1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

11
1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer

Transcript of 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

Page 1: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

1

Transitioning innovation projects to BaUDr Geraldine Bryson

Innovation Implementation Engineer

Page 2: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

2

Agenda

Fault Support CentreCapacity to Customers

C2C

BaU transitionQuestions and

answers

Page 3: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

3

What is Capacity to Customers?

Capacityto Customers

Utilisedcapacity

New commercialcontracts

Combines proven technology and new commercial contracts

Innovative demand side response contracts

Remote control equipment on HV circuit and close the NOP

Technicalinnovation

Latentcapacity

Currentdemand

Effectively doubles the available capacity of the circuit

Enhanced network management software

Capacity to Customers unlocks latent capacity on the electricity network

Facilitates connection of new demand and generation without reinforcement

Allow us to control a customer’s consumption on a

circuit at the time of fault

Page 4: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

4

C2C benefits summary

Releases network

capacity for use by customers’

LCTs

Creates post fault demand

response market which is less intrusive to

customers

Can defer reinforcement costs and the time taken to complete the associated

works

Full set of results and learning from Capacity to Customers is included in closedown report available on our website

Develops new DR market

Carbonreduction

Costdeferral

£Reinforcement

deferral

Rapidlydeployable

solution

Will better exploit existing

assets, thus cost-effective and quickly

implemented

Minimises carbon-

intensive infrastructure

Page 5: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

5

Fault Support Centre

Solution: Kelvatek’s Fault Support Centre (FSC) that will actively monitor the equipment installed on ENW’s LV network – trial under IFI

Only key ‘champions’ can perform this analysis

Devices are widely used to reduce CI and CML figures

Further benefits can be obtained from the data they

provide

Analysis of data is a specialised

subject area/training

issue

Page 6: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

6

FSC process flow

Transient identified

Electricity NW fit REZAP/Bidoyng/

TP22/23

Details sent to Kelvatek FSC

Fault location from Kelvatek to

Electricity NW

Confirm location

Repair fault

Page 7: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

7

FSC benefits

Actively monitors equipment installed on LV network

Faster fault location and repair

Identification of 2nd and 3rd faults on the network

Observation of fault ‘pecking’

Identifies circuits with overloading problems

Identifies areas with poor health

Helps us understand how best to use the LV kit

Fault Support Centre

business benefits

Page 8: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

8

BaU transition process

Reduced

connection costs

(Customer)

Increased

network efficiency

(ENW business plan)

C2C FSC

“Pushed”

into main business

“Pulled”

by main business

£

BaU

Page 9: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

9

BaU transition process

C2C FSC

Adds to planning processes

less tangible value

Changes to fault processes

value understood

Issues with bespoke technology solutions

Standard technology solution

Direct customer involvement

Indirect customer involvement

Page 10: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

10

Summary

• Important to get right• Not too time consuming

Processes

• Business champion a “must”

• Early business engagement and involvement

People

• Standard solutions• All necessary

procedures and training in place

Technology

• Difficult unless direct business benefit

Challenge

Page 11: 1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.

11

Want to know more?

Thank you for your time and attention

[email protected]

www.enwl.co.uk/thefuture

0800 195 4141

@ElecNW_News

linkedin.com/company/electricity-north-west

facebook.com/ElectricityNorthWest

youtube.com/ElectricityNorthWest

e