1. TPC FEEC Cooling System 1.1 Cooling modularity inside the detector

3
Miguel Santos, ST/CV Detector Cooling JCOV January 22nd, 2004 1. TPC FEEC Cooling System 1.1 Cooling modularity inside the detector Cooling of Read Out plane : 2 + 2 circuits C ooling ofBus Bars (Service SupportW heel) Cooling ofR OC covers Cooling of SSW and Covers : 2 + 2 circuits O ut In ROC FEEC 150 180 ROC1 ROC2 ROC3 ROC10 ROC4 ROC5 ROC6 ROC7 ROC8 ROC9 R O C11 R O C 12 R O C 13 R O C 14 R O C 15 R O C 16 R O C 17 R O C 18 Cooling of FEEC: 18 + 18 circuits

description

Cooling of FEEC: 18 + 18 circuits. Cooling of SSW and Covers : 2 + 2 circuits. Cooling of Read Out plane : 2 + 2 circuits. 1. TPC FEEC Cooling System 1.1 Cooling modularity inside the detector. Flow rate: FEEC: 36  1m 3 /h + Covers + Bus bars: 36  0.12 m 3 /h - PowerPoint PPT Presentation

Transcript of 1. TPC FEEC Cooling System 1.1 Cooling modularity inside the detector

Page 1: 1. TPC FEEC Cooling System 1.1  Cooling modularity inside the detector

Miguel Santos, ST/CV Detector CoolingJCOV January 22nd, 2004

1. TPC FEEC Cooling System

1.1 Cooling modularity inside the detector

Cooling of Read Out plane : 2 + 2 circuits

Cooling of Bus Bars

(Service Support Wheel)

Cooling of ROC covers

Cooling of SSW and Covers : 2 + 2 circuits

OutInROC

FEEC15

0

180

ROC1ROC2

ROC3

ROC10

ROC4

ROC5

ROC6

ROC7

ROC8

ROC9ROC11

ROC12

ROC13

ROC14

ROC15

ROC16

ROC17

ROC18

Cooling of FEEC: 18 + 18 circuits

Page 2: 1. TPC FEEC Cooling System 1.1  Cooling modularity inside the detector

Miguel Santos, ST/CV Detector CoolingJCOV January 22nd, 2004

1.2 Cooling Plant Operating Principle

Flow rate:FEEC: 36 1m3/h+ Covers + Bus bars: 360.12 m3/h+ Read out plane: 360.04 m3/h

Total flow: 42 m3/h

Total heat to be removed: FEEC: 36720W=25920WBus Bars: 3620W=720W

Total Heat: 26640W

Total Volume of water in the installation: 1200L

Installed Electrical Power:Pump: 11kVAHeaters: 64kVA

Total Power: 77kVA

Mixed Water Consumption: 30 m3/h

Number of Circuits: FEEC: 18+18Covers + SSW: 2+2Read Out plane: 2+2Goophy: 1

Total: 45

Mixedwater:

Shut-off valve

Temperature

sensor

Balancing valve

heater

Heat exchanger

Pressure transmitter

Vacuum pump

Liquid level transmitter

Pressure

transmitter

h=3m(base of TPC

detector)

h=9m(top of TPC

detector)

pump

reservoir

Page 3: 1. TPC FEEC Cooling System 1.1  Cooling modularity inside the detector

Miguel Santos, ST/CV Detector CoolingJCOV January 22nd, 2004

1.3 Regulation of Water Temperature

Water temperaturerequested by ECR PID

controllerTriac heater

Water temperatureat the heater outlet

Pt100

Twater atROC inletse 40

Travel time alongsupply line

~40 seconds

Water temperatureat the heater inlet

EMLBCanbusPLC

1800W per heater , 1m3/h => ~1.5ºC temperature differentiation between circuits.

Hence, the water temperature for each and every circuit can be tuned to any value between 18.5ºC and 20ºC

To detector

From supplymanifold

Heater

Balancing

valve

Temperature

sensorBall valve