1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees...

15
1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time production plus subcontracting plus inventory, the company will use backorders. Calculate the cost of this plan. C ostD ata Regulartim e laborcostperhour $10.00 O vertim e laborcostperhour $15.00 Subcontracting costperunit(laboronly) $84.00 Back ordercostperunitperperiod $20.00 Inventory holding costperunitperperiod $10.00 Hiring costperem ployee $600.00 Firing costperem ployee $450.00

Transcript of 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees...

Page 1: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

1

Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time production plus subcontracting plus inventory, the company will use backorders. Calculate the cost of this plan.

Cost DataRegular time labor cost per hour $10.00

Overtime labor cost per hour $15.00Subcontracting cost per unit (labor only) $84.00

Back order cost per unit per period $20.00Inventory holding cost per unit per period $10.00

Hiring cost per employee $600.00Firing cost per employee $450.00

Page 2: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

2

Capacity DataBeginning workforce (employees) 210

Beginning inventory (units) 400Production standard per unit (hours) 6

Regular time available per period (hours) 160Overtime available per period (hours) 32Subcontracting maximum per period 1000Subcontracting minimum per period 500

Demand Data (units)Period 1 6000Period 2 4800Period 3 7840Period 4 5200Period 5 6560Period 6 3600

Page 3: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

3

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory)Subcontracting

Ending InventoryBackorder

We calculate the regular-time production rate using a permanent workforce of 195 employees.

Regular-time available per period = 160 hoursNumber of employees = 195Production standard per unit = 6 hoursTherefore, regular-time production per period = (195 x 160) / 6 = 5200 units

Page 4: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

4

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600Subcontracting 500

Ending Inventory 100Backorder

We show the plan computation period by period.

inventory. ending asleft be willunits 100 Therefore,

ting.subcontrac in required is units 500 of minimum A

ting.subcontracby met is shortage The

units. 400 5200 - 5600 of shortagea have will we1, period in units 5200 produce weSince

units. 5600 400 - 6000 Inventory DemanddemandNet 0 period1 period1 period

Page 5: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

5

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700Subcontracting 500

Ending Inventory 100 500Backorder

We show the plan computation period by period.

inventory. ending asleft units 500 4700 - 5200

have will we2, period in units 5200 produce weSince

units. 4700 100 - 4800 Inventory DemanddemandNet 1 period2 period2 period

Page 6: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

6

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340Subcontracting 500 1000

Ending Inventory 100 500Backorder 1140

We show the plan computation period by period.

.backorders as units 1140 1000 - 2140 leave will weTherefore,

ting.subcontrac in allowed is units 1000 of maximum A

ting.subcontracby met is shortage The

units. 2140 5200 - 7340 of shortagea have will we3, period in units 5200 produce weSince

units. 7340 500 - 7840 inventory DemanddemandNet 2 period3 period3 period

Page 7: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

7

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340Subcontracting 500 1000 1000

Ending Inventory 100 500Backorder 1140 140

We show the plan computation period by period.

.backorders as units 140 1000-1140 leave will weTherefore,

ting.subcontrac in allowed is units 1000 of maximum A

ting.subcontracby met is shortage The

units. 1140 5200 - 6340 of shortagea have will we4, period in units 5200 produce weSince

units. 6340 1140 5200 BackorderDemanddemandNet 3 period4 period4 period

Page 8: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

8

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700Subcontracting 500 1000 1000 1000

Ending Inventory 100 500Backorder 1140 140 500

We show the plan computation period by period.

.backorders as units 5001000-1500 leave will weTherefore,

ting.subcontrac in allowed is units 1000 of maximum A

ting.subcontracby met is shortage The

units. 1500 5200 - 6700 of shortagea have will we5, period in units 5200 produce weSince

units. 6700 140 6560 BackorderDemanddemandNet 4 period5 period5 period

Page 9: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

9

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700 4100Subcontracting 500 1000 1000 1000

Ending Inventory 100 500 1100Backorder 1140 140 500

We show the plan computation period by period.

inventory. ending asleft units 1100 4100 - 5200

have will we6, period in units 5200 produce weSince

units. 4100 500 3600 BackorderDemanddemandNet 5 period6 period6 period

Page 10: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

10

Cost CalculationsRegular time labor cost $1,872,000

We compute the plan’s costs.

Regular time labor cost= regular labor cost per hour x total units of regular time production x labor standard per unit= $10 x (5200 x 6) x 6= $ 1872000

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700 4100Subcontracting 500 1000 1000 1000

Ending Inventory 100 500 1100Backorder 1140 140 500

Page 11: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

11

Cost CalculationsRegular time labor cost $1,872,000Subcontracting cost $294,000

We compute the plan’s costs.

Subcontracting cost= Total units of subcontracting x subcontracting cost per unit= (500 + 1000 + 1000 + 1000) x $84= $ 294000

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700 4100Subcontracting 500 1000 1000 1000

Ending Inventory 100 500 1100Backorder 1140 140 500

Page 12: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

12

Cost CalculationsRegular time labor cost $1,872,000

Subcontracting cost $294,000Inventory holding cost $17,000

We compute the plan’s costs.

Inventory holding cost= Total units of ending inventory x holding cost per unit per period= (100 + 500 +1100) x $10= $ 17000

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700 4100Subcontracting 500 1000 1000 1000

Ending Inventory 100 500 1100Backorder 1140 140 500

Page 13: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

13

Cost CalculationsRegular time labor cost $1,872,000

Subcontracting cost $294,000Inventory holding cost $17,000

Back order cost $35,600

We compute the plan’s costs.

Backorder cost= Total units of backorder x Backorder cost per unit per period= (1140 + 140 + 500) x $20= $ 35600

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700 4100Subcontracting 500 1000 1000 1000

Ending Inventory 100 500 1100Backorder 1140 140 500

Page 14: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

14

Cost CalculationsRegular time labor cost $1,872,000

Subcontracting cost $294,000Inventory holding cost $17,000

Back order cost $35,600Firing cost $6,750

We compute the plan’s costs.

Firing cost= (Beginning workforce – Current workforce) x Firing cost per employee= (210 - 195) x $450= $ 6750

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700 4100Subcontracting 500 1000 1000 1000

Ending Inventory 100 500 1100Backorder 1140 140 500

Page 15: 1 Use the data provided below, develop a hybrid plan using a permanent workforce of 195 employees supplemented by subcontracting. If demand exceeds regular-time.

15

Cost CalculationsRegular time labor cost $1,872,000

Subcontracting cost $294,000Inventory holding cost $17,000

Back order cost $35,600Firing cost $6,750Total Cost $2,225,350

We compute the plan’s costs.

Total plan cost= Regular time labor + Subcontracting + Holding + Backorder + Firing= 1872000 + 294000 + 17000 + 35600 + 6750= $ 2225350

1 2 3 4 5 6Beginning Inventory 400

Demand 6000 4800 7840 5200 6560 3600Regular Time Production 5200 5200 5200 5200 5200 5200

Net Demand (demand + backorder - inventory) 5600 4700 7340 6340 6700 4100Subcontracting 500 1000 1000 1000

Ending Inventory 100 500 1100Backorder 1140 140 500