Support Capabilities forAdvanced Launch Systems

RDT&E and OperationsNovember 6, 2010

Page 2: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

Spaceport America

2

• World’s first purpose-built

commercial spaceport

• Designed for next-gen

reusable space launch

vehicles

• Anchor tenant Virgin

Galactic w/20 year lease;

~$150-250M

• Vertical launch operations since 2006, horizontal operations in 12-24 months

• Economic Development,

Tourism, Education

Page 3: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.
Page 4: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.
Page 5: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

Advantages of Spaceport Location

Ideal Conditions for Space Access

Low Population

Density

RestrictedAirspace

5

High ElevationLow Latitude

Page 6: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

Runway

Access & Internal Roads

Underground Utilities

Fuel Storage

Terminal Hangar Facility

ARFF/Maintenance/Ops

Vertical Launch Area

Spaceport Site Layout

6

Page 7: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

7

Construction: Dreams to Reality

77

Page 8: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

8

Construction: Dreams to Reality

Photo used courtesy of Bob Martin 8

Page 9: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

9

Construction: Dreams to Reality

99

Page 10: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

10

Construction: Dreams to Reality

Photo used courtesy of Bob Martin 10

Page 11: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

11

Construction: Dreams to Reality

11

Page 12: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

12

Construction: Dreams to Reality

12

Page 13: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

Terminal Entrance Road

13

Page 14: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

Terminal Entrance Road

Page 15: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

15

Air Rescue Fire Fighting Facility

1515

Page 16: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

16

Aircraft Rescue and Firefighting Facility

1616

Page 17: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

17

Baseline: Where We Are Today

• Phase I Horizontal Launch Area Construction 80% Complete

Runway

Access & Internal Roads

Underground Utilities

Fuel Storage

Terminal Hangar Facility

ARFF/Maintenance/Ops

• Phase I Completion Scheduled for 1st/2nd Quarter 2011

AARON – Stunning Picture Here

Page 18: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

181818

Vertical Launch Complex

• UP Aerospace launch rail

– Has hosted

• 4 sounding rocket-class launches (2

exceeded 100 km altitude)

• 4 sub-scale fly-back booster ACTDs

• Lunar lander pads completed in July 2009

Page 19: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

191919

Vertical Launch Complex

Lunar Lander Pads

Launch Rail and Roll-back Shelter

Launch Control

Wind Prolfiler

Page 20: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

202020

Vertical Launch Complex

Page 21: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

21

Construction CommissioningPhase I

Construction

Phase II InfrastructureConstruction

Planning and Programming

Design Construction Commissioning

Operational Development

Documentation Phased ReadinessPreparation and Ramp-up

OperationalStart-up

Operations

VisitorExperience

ExperienceProgramming and Design Procurement

Procurement

VisitorFacilities

FacilityProgramming

Construction

Com

missioning

Planning

Procurement

Planning

ProcurementDesign

Installation Readiness P

rep

Operations

Operational S

tart-up

Planning

Future State: Where We’re Going

2011 20122010Rough

Timeframe

Page 22: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

Continued Phase II Construction

Site Infrastructure Expansion

Visitor Experience

• Welcome Centers – Sierra County and Hatch

• Visitor Complex – On-site

• Spaceport Entrance

• Fit-out of NMSA space in THF

• Wayfinding – on-site and off-site

• Site Master Planning

• Utility extension to Visitor Complex

• Utility extension to VLA

• Vertical Launch Area Expansion

• Horizontal Launch Area Expansion

• On-site / Off-site (Southern) Roads

AARON – Stunning Picture Here

Page 23: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

23

Operations Services

RFPs to be released throughout Q4 2010/Q1 2011

2. General Services:

• Facilities Maintenance

• Janitorial

• Ground Vehicle Maintenance

• Groundskeeping

• NMSA Fuel Handling

• Airfield Maintenance

1. Protective Services:

• Fire rescue

• Medical/EMT personnel

• Visitor Security

• Customer/Industrial Security

• Law Enforcement

• Crisis Management

Page 24: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

24

Operations Services

RFPs to be released throughout Q4 2010/Q1 2011

3. Technical Services:

• Ground Safety

• Flight Safety

• Mission Planning

• Airspace Management

• Scheduling

4. Visitor Services:

• Welcome Center

Management

• Transportation

• Concessions

• Restaurants

• Retail / Merchandising

• Onsite Visitor Management

• Exhibits / Interpretive Content

Page 25: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

25

Executive Director

General Counsel

Launch Operations

LicensingPermitting

DeputyDirector

TechnicalDivision

OperationsDivision

Administrative Division

Commercial Division

Flight Safety

Projects / Construction

Planning / Development

Spaceport Operations

- General Services- Emergency Services- Security Services- Visitor Services- Environmental- Ground Safety- Tenant Relations

FAA / WSMRRelations

Human Resources

FinanceAdmin

Services

Government Relations

Branding / Marketing

Media / PRCommunications

Organizational Structure

BusinessDevelopment

- Industry Attraction- Tourism Development- Education / Workforce- Economic Development

Page 26: 1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.

Questions?

Feel free to contact:

Bill GutmanTechnical DirectorNew Mexico Spaceport Authority

[email protected]

901 E. University Ave Bldg 3 Suite CLas Cruces, New Mexico 88001

Phone: 575-373-6110Fax: 575-373-6120