Transcript of 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP)...
![Page 1: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/1.jpg)
1
STEP
Southwest Southwest Transmission Expansion Transmission Expansion
PlanPlan
![Page 2: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/2.jpg)
2
Southwest Transmission Expansion Plan (STEP)
Subregional planning group formed in November of 2002 Coordinates planning interests from a variety of entities:
Transmission Owners Permitting Agencies Generation Developers Landowners Environmental groups Ratepayers
Broad involvement leads to better projects with broader support 26 alternative transmission plans were studied over the last 2+ years
that led to a single phased transmission expansion plan
![Page 3: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/3.jpg)
3
Current STEP Transmission Plan Has Four Phases
![Page 4: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/4.jpg)
4
Source: Cambridge Energy Research Associates, Platts POWERmap®.
Gates Peaker
Devers
Miguel
Lugo
Vincent
Midway
N. Gila
Moenkopi
Navajo (SRP)
Crystal River
Imperial Valley
Hassayampa
Eldorado
Palo Verde
Phase 1 – Arizona-California Short-term Upgrades
Voltage Support
Palo Verde-Devers 500 kV SC Upgrade
Hassayampa-North Gila-Imperial Valley 500 kV SC Upgrade
Imperial Valley phase shifting transformer
Approved by the ISO Board in June of 2004
Currently in engineering and construction
In-service date is June of 2006
Devers 500/230 kV Transformer
![Page 5: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/5.jpg)
5
Source: Cambridge Energy Research Associates, Platts POWERmap®.
Gates Peaker
Devers
Miguel
Lugo
Vincent
Midway
N. Gila
Moenkopi
Navajo (SRP)
Crystal River
Imperial Valley
Hassayampa
Eldorado
Palo Verde
Upgraded Line
Phase 2 – Arizona-Nevada Short-term Upgrades
Currently in the planning stage
In-service date of 2007 or 2008Navajo-Crystal 500 kV SC Upgrade
Moenkopi-Eldorado 500 kV SC Upgrade
Perkins-Mead 500 kV SC Upgrade
EOR 9000+
![Page 6: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/6.jpg)
6
Source: Cambridge Energy Research Associates, Platts POWERmap®.
Gates Peaker
Devers
Miguel
Lugo
Vincent
Midway
N. Gila
Moenkopi
Navajo (SRP)
Crystal River
Imperial Valley
Hassayampa
Eldorado
Palo Verde
Rebuilt 230 kV Lines
New Line
Palo VerdeDevers
Phase 3 - Palo Verde-Devers 500 kV #2
Approved by the ISO Board on February 24, 2005
In permitting at CPUC
Will be submitted to the ACC in early 2006
$680 million, In-service date of 2009
![Page 7: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/7.jpg)
7
Source: Cambridge Energy Research Associates, Platts POWERmap®.
Gates Peaker
Devers
Miguel
Lugo
Vincent
Midway
N. Gila
Moenkopi
Navajo (SRP)
Crystal River
Imperial Valley
Hassayampa
Eldorado
Palo Verde
Upgraded Line
New Line
Phase 4 - New 500 kV Line Into San Diego
In the planning stage
In-service date of 2011
Will help to deliver geothermal generation
![Page 8: 1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.](https://reader036.fdocuments.us/reader036/viewer/2022082817/56649e355503460f94b23a2c/html5/thumbnails/8.jpg)
8
Next STEP Meeting
June 29th in San Diego Contact Linda Wright for meeting information
[email protected] 916-351-2272