles of 4.8kV deltaFeeds 384 customers A peak load of 1.5 MVA

Page 3: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

3

Milford - 1 MW Nat Gas

Huron Valley Middle School

Page 4: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

4

SEOCWA –Webster DC 371 Leased Water Board 500KW DG

Page 5: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

5

New 1.5MW 4.8kV direct connect blended fuel DG

Page 6: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

6

Keys to Siting

Page 7: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

7

Load Analysis for 2002 Summer

High

Date Time Hours Day Temp (oF)

7/1/2002 3pm - 9pm 6 Monday 95

7/2/2002 1pm - 10pm 9 Tuesday 96

7/3/2002 1pm - 9pm 8 Wednesday 97

7/4/2002 1pm - 7pm 6 Thursday 95

7/29/2002 3pm - 4pm 1 Monday 91

7/31/2002 3pm - 9pm 6 Wednesday 93

8/1/2002 1pm - 10pm 9 Thursday 92

Total Hours 45 Avg Temp 94.1

Page 8: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

8

Probable Run Time and Durations 97F4 days29 hrs

Summer 200226 day 90F+

0

100

200

300

400

500

600

6/1

Jun 1 - Sept 1

Gen

erat

or

Ou

tpu

t in

K

W Series1

93F3 days16 hrs

97F4 days29 hrs

1 PM-9 PM 3 PM-9 PM

Hrs 1-10 PM

Hrs 1-10 PM

Page 9: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

9

Noise – db verse distance

dB vs. Distance from Generator

30

40

50

60

70

80

90

0 100 200 300 400 500 600

Distance (ft)

dB

2 MW Diesel Generator

1 MW Natural GasGenerator

53

Our practice is to talk to neighbors within 300 ft

Page 10: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

10

The Lease“The great enemy of clear language is insincerity. When there

is a gap between one’s real and one’s declared aim, one

turns, as it were instinctively, to long words and exhausted

idioms, like a cuttlefish (octopus) squirting out ink”

George Orwell, “Politics and the English Language”

Keep it Simple

Copies of our beginning 3 page lease available on request

Page 11: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

11

Automatic Load Following

Page 12: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

12

Automatic Load FollowingAdair Load Data

0

500

1000

1500

2000

2500

3000

Time

kW

Generator Loadd

Trf Load

Total Load

Distribution Circuit Load

Transformer Load

Generator Load

Normal Rating

Emergency Rating

Page 13: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

13

Methods of Operation

Radio,Phone

Cell, Fiber

etc

Page 14: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

14

Estimating Loads

Page 15: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

15

Meter-in-a-Box

Load Current, Communication and AC Power cables

Page 16: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

16

Load Monitoring

Recording Ammeter CT

X and Z Phase current brought to meter

Switchgear Position

Sum the returns to get Y Phase

Page 17: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

17

Communications (Union Lake)

RTUGen Meter

Radio

PLC

DC Meter

Hard wire

Fiber

SOC/ROC via RDN

Page 18: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

18

DG Installations Load AnalysisDay-to-DayPeak 2002 2003 2004 2005 Project DG

Rating Hrs Hrs Hrs Hrs Cost AnnualLocation (Amps) Amps Above Above Above Above $ K Cost $ KAdair DC 322 408 650 182 81 - - 800 71Grosse Ile DC 500 637 45 3 40 234 3,800 64Shores DC 1770 493 553 22 2 41 122 4,000 64Union Lk DC 1688 524 750 265 55 188 410 1,700 61Wayne DC 9435 577 636 27 9 24 - 180 * 17Milford DC8103 590 726 - - 32 58 3,800 15Webster DC371 360 505 - - NA 75 1,200 15

Indicates that loadingreached emergency rating

200226 days of 90+

2003 2 days of 90+

2004 3 days of 90+

2005 20 days of 90+

Page 19: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

Premium Power

Page 20: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

20

Premium Power Customers Adell Broadcasting Alps Automotive Arctic Cold Storage ASC Global Beaumont Hospital Botsford Hospital Flat Rock Community Center Karmann Manufacturing Lawrence Tech Meadowbrook Insurance Metropolitan Baking SY Systems Trinity Health Care-Warde Labs Washtenaw Co (multiple locations) Wayne State UniversityGrand Total

600 kW

500 kW

750 kW

2,000 kW

300 kW

150 kW

500 kW

1,000 kW

300 kW

800 kW

600 kW

500 kW

600 kW

850 kW

300 kW

9,750 kW

Key Markets

Communications

Education

Food Service

Healthcare

Manufacturing

Municipal

Page 21: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

21

ASC IncorporatedDescription: 2000 kW diesel standby generator

with 3000 amp Closed-transition transfer switch

Location: Gibraltar, Michigan

Service: Keeping a Tier-1 auto parts manufacturing facility operating during utility power interruptions

Drivers: Avoided over $400k in line extension capital expenditureLower energy cost by moving to interruptible tariff

Support “just-in-time” delivery system

Status: Inservice September 2004

Page 22: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

Customer DG &

Interruptibles

Page 23: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

Customer DG & Interruptibles

Page 24: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

Questions & Discussion

Page 25: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

25

DTE’s Other DER Work

Annual Utility DG Conference (Apr 26-28, 2006) Hydrogen Power Park Next Energy Mobile Microgrid SCE’s E2I RFP Development GridApps – DoE, CTC, & Utilities DoE DER Penetration limits study Army Collaborative Tools – Disaster Recovery Voltage Regulation Study for CEC

EPRI Utility DER Integration Best Practices DoE DER Integration & Intentional Islanding

DoE Aggregation Communication & Control

Page 26: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

26

DoE DER Aggregation Communication and Control

EDD

Page 27: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

27

Hierarchical Control

Units available from a customer perspective

Level 2: Utility Concerns & Constraints

Level 1: Local Control

Level 3: Economic Dispatch of

Aggregated Units

Units available for economic dispatch

Page 28: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

28

DEW Modeling ConstraintsHours DG not available

Total run hours not to exceed e.g. diesel air permit limits

Set points

Real-time measurements

Primarily circuit head measurements with some SCADA internal to circuit

Load

Scale

Historical measurementsCustomer meter info and sales

Control

Power Flow

Page 29: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

29

Phase II DERs (Phase I + Phase II)

Type No. Units kW

Nat. Gas 16 4,575

Biogas 1 6,600

Diesel 6 8,350

Hydrogen/Nat. Gas Various 1,036

Load Reduction Substation 600

Micro turbine 3 460

Fuel Cell 2 10

Solar 2 26

Battery 1 200

TOTAL 21,457

Page 30: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

30

Summary of DER Benefits Customer

– Manage demand– Standby– Lower rates

Utility - Wires Company

– Customer retention– Manage loading

On peak Shutdowns Emergency

Utility - Generation Company

– Energy– Capacity

Page 31: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

31

Conclusion

Win – Win (important that utility derive benefits also) Aggregation and Sale can be done through the utility Do not discourage participation with onerous rules and

penalties DER are also important for sticks and wires (not just

generation capacity and energy) Unity power factor at the point of Common Coupling

(DGs to put out vars for voltage and var support also) Utilities need to experiment with DER

Page 32: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

Questions & Discussion

Page 33: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

33

Distributed Generation in sellback mode

Distributed Generation parallel non-sellback mode

Standby Generator non-parallel non-sellback mode

Interruptible Load

PCC

Sell Back

PCC

II - NonSell Back

PCC

Standby

Interruptible

Page 34: 1 Wayne DC9435 13.2kV multi-grounded Y Emergency installation of 2MW Diesel internal to the distribution circuit operated in parallel to grid uses wireless.

34

Case Study

T&D Substation Expansion $4,000K $400K DR 1 DR Capital Cost $ 880K $ 88K O&M $ 15K $ 15KDR1 Total Cost $ 895K $103K DR2 DR Capital Installation $ 150K $ 15K O&M $ 15K $ 15KDR2 Installation Total Cost $ 165K $ 30K

The installation of the DER is a more economic alternative for the initial deferral of the substation, here again because of having already purchased the DER the saving are even greater.