Software Engineering: A Practitioner’s Software Engineering: A Practitioner’s Approach, 7/eApproach, 7/e
Chapter 2Chapter 2Process: A Generic ViewProcess: A Generic View
copyright © 1996, 2001, 2005
R.S. Pressman & Associates, Inc.
For University Use OnlyMay be reproduced ONLY for student use at the university level
when used in conjunction with Software Engineering: A Practitioner's Approach.Any other reproduction or use is expressly prohibited.
2
A Layered A Layered TechnologyTechnology
Software Engineering
a “quality” focusa “quality” focus
process modelprocess model
methodsmethods
toolstools
System Development Life CycleSystem Development Life Cycle
It is about developing a software-drivenIt is about developing a software-driven solution to a business problemsolution to a business problem It concerns a process which takes from two It concerns a process which takes from two
months to two yearsmonths to two years This is called a System Development Life Cycle This is called a System Development Life Cycle
but it should really be called a (Business) but it should really be called a (Business) Solution Development Life CycleSolution Development Life Cycle
3
Business Solution Business Solution CharacteristicsCharacteristics
A software-driven solution consists of two parts:A software-driven solution consists of two parts: ModelModel
PrototypesPrototypes Diagrams and supporting DocumentsDiagrams and supporting Documents
SystemSystem HardwareHardware SoftwareSoftware
4
Sample DeliverablesSample Deliverables Analysis:Analysis:
Use caseUse case Shows the dynamics between the users (actors) of the system and the Shows the dynamics between the users (actors) of the system and the
system itselfsystem itself This is a narrative representationThis is a narrative representation
Conceptual DiagramConceptual Diagram Shows the structure of the objects and their relationshipsShows the structure of the objects and their relationships This is a graphical representationThis is a graphical representation
System Sequence DiagramSystem Sequence Diagram Shows the dynamics between the users (actors) of the system and the Shows the dynamics between the users (actors) of the system and the
system itselfsystem itself This is a graphical representationThis is a graphical representation
ContractsContracts Shows the state of each object before each actionShows the state of each object before each action This is a narrative representationThis is a narrative representation
5
Sample High-level Sample High-level Architecture Design Logical Architecture Design Logical
BlueprintBlueprint
6
Sample Deliverables - DesignSample Deliverables - Design
Design:Design: Interaction DiagramInteraction Diagram
Shows the interaction between objectsShows the interaction between objects This is a graphic representationThis is a graphic representation It is a dynamic blueprintIt is a dynamic blueprint
Class DiagramClass Diagram Shows the structure between objectsShows the structure between objects Shows the structure inside objectsShows the structure inside objects This is a graphic representationThis is a graphic representation It is a static blueprintIt is a static blueprint
7
A Generic A Generic Process Process ModelModel
8
Identifying a Task SetIdentifying a Task Set
A task set defines the actual work to be done to A task set defines the actual work to be done to accomplish the objectives of a software accomplish the objectives of a software engineering actionengineering action
A list of the tasks to be accomplishedA list of the tasks to be accomplished A list of the work products to be producedA list of the work products to be produced A list of the quality assurance filters to be appliedA list of the quality assurance filters to be applied
9
10
A Process A Process FrameworkFramework
Process frameworkProcess frameworkFramework activitiesFramework activities
work taskswork taskswork productswork productsmilestones & deliverablesmilestones & deliverablesQA checkpointsQA checkpoints
Umbrella ActivitiesUmbrella Activities
11
Framework ActivitiesFramework Activities
CommunicationCommunication PlanningPlanning ModelingModeling
Analysis of requirementsAnalysis of requirements DesignDesign
ConstructionConstruction Code generationCode generation TestingTesting
DeploymentDeployment
12
Umbrella ActivitiesUmbrella Activities Software project managementSoftware project management Formal technical reviewsFormal technical reviews Software quality assuranceSoftware quality assurance Software configuration managementSoftware configuration management Work product preparation and Work product preparation and
productionproduction Reusability managementReusability management MeasurementMeasurement Risk managementRisk management
13
Process PatternsProcess Patterns Process patterns define a set of activities, Process patterns define a set of activities,
actions, work tasks, work products and/or related actions, work tasks, work products and/or related behaviorsbehaviors
A template is used to define a patternA template is used to define a pattern Typical examples:Typical examples:
Customer communication (a process activity)Customer communication (a process activity) Analysis (an action)Analysis (an action) Requirements gathering (a process task)Requirements gathering (a process task) Reviewing a work product (a process task)Reviewing a work product (a process task) Design model (a work product)Design model (a work product)
Process Pattern TypesProcess Pattern Types
Stage patterns Stage patterns - - defines a problem associated with a defines a problem associated with a framework activity for the processframework activity for the process
Task patterns Task patterns - - defines a problem associated with a defines a problem associated with a software engineering action or work task and software engineering action or work task and relevant to successful software engineering practicerelevant to successful software engineering practice
Phase patterns Phase patterns - - define the sequence of framework define the sequence of framework activities that occur with the process, even when activities that occur with the process, even when the overall flow of activities is iterative in naturethe overall flow of activities is iterative in nature
14
Waterfall ModelWaterfall Model
15
Incremental ModelIncremental Model
16
Evolutionary Model: SpiralEvolutionary Model: Spiral
17
Other ModelsOther Models
Component based development - Component based development - the process to the process to apply when reuse is a development objectiveapply when reuse is a development objective
Formal methods - Formal methods - emphasizes the mathematical emphasizes the mathematical specification of requirementsspecification of requirements
AOSD - AOSD - provides a process and methodological provides a process and methodological approach for defining, specifying, designing, and approach for defining, specifying, designing, and constructing constructing aspectsaspects
Unified Process - Unified Process - a “use-case driven, architecture-a “use-case driven, architecture-centric, iterative and incremental” software process centric, iterative and incremental” software process closely aligned with the Unified Modeling Language closely aligned with the Unified Modeling Language (UML)(UML)
18
UP PhasesUP Phases
19
Personal Software Personal Software Process(PSP)Process(PSP)
Planning.Planning. This activity isolates requirements and develops both size and resource This activity isolates requirements and develops both size and resource estimates. In addition, a defect estimate (the number of defects projected for the estimates. In addition, a defect estimate (the number of defects projected for the work) is made. All metrics are recorded on worksheets or templates. Finally, work) is made. All metrics are recorded on worksheets or templates. Finally, development tasks are identified and a project schedule is created.development tasks are identified and a project schedule is created.
High-level design. High-level design. External specifications for each component to be constructed External specifications for each component to be constructed are developed and a component design is created. Prototypes are built when are developed and a component design is created. Prototypes are built when uncertainty exists. All issues are recorded and tracked.uncertainty exists. All issues are recorded and tracked.
High-level design review.High-level design review. Formal verification methods are applied to uncover Formal verification methods are applied to uncover errors in the design. Metrics are maintained for all important tasks and work errors in the design. Metrics are maintained for all important tasks and work results.results.
Development. Development. The component level design is refined and reviewed. Code is The component level design is refined and reviewed. Code is generated, reviewed, compiled, and tested. Metrics are maintained for all generated, reviewed, compiled, and tested. Metrics are maintained for all important tasks and work results.important tasks and work results.
PostmortemPostmortem. . Using the measures and metrics collected (this is a substantial Using the measures and metrics collected (this is a substantial amount of data that should be analyzed statistically), the effectiveness of the amount of data that should be analyzed statistically), the effectiveness of the process is determined. Measures and metrics should provide guidance for process is determined. Measures and metrics should provide guidance for modifying the process to improve its effectiveness.modifying the process to improve its effectiveness.
20
22
The CMMIThe CMMI The CMMI defines each process area in terms of The CMMI defines each process area in terms of
“specific goals” and the “specific practices” “specific goals” and the “specific practices” required to achieve these goals.required to achieve these goals.
Specific goalsSpecific goals establish the characteristics that establish the characteristics that must exist if the activities implied by a process must exist if the activities implied by a process area are to be effective. area are to be effective.
Specific practicesSpecific practices refine a goal into a set of refine a goal into a set of process-related activities.process-related activities.
Homework #2Homework #2
Research and put together a comparative write-up or Research and put together a comparative write-up or traditional Process Models traditional Process Models (300 words max):(300 words max):
WaterfallWaterfall VV PhasedPhased EvolutionaryEvolutionary SpiralSpiral CBSECBSE RUPRUP PSP/TSPPSP/TSP
23
24
Process AssessmentProcess Assessment
The process should be assessed to ensure that it The process should be assessed to ensure that it meets a set of basic process criteria that have meets a set of basic process criteria that have been shown to be essential for a successful been shown to be essential for a successful software engineeringsoftware engineering.
Many different assessment options are available: Many different assessment options are available: SCAMPISCAMPI CBA IPICBA IPI SPICESPICE ISO 9001:2000ISO 9001:2000
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 25
Assessment and ImprovementAssessment and Improvement
Software Process
Software Process Assessment
is examined by identifies capabilitiesand risk of
identifiesmodifications to
Software Process Improvement
Capability Determination
leads to leads to
motivates
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 26
Personal Software Process Personal Software Process (PSP)(PSP)
Recommends five framework activities:Recommends five framework activities: PlanningPlanning High-level designHigh-level design High-level design reviewHigh-level design review DevelopmentDevelopment PostmortemPostmortem
stresses the need for each software stresses the need for each software engineer to identify errors early and as engineer to identify errors early and as important, to understand the types of important, to understand the types of errorserrors
27
Team Software Process (TSP)Team Software Process (TSP)
Each project is “launched” using a “script” Each project is “launched” using a “script” that defines the tasks to be accomplishedthat defines the tasks to be accomplished
Teams are self-directedTeams are self-directed Measurement is encouragedMeasurement is encouraged Measures are analyzed with the intent of Measures are analyzed with the intent of
improving the team processimproving the team process
28
The Primary Goal of Any Software The Primary Goal of Any Software Process: Process: High QualityHigh Quality
Remember:Remember:
High quality = project timelinessHigh quality = project timeliness
Why?Why?
Less rework!Less rework!