8/3/2019 1 Safety Management System
1/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 1 / 46
SMS
n 0606
TSO REV. : 0
KINGDOM OF SAUDI ARABIA
NORTH SOUTH RAILWAY PROJECT
NSR
(i)
-
-
8/3/2019 1 Safety Management System
2/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 2 / 46
SMS
n 0606
TSO REV. : 0
Drafted by :TSO
Ref. : SMS 0606 Rev. : 0
Follow-up of document
VALIDATION OF DOCUMENT
NAME AND FUNCTION Visa and date
Fabrice BARBEAU 09/10/06
-
8/3/2019 1 Safety Management System
3/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 3 / 46
SMS
n 0606
TSO REV. : 0
CONTENTS
NSR ............................................................................................................................................................................1
II. GENERAL ORGANIZATION ..................................................................................................................................5
A. POLICY AND ENGAGEMENT ............................................................................................................5B. OBJECT, APPLICABILITY AND DELIMITATION OF WORK ..............................................................6C. REFERENCE DOCUMENTS ..............................................................................................................6D. LIST OF PARTIES ..............................................................................................................................6
1. Contracting authority, Engineer and contractor ................................................................................... 62. Possible supplier ...................................................................................................................................73. Further information ..............................................................................................................................7
III. ORGANIZATIONS OF CONTROL AND SERVICE ...............................................................................................7
IV. ORGANIZATION OF SAFETY ..............................................................................................................................8
A. ORGANISATION CHART, AUTHORITIES AND RESPONSABILITIES OF THE MANAGEMENTTEAM ...............................................................................................................................................8
1. Project Director ....................................................................................................................................82. Project Manager ................................................................................................................................... 83. Deputy Project Manager .......................................................................................................................84. Safety Manager .................................................................................................................................... 9
5 R i t d S f t Offi 9
-
8/3/2019 1 Safety Management System
4/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 4 / 46
SMS
n 0606
TSO REV. : 0
A. PURPOSE .........................................................................................................................................15B. PARTICIPATION ...............................................................................................................................15C. FREQUENCY ....................................................................................................................................15D. PROCEDURE ...................................................................................................................................16E. TOPICS .............................................................................................................................................16
XI. INCIDENT INVESTIGATION AND ANALYSIS ....................................................................................................16A. OBJECTIVES :..................................................................................................................................16B. TREATEMENT :................................................................................................................................16C. REPORTING :...................................................................................................................................17D. SAFETY COMMITTEE MANAGER ...................................................................................................17E. INCIDENT REPORT PROCEDURE ..................................................................................................17
XII. IN-HOUSE SAFETY RULES AND REGULATIONS ...........................................................................................17
A. RULES AND REGULATIONS ...........................................................................................................17B. PERSONNAL PROTECTIVE EQUIPMENT ......................................................................................17C. COLOUR OF SAFETY HELMET .......................................................................................................18
XIII. SAFETY PROMOTION ......................................................................................................................................19
XIV. EVALUATION, SELECTION AND CONTROL OF SUB-CONTRACTOR ........................................................19
A. OBJECTIVES :..................................................................................................................................19B. COVERAGE :....................................................................................................................................19
XV MAINTENANCE REGIMES FOR ALL CONSTRUCTION PLANT EQUIPMENT AND TOOLS 21
-
8/3/2019 1 Safety Management System
5/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 5 / 46
SMS
n 0606
TSO REV. : 0
II. GENERAL ORGANIZATION
A. POLICY AND ENGAGEMENT
This policy applies to the Environmental aspects and Safety concerning the project ..
The elements of the policy expressed by the Management of the Construction site are declined according tofollowing points:
Adoption of a strategic vision by optimizing in a durable way the use of human, material and financial
resources available.
Improvement of the quality of our products and services by regularly measuring the level of satisfaction of
our customers to be able to satisfy in all circumstances their expressed and implicit needs.
The satisfaction of our partners by permanently adapting to current and future expectations of our
customers, collaborators, board of trustees and public bodies.
The involvement and training of the collaborators to give them in a targeted way increasing responsibility
and continuous training.
Ensure the Environmental protection, health and safety of our employees by protecting their working station
and by developing a methods and procedures respectful of the environment.
-
8/3/2019 1 Safety Management System
6/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 6 / 46
SMS
n 0606
TSO REV. : 0
B. OBJECT, APPLICABILITY AND DELIMITATION OF WORK
The direction of the construction site ensures the respect of this S.M.S. This plan defines all the elementsof organization contributing to the respect of safety and makes reference to the general procedures,procedures specific, process or instructions of building site.
C. REFERENCE DOCUMENTS
Contract documents STTSO documentsThe form of tender with attachments Quality Manual Management (QMM)
The particular conditions and appendices Safety Management Manual (SMM)
The specifications (the particular specification withappendices, the general specification withappendices, design criteria and performancespecification, the materials and workmanshipspecifications and, the drawing and CAD standard)
ProcessusGenerales and specifiques procedures
-
8/3/2019 1 Safety Management System
7/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 7 / 46
SMS
n 0606
TSO REV. : 0
2. Possible supplier
Refer to the Project Quality Manual
3. Further information
Period of execution
Beginning of work :
End of work : ..
Schedules of work
Day :
.
Night : Only in exceptional circumstances
manpower
Average :
Maxim um :
Staging Area .
Office
Work Site .
-
8/3/2019 1 Safety Management System
8/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 8 / 46
SMS
n 0606
TSO REV. : 0
IV. ORGANIZATION OF SAFETY
A. ORGANISATION CHART, AUTHORITIES AND RESPONSABILITIES OF THE MANAGEMENT TEAM
Project Director
Project Manager Deputy ProjectManager
Safety Manager
Works TrainSafety Team
Storage aeraSafety Team
Lifti ti L i t k
-
8/3/2019 1 Safety Management System
9/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 9 / 46
SMS
n 0606
TSO REV. : 0
4. Safety Manager
The Safety Manager reports directly to the Project Director and is in charge of the definition and application of theon Site Safety Management System. He is overall responsible for the general safety. His responsibility includes :
Setting up the safety organisation. Particularly he draws up the Site Safety Plan and the associated
procedures. Ensuring that suitably qualified Registered Safety Officers (RSO) are employed. Ensuring that suitably qualified Registered Environmental Control Officers (RECO) are employed. Ensuring that suitably experienced Site Safety Supervisors (SSS) are employed. Ensuring compliance with applicable Health and Safety legislation NSR requirements. Liaising with Publics Bodies on site safety matters generally. Liaising an co-ordinating in terms of safety matters, including safety meetings, inspections and other
relevant matters pertaining to safety where necessary. Establishing emergency preparedness procedures in collaboration with Police, Fire and Emergency Medical
Services. Ensuring that reviews, audits and safety training are ongoing. Supervising the hazard identification system. Act as Secretary to the Safety Committee and assist it.
5. Registered Safety Officer
Advice the occupier, Project Manager or any other person in-charge of the worksite on the measures to betaken in the interest of Safety and Health of the persons employed therein ; with the approval of such
i P j t M i l t h
-
8/3/2019 1 Safety Management System
10/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 10 / 46
SMS
n 0606
TSO REV. : 0
6. Registered Environmental Control Officer (RECO)
The Registered Environmental control officer is to ensure the construction site is free of environmental healthhazards. The RECO reports to the Safety Manager.
The RECO is responsible for :
Preparing & submitting a Site Environmental Control Programme in accordance to the prescribed format tothe occupier of the construction site at least three weeks before work commences on the worksite.
Advising the occupier, Project Management via the Safety Manager or any other person in charge of theworksite on what needs to be done for conditions/situations which cause environmental health problems orare likely to cause environmental health problems.
Implementing such measures, with approval of such occupier.
Inspecting the worksite to ensure all facilities and equipment relevant to the maintenance of environmental
health are in proper working condition and do not pose any environmental health hazard.
Pointing out and discussing environmental health irregularities such as mosquito and fly breeding, rodentinfestation, noise/dust/smoke/water pollution, poor housekeeping, earth littering, poor refuse management,poor maintenance of sanitary facilities, etc. with the occupier of the construction site and recommendmeasures to rectify such irregularities.
Attending to all feedback on such irregularities and inform the occupier of the construction site accordingly.
Reporting and submitting a site Environmental Control Report in accordance to the prescribed format to the
i f th t ti it f t i ht th 1st d 15th f th th
-
8/3/2019 1 Safety Management System
11/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 11 / 46
SMS
n 0606
TSO REV. : 0
Use an audible signal communication system if the above statement is not complied. (E.g. walky talkie,handphone).
Take measures to ensure safe lifting operation and rectify any unsatisfactory or unsafe condition reported.
Ensure that receptacle is used when lifting any loose load to prevent the load or part of it falling out duringthe lifting operation.
Check the lifting gears/tackles every 3 months to ensure their safe working condition and colour it accordingto the coloured code.
Monitor and ensure that the mechanics carries out the maintenance for the crane every 3 months.
Responsible for the safety of all lifting operation.
9. Rigger
Ensure that the load to be lifted is secure, stable and balanced.
Report any defect in the lifting gears/tackles to the Lifting Supervisor.
10. Signalman
Responsible for all signalling used in the lifting operation.
Give correct and clear signals to guide the crane operator in the manoeuvre of the load safely to itsdestination.
R t ti f t f diti t th Lifti S i
-
8/3/2019 1 Safety Management System
12/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 12 / 46
SMS
n 0606
TSO REV. : 0
V. SAFE WORK PRATCICES
STTSO will establish and maintain detailed procedures to ensure that safe work practices are followed. Theseprocedures shall incorporate instructions stated in the relevant standards, codes and statutory regulations. STTSOwill establish a list of all statutory requirements and establish a procedure to update this listing.
All safety critical activities are identified in the risk analysis report. Before commencement of work, STTSOprepare Permit-to-work for each routine high risk work activity. (Cf. Risk analysis report)
Objectives :
To eliminate unsafe acts
To prevent accidents by reducing excessive risk taking
To serve as training material and checklist for supervisors on specific operation
Coverage :
Electrical works
Housekeeping
Manual handling
Lifting operation by cranes
Fire prevention
Cables laying and trackside installation
Hot work
Working at height
W ldi d tti
-
8/3/2019 1 Safety Management System
13/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 13 / 46
SMS
n 0606
TSO REV. : 0
C. SAFETY ORIENTATION COURSE (SOC) :
All workers regardless of nationality at the work site must complete this course.
This course is conducted in English
Those employees without the certificate will not be allowed into the site.
A copy of the SOC certificate of every employee must be submitted to the safety section of CTW before start ofwork.
D. CWCS SAFETY ORIENTATION COURSE
This training is conducted for workers by CTWs before they start work.
The workers are brought around on a site tour and the classroom briefing The orientation may consist of :
General safety rules and regulations,
Personal protective equipment,
Housekeeping,
Accident reporting,
Emergency evacuation procedures,
Permit-to-work system,
C f t i
-
8/3/2019 1 Safety Management System
14/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 14 / 46
SMS
n 0606
TSO REV. : 0
VII.GROUP MEETINGS
STTSO will establish a communication system among managers, supervisory personnel, safety personnel,workers and sub-contractors. The communication system shall consist of the co-ordination meeting, safety
committee meeting, tool box meeting
A. PURPOSE :
To serve as an avenue for discussion on remedies for hazards.
To update on technological advance in terms of safety.
To ensure an effective site safety committee meeting.
To comply with factories (safety committee) regulation.
B. OBJECTIVE :
Group meetings are an important method of successful supervisor employee communications by makingeffective use of communication time by allowing employee participation and providing equal exposure to vitalinformation. These meetings can also help to create a co-operative communication climate, encourage team sprit,and enhance the supervisors leadership role.
VIII SAFETY COMMITTEE
-
8/3/2019 1 Safety Management System
15/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 15 / 46
SMS
n 0606
TSO REV. : 0
The Committee will discuss the cause of the accident, incident, dangerous occurrence ornear miss and recommend measures to be taken to prevent a recurrence of such accident or dangerousoccurrence.
C. ORGANISE PROMOTIONAL ACTIVITIES
STTSO, through the Site Safety Committee, will participate or organise its own contest,competition or other activity held to promote the safe conduct of work in the Site.
D. SAFETY RULES AND REGULATIONS
The Site Safety Committee will prepare a set of rules and regulations which will promote thesafety, health and welfare of the workmen.
STTSO display a copy of these rules and regulations on Site, translated into languages
which the workers can understand.
E. MONTHLY SAFETY TALK
At the monthly meeting, one of the members of the Site Safety Committee will give a talk onsafety and health at work on the Site, and the talk will be followed by a discussion by the Committee.
The Chairman, will appoint the Registered Safety Officer and the Site Safety Supervisors toconduct daily tool box meetings to the workforce so as to promote the safety and health of workers onthe Site and for the guidance of the persons employed therein.
-
8/3/2019 1 Safety Management System
16/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 16 / 46
SMS
n 0606
TSO REV. : 0
D. PROCEDURE
To arrange for the employees to gather at scheduled time
To inform the site safety officer or safety manager before commencement of the meeting.
Workers should be encourager to bring up hazard, and unsafe conditions present at the work area during themeeting.
To constantly train workers on safe work procedures
To educate the employees in order to prevent accidents
To inform employees about the proceedings of the site safety committee meeting
To keep a record of the date, time, attendance of the participants and the details of the meeting at least once ina week
The meeting shall be at least 10 minutes and not to exceed 20 minutes
One or some of the suggested topics may be propagated or discussed
E. TOPICS
Safety rules and regulations
Safety work practices
-
8/3/2019 1 Safety Management System
17/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 17 / 46
SMS
n 0606
TSO REV. : 0
C. REPORTING :
After receiving medical attention, the injured workman shall inform his/her immediate superior within 24 hoursfrom the accident happened either through writing or with the following data for investigation purposes :
Date and time of accident,
Place of accident took place,
Brief description of accident, Part of body injured,
Witness of the accident, if any,
Duration of medical leave, if any,
Contact telephone number if medical leave more than 3 days.
D. SAFETY COMMITTEE MANAGER
He shall comment on the accident case and if necessary he may call for a board of enquiry for further
investigation to the accident.
E. INCIDENT REPORT PROCEDURE
Refer toAppendix n 3
XII. IN-HOUSE SAFETY RULES AND REGULATIONS
-
8/3/2019 1 Safety Management System
18/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 18 / 46
SMS
n 0606
TSO REV. : 0
C. COLOUR OF SAFETY HELMET
Personnel Coulor of safety Helmet
Contractors site agents and foremen White red stripe
Sub-contractors and supervisory staff of sub-contractors
Yellow with red stripe
Registered safety officers, safety supervisors Blue
Lifting supervisors BrownRiggers * RedSignallers * YellowAll other workers Yellow
* In addition to the helmet colour codes, riggers and signalman will be provided with red reflective vest andidentification tags.
-
8/3/2019 1 Safety Management System
19/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 19 / 46
SMS
n 0606
TSO REV. : 0
XIII. SAFETY PROMOTION
STTSO will develop a safety promotional programme to demonstrate his commitment to advancing the safetyculture at the Site and reinforcing the concept that safety and construction are inseparable. The programme willenhance personal safety awareness and influence all attitudes and behaviour of all personnel on health, safety and
welfare.The programme will consist of general promotional activities which are carried out as part of a day-to-day
activity and high impact promotion activities which are carried out as a campaign to reinforce a particular safety pointat the Site. STTSO will organise a minimum of two safety campaigns for each calendar year.
Promotional materials and activities willinclude the following:
Display of safety policy on the site notice board,
Display of accident statistics,
Safety talks or screening of videos on safety in appropriate workers languages,
Display of signs, poster or other visual material, aimed at increasing safety awareness or to drawattention to particular safety issues,
The issue of safety handbooks or brochures aimed at increasing safety awareness.
STTSO will provide, erect, maintain and finally remove when ordered, an Accident Statistics Board 3m x 2min size written boldly in English, the content of which will include, at least, the following :
D
-
8/3/2019 1 Safety Management System
20/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 20 / 46
SMS
n 0606
TSO REV. : 0
-
8/3/2019 1 Safety Management System
21/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 21 / 46
SMS
n 0606
TSO REV. : 0
STTSO will be responsible for ensuring his sub-contractors good safety performance. STTSO will :
Establish an effective ongoing programme that uses specific safety performance criteria for evaluation ofsub-contractors,
Stipulate safety performance in the contractual agreements between STTSO and sub-contractors,
Conduct meetings before bid submission to address specific safety requirements,
Include site specific safety, health and welfare requirements in bid packages,
Request safety and health information from each prospective sub-contractor and evaluate it during theselection process,
Establish specific training requirements for sub-contractors,
Conduct pre-job meetings to address job safety expectation;
Require formal sub-contractor safety orientations for all new employees at the Site; Review the safety performance of sub-contractors (Accomplishment of last safety programme (if any),
awards received from authorities and other agencies (if any), to submit monthly safety report on or before5th day of each month to the safety department. Report format will be issued prior to the workcommencement),
Maintain records of all sub-contractors in particular items related to legislative requirements. These willinclude incident reports, inspection reports, minutes of Safety Committee Meetings and safety statistics.
-
8/3/2019 1 Safety Management System
22/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 22 / 46
SMS
n 0606
TSO REV. : 0
XVI. HAZARD IDENTIFICATION AND RISK ASSESSMENT
A. PROCESS
Work procedureidentification
Standard or specific
Analysis of work processlimitations
Start
Start
art
jkopjpojopjkopStart
art
arSSart
art
artIdentification of potantial
hazards
Risk estimate
Risk evaluation
Assessment ofInitial Risk
Assessment ofresidual risk
-
8/3/2019 1 Safety Management System
23/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 23 / 46
SMS
n 0606
TSO REV. : 0
XVII. IDENTIFICATION OF RISKS SPECIFIC TO MAIN WORK PROCESSES.
Work process
Data ExaminationActivity
Methods
Regulatoryrequirements
Human andPhysical
Resources
Identify inherentRisks
Human FactorOrganisational Factors
Technical Factors
Work process
safetysheet
-
8/3/2019 1 Safety Management System
24/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 24 / 46
SMS
n 0606
TSO REV. : 0
C. FIRE EQUIPMENTS :
The means of immediate fight against fire (extinguishers) have to be accessible without obstacle.
The information developed will be documented and communicated as appropriate within the Site to ensure thatthe Site organisation can respond to emergency situations.
STTSO will establish a programme of training, drills and exercises to test and evaluate the preparedness foremergency actions.
STTSO will, once every six months, organise role playing emergency exercises based on likely site scenarii inwhich the key site personnel work through their emergency response roles. The Authoritys Safety Department willbe invited to this exercise as an observer.
-
8/3/2019 1 Safety Management System
25/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 25 / 46
SMS
n 0606
TSO REV. : 0
XIX. OCCUPATIONAL HEALTH
STTSO will plan and implement occupational health programmes on hearing conservation and respiratoryprotection. In addition, programmes for the prevention of industrial dermatitis and work-related back injuries andstrains shall be documented and implemented.
STTSO will provide education and training to all workers on the relevant health hazards, safe work practices andproper use of PPE.
XX.LIST OF APPLICABLE PROCEDURES
Documents Status
GeneralAvailable and& applicable
Exists toadapt
To becreated
Reference Associated Process (cf. S.M.M)
S.M.S S.M.S rv.
AContractual follow-up of the businessand the realization of the works
Record Control PRO 4011 Piloting and planning
Non-conformity reporting PRO 4006 Survey and measuring
Preventive and correctiveaction
PRO 4007 Piloting and planning
-
8/3/2019 1 Safety Management System
26/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 26 / 46
SMS
n 0606
TSO REV. : 0
A. CONTROL PLAN
The control plan will verify the effective implementation and it confers unity to the requirement of:
S.M.S.
Relevant procedures.
B. CONTROLS ORGANIZATION
Safety controls
Controls by ST-TSOand its partners
Controls by theCustomer
-
8/3/2019 1 Safety Management System
27/46
International Project Division
DIVISION MANAGER
PROJECT DIRECTOR
Quality, Environment and
Safety Divisions
DIVISION MANAGER
QUALITY MANAGER E.H.S.E. MANAGER TECHNICALMANAGERCONSTRUCTIONMANAGER COMMERCIALMANAGER
TRACKSUPERVISOR
THIRD RAILSUPERVISOR
BALLASTSUPERVISOR
MACHINEOFFICEREQUIPMENT
SUPERVISOR
DESIGNENGINEER
SURVEYOR
PLANNING
ENGINEER
PROCUREMENTOFFICER
ACCOUNTING
QUALITYSUPERVISORIN
SPECTOR
Engineering Office
ENGINEERING OFFICEMANAGER
Contracting Authorities
Local Authorities
P.E.
L.E.W.
Licensed
Surveyor
Others
Contractors
AC AC
AC
AC
AC
AC
AC
External LinksHierarchicalLinks
FunctionalLinks
Auto-ControlAC
QUALITYE.H.S.
SUPERVISORINSPECTORS
Define improvementsrequired
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 27 / 46
SMS
n 0606
TSO REV. : 0
TSO 13/02/2012
Appendix 1
-
8/3/2019 1 Safety Management System
28/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 28 / 46
SMS
n 0606
TSO REV. : 0
APPENDIX N 2 SAMPLE WORK PROCESS SAFETY SHEET
D. MAJOR WORK PROCESS FORM
Project : CTW 100
(a) FICHE N 1
Work to be executedWorks in Staging Area :
- Receiving materials- Unloading- Storage, re-loading
- Various materials and equipments
Equipment used- Delivery Vehicles- Forklift- Lifting Implements- Containers- Tip / Bin
-
8/3/2019 1 Safety Management System
29/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 29 / 46
SMS
n 0606
TSO REV. : 0
APPENDIX N 3 ACCIDENT / INCIDENT / DANGEROUS REPORT
ACCIDENT OCCURRENCE REPORT FORM Page 1 of 6
Name of Main Contractor : Report Ref. No :
PART A (Type of Accident)
Major Accident (MOM reportable) Minor Accident (Non MOM Reportable)
LTA Staff Injury Public Member Injury
PART B (Details of Accident)
PROJECT : CONTRACT :
EXACT LOCATION :
OCCURRENCE DATE : OCCURRENCE TIME :
REPORTED DATE : REPORTED TIME :
PART C (Details of Injured Person)
-
8/3/2019 1 Safety Management System
30/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 30 / 46
SMS
n 0606
TSO REV. : 0
ACCIDENT OCCURRENCE REPORT FORM Page 2 of 6PART E (Details of Injury)
Use the following codes :
Nature of Injury Injured Bodypart
ABR : Abrasions/scratches BODY : Injury linked to entire bodyAMP : Amputation FEET : Feet/ToesASP : Asphyxia/Drowning HAND : Hand/FingersBCC : Bruises/Crushing/Contusions HEAD : Head/Face/NeckBN(C) : Chemical Burns LOWER : Lower Limbs (Legs)
BN(H) : Heat Burns TORSO : Shoulder to Groin/HipCCS : Concussion/Internal Injury UPPER : Upper Limbs (Arms)DEATH : Fatality NA : Not ApplicableDIS : DislocationELECT : Effects of ElectricityEYE : Eye InjuryFG : Faint/GiddyFT : FractureFZ : Freezing/Frostbite/HypothermiaHEAT : Heat stress and strain
-
8/3/2019 1 Safety Management System
31/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 31 / 46
SMS
n 0606
TSO REV. : 0
ACCIDENT OCCURRENCE REPORT FORM Page 3 of 6PART F (Description of Accident)
-
8/3/2019 1 Safety Management System
32/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 32 / 46
SMS
n 0606
TSO REV. : 0
ACCIDENT OCCURRENCE REPORT FORM Page 4 of 6PART G (Causes of Accident)
(1) Direct Causes
(i) Unsafe Conditions
Absence of safety means Congestion/restricted actionDressing/apparel hazard Environmental hazard (gas/dust/smoke)High temperature hazard Hazardous arrangementInadequate guarding Inadequate illuminationInadequate/improper PPE Inadequate ventilationInadequate warning system Improper/faulty equipmentNoise hazard Presence of fire/explosion hazard
Poor housekeeping Radiation hazardUnsound structure Others (key details into Remarks)No unsafe condition
Remarks :
(ii) Unsafe Practice
Careless/reckless Disregard instructions
-
8/3/2019 1 Safety Management System
33/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 33 / 46
SMS
n 0606
TSO REV. : 0
ACCIDENT OCCURRENCE REPORT FORM Page 5 of 6
(ii) Human Factors
Foul play Fatigue/stressInadequate capability IllnessImproper or lack of motivation/interest Improper assignment of personnel
Lack of knowledge Lack of skillLack of training Needs conflicting with safetyNot qualified Unsafe attitudeNon human factors Others (key details into Remarks)
Remarks :
(3) Weakness of Safety Management System
Safety policy Safe work practicesSafety training Group meetingsIncident investigation and analysis In-house safety rules and regulationsSafety promotion Evaluation, selection and control of SCSafety inspections Maintenance regime for all machineryHazard analysis Control of movement and use of Emergency preparedness hazardous substances and materials
-
8/3/2019 1 Safety Management System
34/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 34 / 46
SMS
n 0606
TSO REV. : 0
ACCIDENT OCCURRENCE REPORT FORM Page 6 of 6PART I (Details of Investigating Person)
NAME :
DESIGNATION :
COMPANY :
TEL : DATE : SIGN :
PART J (Reviewed By)
NAME :
DESIGNATION :
COMPANY :
TEL : DATE : SIGN :
PART K (Form Completed By)
-
8/3/2019 1 Safety Management System
35/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 35 / 46
SMS
n 0606
TSO REV. : 0
APPENDIX 4 SAFE WORK PERMIT
Serial No.................................Expires at 23.59 Hours
Date Time On Day of IssueThis permit is valid only for the day, time and period stated above. The conditions of issue must becomplied with throughout the duration of the work. This permit may be withdrawn at any time. You areresponsible for the copy of this permit and must produce it on request.
LOCATION
Specific Work To Be Performed
Does other work in the area present a hazard to this job?...........................................................................................................................................
SAFETY APPROVAL Conditions of Issue which must be observed.
-
8/3/2019 1 Safety Management System
36/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 36 / 46
SMS
n 0606
TSO REV. : 0
APPENDIX 5-1
NON-CONFORMITY SHEET No. :
Department: Valid from:
By the person in charge of operations concerned by NC (name): Signature:
Name of entity concerned by the NC:
Service: Workshop: Work site:
ilsofthenonconformity
Date the NC was reported: Audit
Location of the NC:
Followinginspection Minutes of Management review
Customer complaint
Description of the reported situation: Inspection of the workplace
Other (specify)
NC Labour
-
8/3/2019 1 Safety Management System
37/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 37 / 46
SMS
n 0606
TSO REV. : 0
Nonconformitylifted Date: Date:
Signature: Signature:
APPENDIX 5-2
ACTION SHEET CORRECTIVEPREVENTIVE
No......................
ORIGIN
Non-conformity sheet No..
CAUSE OF THE NONCONFORMITY: NATURE OF THE NC:
Labour
Measurement
Equipment
-
8/3/2019 1 Safety Management System
38/46
SAFETY MANAGEMENT SYSTEM
CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR
SEGMENT 7 - DIRECT LINK
Page 38 / 46
SMS
n 0606
TSO REV. : 0
Project Manager, Safety Manager, RECO
Name: Date: Signature:
VALIDATION AND VERIFICATION OF THE EFFICIENCY OF THE ACTION:
Project Director, Name: Date: Signature:
-
8/3/2019 1 Safety Management System
39/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 39 sur 46
Inputd
ata
Control points CriteriaAssessment
Observations AssessmentS A M I
Check that the input data:
1. Is defined C1
2. Is sufficient C3
3. Is required for the process's activities C2
4. Has clearly identified and known sources C1
Check that the input data required for each part of theprocess is:
1. Available E1
2. Formalized C4
3. Comprehensible E3
E. TRANSMITTED
1. To the right person E1
2. At the right time E1
3. Can be transmitted in case of malfunction E4
TSO 13/02/2012
-
8/3/2019 1 Safety Management System
40/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 40 sur 46
Processa
ctiv
ities
Control points CriteriaAssessment
Observations AssessmentS A M I
Check that the processes' activitiesare:
1. Defined C1
2. Sufficient to achieve the expectedresult for the process
C3
3. Required to achieve the expectedresult for the process
C2
1. Available E1
2. Applicable E3
3. Under control E1
Check that the process-relatedinstruction sheets are:
1. Available E1
2. Formalized C4
3. Comprehensible E3
Transmitted
1. To the right person E1
2. At the right time E1
3. Can be transmitted in case ofmalfunction
E4
TSO 13/02/2012
-
8/3/2019 1 Safety Management System
41/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 41 sur 46
Ou
tpu
tda
tafor
theprocess
Control points CriteriaAssessment
Observations AssessmentS A M I
Check that the output data/results for
each activity are:
1. Defined(in the process manualor the quality plan)
C1
2. Sufficient to perform the nextprocess activities
C3
3. Required to achieve the expectedresult for the process
C2
Check that the output data/results foreach activity are:
1. Recorded E1
2. In conformity C2
Transmitted
1. To the right person E1
2. At the right time E1
3. Can be transmitted in case ofmalfunction
E4
TSO 13/02/2012
-
8/3/2019 1 Safety Management System
42/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 42 sur 46
Con
tro
lsan
dd
ev
iations
Control points CriteriaAssessment
Observations AssessmentS A M I
Check that the control plan is:
1. Defined C1
2. Applied E1
3. Effective E2
Check that nonconformities are:
1. DetectedE1
2. Recorded C4
Dealt with(or exempted from
control)E1
1. Checked and approved afteraction
E2
2. Followed up E4
Check that measuring instrumentsare:
1. Adequate C2
2. Serviced E1
3. Calibrated C2
4. Inspected and recorded on aregular basis C2
Check that customer complaints are:
1. Duly acknowledged and recorded E1
2. Dealt with as expected E2
TSO 13/02/2012
-
8/3/2019 1 Safety Management System
43/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 43 sur 46
Reso
urces
/Work
ingenv
ironme
nt
1.
Human
Resources
Control points CriteriaAssessment
Observations AssessmentS A M I
Check that the staff concerned knows:
1. The process's input data E1
2. The process's activities E1
3. The process-related proceduresand instruction sheets
E1
4. The process's output data E1
Check that the human resources:
1. Meet requirements to executethe process. E2
2. Are used advisedly C2
1. Check that responsibilities aredefined. C1
2. Check that there are means tocompensate for faults.
E1
TSO 13/02/2012
-
8/3/2019 1 Safety Management System
44/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 44 sur 46
Res
ources
/Work
ingenv
ironm
en
t
1.
Ma
teria
lResources
Control points CriteriaAssessment
Observations AssessmentS A M I
Check that the machinery andequipment used:
1. Meets requirements E2
2. Is in conformity C2
3. Is monitored and checked E4
4. Is used advisedly C2
Check that there are means to
compensate for faults. E1
Working environment
1. Is it adequate for the process? E1
2. Is it suitable for storing (products,materials, equipment etc.) and/orbacking up data?
E3
3. Does it meet HSE standards? C2
4. Is it inspected on a regular basis(workplace inspections)?
E4
Overall assessment
TSO 13/02/2012
-
8/3/2019 1 Safety Management System
45/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 45 sur 46
Scoring and rating criteria proposed for the 4 levels S/A/M/I
Conformity
ConformityS
SatisfactoryA
AcceptableM
MediocreI
InadequateCriteria
CompletePartial,
being extendedPartial,
need perceivedPartial,
need not perceived
Fully structured, fullyborne out by evidence
Fully structured, partialevidence available
Partially structuredVery partially or not atall structured
Existence of aStructure
Meets therequirements
Mainly meets therequirements
Partially meets therequirements
Not compliant withmost of therequirements
Conformity
concernsthe entire site, or thefield of application
Concerns manydepartments, beingextended on site
Only concerns a fewdepartments, on-sitedeployment notlaunched, needperceived
Only concerns a fewdepartments
Field of application
Fully formalizedPartially formalized,being developed
Partially formalized, noimprovements underway,but need perceived
Very partiallyformalized or not at all,need for improvementnot perceived
Formalization
OVERALLASSESSMENT%
S A M I
80-100 60-79 40-59 0-39
Notes: a/ Critical questions are in bold italics
b/ For the scores, refer to the "Criteria" box in the questionnaire,letter "C" or "E" indicates the type of question: Conformity or Efficiency,and number "1, 2, 3 or 4" indicates the corresponding criterion.
c/ Non-audited or irrelevant questions are not counted, and identified under "observations" by:
- NA: Not audited- N/A: Not applicable
TSO 13/02/2012
-
8/3/2019 1 Safety Management System
46/46
APPENDIX 6 : PROCESS CONTROL SHEET Page 46 sur 46
TSO 13/02/2012
Scoring and rating criteria proposed for the 4 levels S/A/M/I
Efficiency
ConformityS
SatisfactoryA
AcceptableM
MediocreI
InadequateCriteria
CompletePartial,
being extended -some evidence
Partial,need perceived
Partial,need not perceived-hardly any evidence
Fully and rigorouslyunder control
Partially undercontrol(improvements inprogress)
Partially under control Not well under controlUnder control,
mastered
Giving the expectedresults
More or less givingthe expected results
Only partially achieving theexpected results
Hardly achieving any ofthe expected results
Expected resultsachieved
optimized Being optimized Optimization planned optimization not planned Optimization
Extension over time orcapitalizationguaranteed
Extension over timeor capitalization inprogress
Perceived need to extendover time or capitalize
Need not guaranteed andnot perceived
Extended over timeCapitalization
OVERALLASSESSMENT%
S A M I
80-100 60-79 40-59 0-39
Notes: a/ Critical questions are in bold italics
b/ For the scores, refer to the "Criteria" box in the questionnaire,
letter "C" or "E" indicates the type of question: Conformity or Efficiency,and number "1, 2, 3 or 4" indicates the corresponding criterion.
c/ Non-audited or irrelevant questions are not counted, and identified under "observations" by:
- NA: Not audited- N/A: Not applicable