Transcript of 1 st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING April - 2009.
1st SENIOR PROGRAMME OFFICERSPERIODICAL ROUND TABLE MEETING
April - 2009
CFCU-1st SPOs Round Table Meeting-2009 2
TOPICS
I. Brief information of the structure of the CFCUII. General Overview to IPAIII. SPOs in IPA programmesIV. Brief info on the 2007 FAV. IPA Programming and Project Implementation
CycleVI. Role of the Senior Programme Officer and the
Project TeamVII. Written Source and References
CFCU-1st SPOs Round Table Meeting-2009 3
STRUCTURE OF THE CFCU
PAO – CFCU DIRECTOR
SENIOR CONTRACT MANAGER
SENIOR FINANCEMANAGER
ADMINISTRATIVEASSISTANT
ADVISOR TO PAO
QUALITY ASSURANCE ANDCONTROL DEPARTMENT
INTERNAL AUDIT
HUMAN RESOURCE ANDADMIN. AFFAIRS DEPT.
TENDERING / CONTRACTING SECTION
CONTRACT / PROJECT MANAGEMENT SECTION
GRANT SECTION TWINNING SECTIONREGISTRATION AND OWNPREV. FINANCIAL CONT.
FINANCIAL REPORTING & iPERSEUS
ACCOUNTING PAYMENT AUTHORIZATION
PAYMENT EXECUTION PAYMENT CONTROL
CFCU-1st SPOs Round Table Meeting-2009 4
General Overview to IPA
Component I - Transition Assistance and Institution Building
Component II - Cross-Border Cooperation
Component III - Regional Development Component IV - Human Resources
DevelopmentComponent V - Rural Development
CFCU-1st SPOs Round Table Meeting-2009 5
General Overview to IPA
CAO : State Minister in Charge of the Treasury NIPAC : Secretary General of EU Affairs NAO : Undersecretary of the Treasury Strategic Co-ordinator : State Planning Organisation Operating Structures
Comp III : MoEF, MoT, MoIT Comp IV : MoLSS
Implementing Agency Comp I-II : CFCU Comp III : CFCU (2007-2010) Comp IV : CFCU (2007-2010)
Audit Authority : Board of Treasury Controllers
CFCU-1st SPOs Round Table Meeting-2009 6
POSITION OF THE CFCU
The management of financial assistance to Turkey in Component-I is conferred by the EC on a decentralized basis to the CFCU on 29.10.2008.
CFCU-1st SPOs Round Table Meeting-2009 7
DIS STRUCTURE IN TURKEY
National IPA Coordinator (NIPAC) Financial Co-operation Committee (FCC) National Fund (NF) National Authorising Officer (NAO) Central Finance and Contracts Unit (CFCU) Programme Authorising Officer (PAO) Senior Programme Officers (SPO) Transition Assistance and Institution Building
Committee (TAIB Committee)
CFCU-1st SPOs Round Table Meeting-2009 8
GENERAL OVERVIEW OF THE STRUCTURE
CFCU-1st SPOs Round Table Meeting-2009 9
IPA FUNDS ALLOCATED (2007)
BUDGET(MEUR)
CONTRACTING AUTHORITY
OPERATING STRUCTURE
Component I - TAIB 252,2 CFCUCollection of Bodies (CFCU, SPOs etc.)
Component II - CBC 6,6
CFCU/MANAGING AUTHORITY-BULGARIA
Collection of Bodies (CFCU, SPOs etc.)
Component III - REGIO 167,5CFCU
(in the transition period)
Ministry of Environment and Forestry
Ministry of TransportMinistry of Industry and
Trade
Component IV - HR 50,2CFCU
(in the transition period)
Ministry of Labour and Social Security
Component V - AGRI 20,7 Ministry of Agriculture and Rural Affairs
CFCU-1st SPOs Round Table Meeting-2009 10
SPOs in IPA Component I (Article 75/3 of the IPA Regulation No.718/2007)
The SPOs are “designated” by the PAO
“Overall supervision” of the PAO was replaced with the “Overall Responsibility”
A “functional hierarchy” between the PAO and SPOs is foreseen.
CFCU-1st SPOs Round Table Meeting-2009 11
Chain of Accountability
The PAO is accountable to the NAO not only for the direct work of the CFCU but also for all the work of the Line Ministries/Agencies in respect of contracts and payments for which EU funding is sought.
This accountability gives the PAO both the right and duty to provide guidance on systems and control requirements to the SPOs – and to exercise close supervisory monitoring over how the Line Ministries/Agencies operate.
CFCU-1st SPOs Round Table Meeting-2009 12
Chain of Accountability
This accountability also gives the obligation on the Line Ministries/Agencies to fully cooperate with any supervisory actions the PAO may wish to undertake.
If the PAO is in any doubt as to the appropriateness or effectiveness of the work of the Line Ministries/ Agencies – either in respect of an individual transaction or more broadly with the way the systems and controls function he has the full right and duty to withhold his signature on any related contracts or payments which the Line Ministry/Agency is proposing for EU funding.
CFCU-1st SPOs Round Table Meeting-2009 13
Senior Programme Officers shall;
Be responsible for the technical aspect of the operations within the ministries.
Assist the programme authorising officers project in the good and timely preparation and implementation of operations at technical level.
Be in charge of the coordination within each priority axis set down in the beneficiary country’s project proposal.
CFCU-1st SPOs Round Table Meeting-2009 14
Overall Responsibility?
According to the European Commission,
It is not something limited to just a “supervision” on the top but also implies a “functional hierarchy” and therefore requires some quality/capacity related interventions including “mini-accreditation” over the SPOs.
PAO is accountable to the NAO for the actions of the SPOs
PAO must actively monitor the effectiveness of SPO controls
PAO must reject files submitted by an SPO not implementing effective controls.
CFCU-1st SPOs Round Table Meeting-2009 15
These fundamental principles lead CFCU/PAO to;
the control of the SPOs/LMs’ sub-systems
whether the SPOs and SPO Offices are ready to assume the responsibilities assigned to them in the Operational Agreements (OAs).
whether this initial readiness continues during the implementation of the project.
CFCU-1st SPOs Round Table Meeting-2009 16
some standards on the following areas need to be established
Minimum requirements for the staffing of the SPO offices
Minimum criteria for the internal organization of the SPO offices
CFCU-1st SPOs Round Table Meeting-2009 17
IPA- IR Article 11(3)
Where specific persons have been given responsibility for an activity in relation to the management, implementation and control of programmes,
the beneficiary country shall enable such persons to exercise the duties associated with that responsibility
including in cases where there is no hierarchical link between them…
CFCU-1st SPOs Round Table Meeting-2009 18
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
IPA Programming and
Project Implementation Cycle
CFCU-1st SPOs Round Table Meeting-2009 19
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
PROGRAMMING The Project Fiche (PF) is prepared and agreed between the involving institutions
The PF is submitted through the NIPAC to the EC. The EC prepares the Financing Proposal and submits it to the Management Committee for approval
The Management Committee approves the financial proposal with projects attached thereto. The FA is prepared by the EC
FA is signed by both EC and NIPAC and implementation starts
IPA Programming and Project Implementation Cycle-1
IMPLEMENTATIONFunds are FA specific and available for disbursement if
held and within an n+3 disbursement schedule from the signature of the underlying FA.
Contracting must take place
within 2 years of the signature of the FA; disbursement within
n+2+2+1These rules apply for all projects.
CFCU-1st SPOs Round Table Meeting-2009 20
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
IPA Programming and Project Implementation Cycle-2
Accession Partnership (AP)
9th Development PlanNegotiation Framework
Annual Enlargement StrategyRegular Report and Negotiations
Programming Phase-Commission Services- NIPAC- Line Ministries and Agencies
Working Document(Programme Document 1)
Quarter 4 in Year N-1
Commission DecisionMarking the budgetary
commitment
Quarter 3 in Year N
Financing AgreementCountry’s agreement with the
Commission
Qr. 3-4 in Year N
Financing AgreementNational Fund delegation
agreement with Implementing Agency
Quarter 1 in Year N+1
Implementation – Tenders, Contracts and Management
Derived directly from Project fiches Years N+1 and N+2
Monitoring and Assessment ReportsOn clusters of Financing Agreement in
years N+2 and N+3
Expiry and closing Audit of Financing Agreement
After N+3 generally
Ex-post Evaluation of Financing Agreement
N+3 and beyond
Implementation Phase
-Commission Services
-CFCU
-Line Ministries and Agencies
CFCU-1st SPOs Round Table Meeting-2009 21
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
IPA Programming and Project Implementation Cycle-3
Evaluation
Identification
Implementation
Management Actions
Monitoring Financing
Formulation
Programming
New Project &
Programme Ideas
interaction with
founders /adjustment
Project Implementatio
n Cycle
CFCU-1st SPOs Round Table Meeting-2009 22
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
IPA Programming and Project Implementation Cycle-4
PROGRAMMING
IMPLEMENTATION
CFCU-1st SPOs Round Table Meeting-2009 23
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Characteristics of “Good Projects”
Objectives:The project objectives match, or fall within, those of the funder and the appropriate national /regional development /sector strategies.
Internal Logic:The project should have a strong coherent internal logic as evidenced by a Logical Framework. In particular the declared monitoring indicators should be appropriate and realistic. Additional features of good projects are: quantified objectives, achievable targets (e.g. in terms of time or budget) and measurable impacts.
Technically Well-Prepared: In addition to the Log Frame, the project documentation should include the following: implementation schedule; task analysis; stakeholder involvement; required feasibility studies; tender dossier (as required); cost benefit analysis and a realistic budget with clearly marked sources of co-funding.
IPA Programming and Project Implementation Cycle-5
CFCU-1st SPOs Round Table Meeting-2009 24
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
PCM Principles Project cycle phases - structured & informed
decision-making, and feedback from evaluation
Partner / stakeholder ownership - involvement of stakeholders in decision-making, including emphasis on teamwork and communication
Logframe planning - comprehensive & consistent analysis
Integrated documentation - standardised documentation and assessment criteria
Can be applied to both projects and programmes
IPA Programming and Project Implementation Cycle-6
CFCU-1st SPOs Round Table Meeting-2009 25
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
PCM Objectives Sectoral/programme linkage
Demand driven approach
Improved analysis
Objective orientated planning
Verifiable results
Focus on sustainability
Learning from evaluation
Standardised formats
IPA Programming and Project Implementation Cycle-7
CFCU-1st SPOs Round Table Meeting-2009 26
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Role of the Senior Programme Officer and
the Project Team
CFCU-1st SPOs Round Table Meeting-2009 27
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
The role of the SPO (Article 5 in OA)
Efficient and effective use of EU and Turkish Government co-financing funds Achieving the project objectives Well-timed
The SPO is responsible for the: (Article 6 in OA)
Technical aspect of the operations within line ministry
Assist the PAO in the good and timely preparation and implementation of operations at technical level
Coordination within each priority axis set down in Turkey’s project proposal
Role of the SPO and the Project Team-1
CFCU-1st SPOs Round Table Meeting-2009 28
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Types of Institution Building Projects
Technical Assistance (TA)
Standard Twining
Role of the SPO and the Project Team-3
CFCU-1st SPOs Round Table Meeting-2009 29
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Management
Monitoring
Assistance to Evaluation
Supervise to Record Keeping
Role of the SPO and the Project Team-4
CFCU-1st SPOs Round Table Meeting-2009 30
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Risk assessment by the SPO
Role of the SPO and the Project Team-5
Probability
Impact
CFCU-1st SPOs Round Table Meeting-2009 31
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
The interpretation of risk assessment results by the SPO
Priority 1: Critical risks
Priority 2: Contingent risks
Priority 3: “Housekeeping risks”
Priority 4: Minor risks
Role of the SPO and the Project Team-6
CFCU-1st SPOs Round Table Meeting-2009 32
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Risk management process of the SPO
The risk manager responsibilities will include: Convening the initial risk assessment Convening the quarterly risk assessment meetings Identifying the key risk factors Receiving risk assessment statements Preparing risk assessment statements for the CFCU Maintaining the risk register Proposing risk minimization measures Follow up Contractors and Final Beneficiaries to ensure that
risk minimization measures have been implemented To organize a take part in on the spot-checks
Role of the SPO and the Project Team-7
CFCU-1st SPOs Round Table Meeting-2009 33
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Sensitive Post
At the level of SPO office, inventory of sensitive post and the corresponding policy to mitigate the risk involved in the positions identifying as sensitive must be in line with
“Sensitive Post Policy Paper”
Role of the SPO and the Project Team-8
CFCU-1st SPOs Round Table Meeting-2009 34
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
The SPO, as the Irregularity Officer:
Role of the SPO and the Project Team-9
IrregularityIrregularity means any infringement of a provision of Community or Turkish law (including, FAs, Operational Agreements) resulting from an act or omission by an economic operator (employee, natural or legal persons or other bodies recognised by national law), which has, or would have, the effect of prejudicing the general budget of the Communities or the state budget of Turkey by charging an unjustified item of expenditure to the budget.
FraudFraud means any intentional act or omission relating to:
The use or presentation of false, incorrect or incomplete statements or documents, which has as effect the misappropriation or wrongful retention of funds from the general budget of the European Communities or from the state budget of Turkey,Non-disclosure of information in violation of a specific obligation, with the same effect,
The misapplication of funds for purposes other than those for which they are originally granted
Reaction Reporting
Reaction Reporting
CFCU-1st SPOs Round Table Meeting-2009 35
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Role of the SPO and the Project Team-10
Human Resources
Requirements
EthicsPolicy
The SPO shall be responsible for ensuring that an adequate organisation, with sound internal procedures, is established within his/her line Ministry or Agency staffed by an appropriate number of qualified personnel to enable him/her to carry out the implementation of EU-funded projects in a timely, effective and efficient manner.
CFCU-1st SPOs Round Table Meeting-2009 36
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Written Source and References
CFCU-1st SPOs Round Table Meeting-2009 37
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Programme Management Guidelines
Part 1-Programme Implementation Manual (PIM)
Part 2-Project Operational Guide (POG)
Written Source and References- 1
CFCU-1st SPOs Round Table Meeting-2009 39
CFCU-1st SPOs Round Table Meeting-2009 40
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Part 1-Programme Implementation Manual (PIM)
Annexes
1. Operational Agreement CFCU/SPO<Ministry/Agency>
2. Memorandum of Understanding (MoU) on the Establishment of the CFCU http://www.cfcu.gov.tr/files/mutabakat_zapti.doc http://www.cfcu.gov.tr/files/addendum_no1_tr.doc
3. Framework Agreementhttp://www.cfcu.gov.tr/files/cerceve_anlasma.doc
Written Source and References-5
CFCU-1st SPOs Round Table Meeting-2009 41
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Part 1-Programme Implementation Manual (PIM)
Annexes4. Self Assessment Sheet
5. Project Fiche (PF) Template
6. Technical Specification (TS) GuidelineThese guidelines are designed to assist beneficiaries and technical specialists in preparing technical specifications that will afford equal access for tenderers and not have the effect of creating unjustified obstacles to competitive tendering. Another objective is that the specifications will allow tender evaluators to determine easily whether or not each offered feature or piece of equipment meets the specifications. Please keep these guidelines with you for reference throughout the preparation. Please also visit the following links:
http://ec.europa.eu/europeaid/work/procedures/implementation/practical_guide/documents/a11_b_it_guidelines_en.dochttp://ec.europa.eu/europeaid/work/procedures/implementation/practical_guide/documents/a11_c_guidelines_furniture_en.dochttp://ec.europa.eu/europeaid/work/procedures/implementation/practical_guide/documents/a11_d_guidelines_vehicles_en.doc
Written Source and References-6
CFCU-1st SPOs Round Table Meeting-2009 42
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Part 1-Programme Implementation Manual (PIM)
Annexes
Guide to Framework Contracts (FWC)http://ec.europa.eu/europeaid/work/framework-contract/beneficiaries/index_en.htm
Publicity and Visibilityhttp://europa.eu.int/comm/europeaid/visibility/index_en.htm.
Sensitive Post Policy Paper
Written Source and References-7
CFCU-1st SPOs Round Table Meeting-2009 43
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
NEXT STEPS
1. Self assessment sheet
All SPO to carry out their self-assessment on a regular basis and to report to the PAO accordingly.
2. Implement a site visits / spot-checks plan by the CFCU
3. Reporting to the NAO (NAO to inform the EC accordingly).
CFCU-1st SPOs Round Table Meeting-2009 44
Financing Agreement 2007 of IPA-I
PFs proposed Commented by the CFCU Concluded by the FCC Sent to the EC by the NIPAC Adopted by the EC on 20.12.2007
CFCU-1st SPOs Round Table Meeting-2009 45
Financing Agreement 2007 of IPA-I
Signed between the Turkish Government and the EC
o Head of the ECD (03.12.2008)o NIPAC (24.12.2008)
Entry into force on the date of signature by the second of the two parties: 24.12.2008
CFCU-1st SPOs Round Table Meeting-2009 46
Framework Agreement for IPA
Signed between the Turkish Government and the EC
Ratified by the TBMM on 03.12.2008
Sets out the general rules for cooperation and implementation of the Community assistance under the IPA
CFCU-1st SPOs Round Table Meeting-2009 47
Max. Community amount (€)
Budget line: 22.02.01
EU TR TOTAL
GENERAL 256.202.720,00 97.233.163 353.435.883
COMMUNITYPROGRAMMES (-) 58.512.770 67.224.080 125.736.850
CFCU 197.689.950 30.009.083 227.699.033
CFCU-1st SPOs Round Table Meeting-2009 48
THE DEADLINES
Contracting 2 years from the date of conclusion of this Agreement
Execution a maximum of 2 years from the end date of contracting.
Disbursement 1 year after the final date for the execution of contracts.
CFCU-1st SPOs Round Table Meeting-2009 49
Deadlines in detail
Documents Deadlines Explanations
Contracting Deadline
17.12.2010, Friday
-
Evaluation Reports01.10.2010,
Friday2.5 months before
contracting deadline
Contract files12.11.2010,
Friday1 month before
contracting deadline
Grant Technical Ev.Rep. (Step-III)
06.08.2010, Friday
4.5 months beforecontracting deadline
Grant Ver. of Eligibility
Rep. (Step-IV)
15.10.2010, Friday
2 months beforecontracting deadline
CFCU-1st SPOs Round Table Meeting-2009 50
THE 1st SENIOR PROGRAMME OFFICERS PERIODICAL ROUND TABLE MEETING
Thanks for your attention