1 Utility Board Training: Technical Capacity. 2 Introduction Request for training identified Local...
-
Upload
jodie-baldwin -
Category
Documents
-
view
216 -
download
0
Transcript of 1 Utility Board Training: Technical Capacity. 2 Introduction Request for training identified Local...
1
Utility Board Training: Technical Capacity
2
Introduction
Request for training identified Local utility boards Funders Regulators
Cooperative training effort Indiana Rural Community Assistance Program Alliance of Indiana Rural Water
3
Utility Board Training
This unit is part 3 of a three part training program Part 1: Managerial Capacity (February – April
2006) Part 2: Financial Capacity (May – August 2006) Part 3: Technical Capacity (September –
November 2006) What are the Board’s responsibilities of operating the
treatment systems? Who is responsible for environmental compliance?
4
Topics of Discussion
Four sections of discussion Operational Reporting Vulnerability Assessment/Emergency Response
Plans System/Plant Maintenance System/Plant Maintenance Logs
Two 45-minute sessions Two modules in each session Questions at any time
5
Topics of Discussion
What does having technical capacity mean to you? The treatment systems deliver clean safe
affordable water. The treatment systems meet regulatory
requirements. The treatment systems can meet demands.
6
MODULE 9
Operational Reporting
7
MODULE 9 SUMMARY Operational Reporting National Pollution Discharge Elimination System
(NPDES) Monthly Reports
1. Monthly Report of Operations2. Discharge Monitoring Report
Yearly Reports1. Land Application2. Water Withdraw
Emergency Reporting1. Boil Orders2. CSO Overflow
8
Reports
National Discharge Elimination System (NPDES) Types of Monthly Operating Reports
Monthly Report of Operations (MRO) Water Treatment Plant (reports based on treatment type)
MRO Wastewater Treatment Plant (reports based on treatment type)
Discharge Monitoring Report (DMR) Wastewater Plant
Emergency Reports Boil Orders CSO Overflows
9
The NPDES Permit
The governing board of the system is responsible to ensure compliance with the NPDES Permit.
What is the NPDES Permit Issued to all wastewater systems in the United States. Sets limits on what can be discharged to the receiving
streams based on plant treatment and type of receiving waters.
Sets monitoring/testing requirements. Who regulates the NPDES Permit.
10
The NPDES Permit (continued)
The main components of the NPDES Permit: Discharge Limits
Limits set on solids, Dissolved Oxygen, Oxygen Demand, Chlorine, ammonia and other.
Monitoring/Testing Requirements Sets testing requirements based on plant size, treatment
type and receiving waters. Regulator
Indiana Department of Environmental Management with oversight by US EPA
11
Monthly Reports
The main types of Monthly Reports:
Water Monthly Report of Operation (MRO)
Wastewater Monthly Report of Operation (MRO)
Wastewater Discharge Monitoring Report (DMR)
Land Application when Applying
12
Monthly Reports (continued) Water MRO
Records daily usage. Records Types and Amounts of Chemicals Used. Records daily testing results (based on system
type): 1. Disinfection levels (plant and system)2. PH level (plant raw and finished)3. Turbidity (plant raw and finished)4. Iron level (plant raw and finished)5. Hardness level (plant raw and finished)6. Alkalinity level (plant raw and finished)7. Manganese level (plant raw and finished)
Must be submitted by the 10th day of the following month.
13
Monthly Reports (continued) Wastewater MRO
Records daily flows. Records chemical usage. Monitors raw influent and final effluent. Records testing results as required on the NPDES Permit. Records precipitation. Records amount of time spent at plant. Records by-passes of plant and system.
Must be signed by the operator in responsible charge and the Board President or someone authorized by the Board
Must be submitted by the 28th day of the following month
14
Monthly Reports (continued)
Wastewater DMR Records same information as the MRO only on a
monthly basis.
Must be signed by Operator in Responsible Charge and Board President or Authorized Agent of Board.
Must be submitted by the 28th day of the following month.
15
Emergency Reports
Boil Orders Must be issued whenever water pressure drops below
20psi in the distribution system. May be issued by tv/radio announcement, newspaper
announcement or door to door announcement. Can not be lifted until two consecutive clean water
samples have been received. IDEM must be notified of the boil order within 24 hours
of issuance.
16
Emergency Reports (continued)
CSO Overflows Must notify IDEM within 24 hours of any by-pass from
either the treatment plant or collection system. Must advertise in local paper.
17
Activity and Resources
Resources: Monthly Reports
WW Monthly Report of Operation WW Discharge Monitoring Report Water Monthly Report
Emergency Reports Boil Order Advisory CSO Overflow Advisory
IDEM Sanitary Survey & Inspection Forms
18
MODULE 10
Vulnerability Assessment/Emergency Response Plans
19
MODULE 10 SUMMARY
Vulnerability Assessments/Emergency Response Plans Vulnerability Assessments Emergency Response Plans
20
Vulnerability Assessment
The Utilities Vulnerability Assessment (VA) Lists assets and equipment which are critical to
the utility Requires the utility to look at security factors in
their system All systems should complete a VA to better
protect their customers Assessment of Possible Threats
21
Vulnerability Assessment
Development of a Vulnerability Assessment: Preparation.
Developing a list of critical assets/equipment (ie: treatment plant, lift stations, booster stations, etc.)
List possible threats to system Ranking the assets
What assets are the most important to keeping your system in operation
Which is most important supplying water or supplying clean safe potable water in the event of an emergency
Security Issues Inspect your assets, are they protected from security risks?
22
Vulnerability Assessment
List potential security improvements to assets (ie: new fencing, better locks, motion detectors, lighting, etc.)
List all personnel in order of management List other personnel in order of management
(ie: Board Members, neighboring operators, contractors, etc.)
23
Emergency Response Plans (ERP)
The Utilities Emergency Response Plan List names and numbers of individuals to be
called in the event of an emergency in order of responsibility
List names and numbers of State/Federal Agencies to be contacted
List names and numbers of contractors, suppliers, and neighboring operators
List numbers to obtain bottled water and back up electrical needs
24
Emergency Response Plan
List names and numbers to local newspapers List names and numbers of local radio
stations List names and numbers of local television
stations
25
Vulnerability Assessments and Emergency
Response Plans should be updated on a yearly
basis.
26
Activities and Resources
Resources Sample Vulnerability Assessment Sample Emergency Response Plan
27
MODULE 11 SUMMARY
System and Plant Maintenance Water Plant Maintenance Water System Maintenance Wastewater Plant Maintenance Wastewater System Maintenance
28
Water Plant Maintenance
Recommended Maintenance Schedule Wells – flow tested on at least an every other year basis Pumps – follow manufactures recommendations on
changing oil, etc. Chemical Treatment Equipment – follow manufactures
recommendations Meters – calibrate on an annual basis
29
Water System Maintenance
Recommended Maintenance Schedules Storage Tanks – visual inspection yearly; drain and
inspect at least every five to ten years Booster Stations – follow manufacture
recommendations Water Mains – flush and flow test at least annually
more often depending on water quality Hydrants – should be inspected when flushing mains
and appropriate repairs made at that time. Should also be checked again before cold weather and pumped out if weep holes are plugged.
30
Water System Maintenance (Continued)
Valves – should be exercised at least once every four years. AWWA Standards recommended every year.
Meters Meters larger than 2” should be tested annually Meters under 2” should be tested at least once every
seven to ten years
Pressure Relief Valves – should be inspected annually
31
Water System Maintenance (Continued)
Back Flow Devices – should be inspected per State Plumbing Code recommendations.
32
Wastewater Plant Maintenance
Pumps – follow manufacture recommendations
Aerators – follow manufacture recommendations
Meters (flow) – calibrate annually Tanks – drain and clean at least annually Screening Devices – follow manufactures
recommendations
33
Wastewater Plant Maintenance (Continued)
Valves – exercise at least once every four to five years
Disinfection Equipment – follow manufactures recommendations
Lab Testing Equipment – follow manufactures recommendations
Bio-Solid Removal – based on plant process times
34
Wastewater System Maintenance
Mains – should be cleaned at least once every four to five years. Problem areas more frequently.
Manholes – should be cleaned at least once every four to five years.
Lift Stations – follow manufactures recommendations, should be inspected on a daily basis.
35
Wastewater System Maintenance (Continued)
Air Relief Valves – follow manufactures recommendations or at least once a year
Inflow/Infiltration (Suggestions to finding problems inexpensively):
Monitor manhole flow levels during dry conditions and during wet conditions
Smoke testing Video areas found to have higher flows during manhole
monitoring
36
MODULE 12
System and Plant Maintenance Logs
37
MODULE 12 SUMMARY, last one
System and Plant Maintenance Logs Plant Logs Plant Maintenance Logs System Logs System Maintenance Logs
38
Plant Logs Operator should keep a log book on all
operational changes made Logs should be kept on all testing Logs should be kept on weather conditions Logs should be kept on all repairs
39
Plant Maintenance Logs Logs should be kept on all maintenance performed
on each piece of equipment Logs should be kept on all tank cleaning
40
System Logs
Logs should be kept on all repairs Logs should be kept on all meter, shut off
locations Logs should be kept on all main testing
41
System Maintenance Logs Logs should be kept on all cleaning/flushing Logs should be kept on all flow testing Logs should be kept on all tank cleaning Logs should be kept on all valve work Logs should be kept on all hydrant work Logs should be kept on all booster/lift station
work
42
Resources
Resources Sample plant/system logs Sample plant/system maintenance logs
43
Alliance of IN Rural Water
P.O. Box 428
Beech Grove, IN 46107
Phone (888) 937-4992
www.inh2o.org
Indiana RCAP
1845 West 18th Street
Indianapolis, IN 46202
Phone (800) 382-9895
www.incap.org