Transcript of 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones...
![Page 1: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/1.jpg)
1
Status of the V0 electronics
Tests of photomultipliers
Signal treatment Electronics Milestones
V0A
V0C
![Page 2: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/2.jpg)
2
Photo-multiplier
from T0 R5505 R5946 R7761
Tube/cathode Ø/length32/20/6
525/17.5/4
038/27/50 39/27/50
Number of stages 15 15 16 19
HVmax 2500 2300 2300 2300
Gain2000 V at 0 T/0.5 T2/1.6 105 5/2.3 105 106/4.3 105 107/3 106
Rise/transit (ns) 1.5/6 1.5/5.6 1.9/7.2 2.6/7.5
Dark current (typ/max) (nA)
5/20 5/30 5/30 15/100
Pulse linearity (2%) (mA) ? 180 360 500
![Page 3: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/3.jpg)
3
Charge, gain, time resolution
1916 19
16
15
Signal x 10 + 25 m cable
![Page 4: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/4.jpg)
4
Pulse treatment
PM Anodesignal
50 ohms
50 ohms
50 ohms
G=5
G=5
Signal amplitude3 mV – 3 V
(5 mV – 5 V)
Signal amplitude3 mV – 3 V
(5 mV – 5 V)
Signal amplitude15 mV – 300 mV
(25 mV – 300 mV)
Signal amplitude75 mV – 1.5 V
(125 mV – 1.5 V)
To TRDwake-up
To V0 FEEthreshold disri.
To V0 FEEQDC
G=5
G=1
Signal charge0.6 pC - 600 pC(1 pC - 1000 pC)
shaper NINO (0.1 – 2 pC) 2 ns
OR
Signal charge15 pC - ~2500 pC
(25 pC - ~2500 pC)
Signal charge15 pC - ~2500 pC
(25 pC - ~2500 pC)
![Page 5: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/5.jpg)
5
FEE data from V0C
V0ABBA (BBC)
BGA (BBC)BBA (BGC)
X 4 HPTDC (8 ch/chip)
dataL1 buff
buffer
data from V0A
L2
DAQ
L0
hit
ADC
ADC
NINO
NINO
THR
buffer
buffer
buffer
buffer
individual offsetcompensation
adjustable windows(step of 20 ps, range of 10 ns)
adjustable windows (.5 to 12 ns, step of .5 ns)
programmableintegration gate width
(from 3 ns to 36 ns, step of 3 ns)
+1 sum foreach ring
+
+
FPGA4
4
from V0C
1 sum for
each ring4
4from V0C
1 sum for
each ring4
4from V0C
programmable thresholds
BC
4
5 triggers, eg :- minimum bias- beam/gaz (right)- beam/gaz (left)- centrality- multiplicity
x 3
2 a
nodes
time
BB MB triggers
centrality triggers
THRcharge
THRmult
.
BGA BGC(V0C)
11 (3)+-
-
++
+BG MB triggers
multiplicity triggers
charge
![Page 6: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/6.jpg)
6
Timing for BB and BG
C
C
C
A
A
A
![Page 7: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/7.jpg)
7
Minimum-bias triggers Starting from the discriminator or the NINO signal BB signal detected in time windows centered at +11 ns (V0A) and +3 ns (V0C)
V0A
NINO
NINO
THR
buffer
buffer
adjustable windows(step of 20 ps, range of 10 ns)
adjustable windows (.5 to 12 ns, step of .5 ns)
BGA
BBA
+
+1 sum for
each ring4
1 sum for
each ring4
x 3
2 a
nodes
l t
BGC
BBC
+
+
-11 ns
+11 ns
V0C
-3 ns
+3 ns
A
C&
BB
BGCBGA BGA signal detected in time
windows centered at -11 ns (V0A) and +3 ns (V0C) BGC signal detected in time windows centered at +11 ns (V0A) and -3 ns (V0C)
bbc
bba
![Page 8: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/8.jpg)
8
V0 mechanics milestones• Fall 2004: • End 2004: • March 2005: sector ‘0’ of V0A (Mexico) and V0C (Lyon) PRR submission• Fall 2005: V0C ready for commissioning,… PMT characterization (Lyon) (MIP from each channel,… noise, gain of each PMT)
• End 2005: V0A ready for commissioning,… PMT characterization (Mexico)
(MIP from each channel,… noise, gain of each PMT)• Spring 2006: • June 2006: V0C ready for installation in ALICE (array + fibre bundles + PMT mechanics)• End 2006: V0A ready for installation in ALICE (array + fibre bundles + PMT mechanics)
Responsibles: Mechanics: J.Y. Grossiord (Lyon), XXXX (Mexico)
![Page 9: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/9.jpg)
9
V0 electronics milestones• Fall 2004: electronics concept finalization• End 2004: CIU design prototype test (charge, time, pre-process of
triggers)• March 2005: • Fall 2005: (final trigger signal, collection of the data, …interface TTC/FEE) CCIU and TTCIU design prototype test PRR submission• End 2005: CIU, CCIU, TTCIU electronic design, setting• Spring 2006: electronics design ready for realization• June 2006: electronics construction• End 2006: electronics test, calibration electronics ready for installation in ALICE
Responsibles: Electronics: Y. Zoccarato
![Page 10: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/10.jpg)
10
V0 milestones• Fall 2004: electronics concept finalization• End 2004: CIU design prototype test • March 2005: sector ‘0’ of V0A (Mexico) and V0C (Lyon) PRR submission• Fall 2005: V0C ready for commissioning, PMT characterisation (Lyon) CCIU and TTCIU design prototype test PRR submission• End 2005: V0A ready for commissioning (Mexico) CIU, CCIU, TTCIU electronical scheme• Spring 2006: electronics design ready for realization• June 2006: V0C ready for installation in ALICE electronics construction• End 2006: V0A ready for installation in ALICE electronics test, calibration electronics ready for installation in ALICE
Responsibles: Electronics: Y. Zoccarato Mechanics: J.Y. Grossiord (Lyon), XXXX (Mexico)
![Page 11: 1 Status of the V0 electronics Tests of photomultipliers Signal treatment Electronics Milestones V0A V0C.](https://reader035.fdocuments.us/reader035/viewer/2022071806/56649f525503460f94c76e2d/html5/thumbnails/11.jpg)
11
V0 cost for 64 channels (R5946)
label unit spar
e unit price total pricePM R5946 64 - 1712 109568
HV SY2527/A1733P 1/6 -8812/292
9 26386VME 1 - 9000 9000
Electronics 64 2 70000Mechanics PM +
boxes 2 - 1000 2000Scint. V0A/V0C (m2) 2 x .6 - 1500 1500
WLS F. V0A/V0C (m) 2 x 346 - 3.3 2284
Clear F. V0A/V0C (m)
2 x 3456 - 1.0 6912
Total in € 227650Total in SF 341475
HV cab. V0A/V0C (m) 270 - 5.8 1566
HV con. V0A/V0C (448) - 4756Sig. cab. V0A/V0C
(m)2 x
1600 - 2.0 6400
Sig. con. V0A/V0C(2 x 576) - 11136
Total in SF 365333