Transitioning innovation projects to BaUDr Geraldine Bryson
Innovation Implementation Engineer
2
Agenda
Fault Support CentreCapacity to Customers
C2C
BaU transitionQuestions and
answers
3
What is Capacity to Customers?
Capacityto Customers
Utilisedcapacity
New commercialcontracts
Combines proven technology and new commercial contracts
Innovative demand side response contracts
Remote control equipment on HV circuit and close the NOP
Technicalinnovation
Latentcapacity
Currentdemand
Effectively doubles the available capacity of the circuit
Enhanced network management software
Capacity to Customers unlocks latent capacity on the electricity network
Facilitates connection of new demand and generation without reinforcement
Allow us to control a customer’s consumption on a
circuit at the time of fault
4
C2C benefits summary
Releases network
capacity for use by customers’
LCTs
Creates post fault demand
response market which is less intrusive to
customers
Can defer reinforcement costs and the time taken to complete the associated
works
Full set of results and learning from Capacity to Customers is included in closedown report available on our website
Develops new DR market
Carbonreduction
Costdeferral
£Reinforcement
deferral
Rapidlydeployable
solution
Will better exploit existing
assets, thus cost-effective and quickly
implemented
Minimises carbon-
intensive infrastructure
5
Fault Support Centre
Solution: Kelvatek’s Fault Support Centre (FSC) that will actively monitor the equipment installed on ENW’s LV network – trial under IFI
Only key ‘champions’ can perform this analysis
Devices are widely used to reduce CI and CML figures
Further benefits can be obtained from the data they
provide
Analysis of data is a specialised
subject area/training
issue
6
FSC process flow
Transient identified
Electricity NW fit REZAP/Bidoyng/
TP22/23
Details sent to Kelvatek FSC
Fault location from Kelvatek to
Electricity NW
Confirm location
Repair fault
7
FSC benefits
Actively monitors equipment installed on LV network
Faster fault location and repair
Identification of 2nd and 3rd faults on the network
Observation of fault ‘pecking’
Identifies circuits with overloading problems
Identifies areas with poor health
Helps us understand how best to use the LV kit
Fault Support Centre
business benefits
8
BaU transition process
Reduced
connection costs
(Customer)
Increased
network efficiency
(ENW business plan)
C2C FSC
“Pushed”
into main business
“Pulled”
by main business
£
BaU
9
BaU transition process
C2C FSC
Adds to planning processes
less tangible value
Changes to fault processes
value understood
Issues with bespoke technology solutions
Standard technology solution
Direct customer involvement
Indirect customer involvement
10
Summary
• Important to get right• Not too time consuming
Processes
• Business champion a “must”
• Early business engagement and involvement
People
• Standard solutions• All necessary
procedures and training in place
Technology
• Difficult unless direct business benefit
Challenge
11
Want to know more?
Thank you for your time and attention