1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH...

29
1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center, CMA March 16, 2005, Jakarta

Transcript of 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH...

Page 1: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

1

Role of RTH Beijing in exchanging tsunami-related information

and Status of the GTS system at RTH Beijing

National Meteorological Information Center, CMA

March 16, 2005, Jakarta

Page 2: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

2

Outline

• Requirements analysis

• Role of RTH Beijing in exchanging tsunami-related

information

• Status of the GTS system at RTH Beijing

Page 3: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

3

Requirements analysis

Page 4: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

4

• Functions of the TEWS

• Monitoring seismic and tidal stations throughout the India Ocean

• Evaluating potentially tsunamigenic earthquakes

• Disseminating tsunami warning information

• Key components of the TEWS

• Observation network

• Monitoring and evaluating centers for potentially tsunamigenic

earthquakes

• Communication network for collecting, exchanging and dissemina

ting tsunami-related information in the India Ocean

Page 5: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

5

Information types, formats and transmission systems

• Meteorological observ

ations, products

• Oceanic observations,

products

• Seismic observations,

products

• Both real-time data a

nd non real-time data

• ASCII

• observations

• warnings

• Binary data formats

• products

• Graphical formats

• products

• warnings

• GTS links

• Internet

• Local leased lines

• Satellite System

• HF Radio

• Commercial radio and

TV channels

• …

Page 6: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

6

Data flow in the TEWS-IO

Concerned Services

- Oceanic service- Seismic service- …

- Governments- Public

Tsunami Warning System

GTS Centers(NMHSs in WMO Member Countries )

Warnings

Ob

servation

sP

rod

uctio

nsW

arnin

gs

Warn

ing

s

GTS/Leased line/Internet/Satellite based broadcast

IntranetLeased line

InternetDisseminators

InternetDisseminators

Meteorological Observation

Network

Oceanic Observation

Network

Seismic Observation

Network

Ob

servation

s Ob

servation

s Ob

servation

s

Ob

servation

sP

rod

uctio

nsW

arnin

gs

GTS GTS/DCP/Internet GTS/DCP/Internet

Page 7: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

7

Operational rules needed for the tsunami-related information exchange

• Data codes

– Format of observations (?)

– Format of warnings (T1T2=WE)

– Format of products (?)

• Communication means and protocols

• Other rules

– Time delays

– Request/reply for Tsunami data

Page 8: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

8

• Potential problem on sharing data among different services and

organizations

• Suggested solution

• Using GTS codes to exchange tsunami information among the

different countries

• Developing the abilities of translating tsunami information between

the GTS codes and the special formats which are used by the other

services or organizations at the concerned GTS centers

Data codes

Page 9: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

9

Communication means and protocols

• Communication means• Data collection/Data exchange

– GTS/Leased lines/Internet

• Data distribution

– GTS/Satellite based broadcasting/Internet

• Protocols• TCP/IP

• File based transmission

• Transmission procedures• GTS based transmission

– Requirements: upgrading the current asynchronous circuits and X.25 circuits in

concerned GTS centers to IP links

– WMO FTP

• Internet based transmission

– FTP

– E-mail

– Web data Ingest

Page 10: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

10

Role of RTH Beijing in exchanging tsunami-related information

Page 11: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

11

• Collecting tsunami-related information from other GTS centers

via GTS and Internet

• Collecting tsunami-related information from other concerned

services (e.g. State Oceanic Service, China Earthquake Admini

stration) in China via local leased lines

• Translating tsunami information between GTS codes and the s

pecial formats which are used by the other services in China

• Disseminating tsunami-related information to other GTS

centers via GTS, CMA’s PCVSAT broadcasting system, and

Internet

• Disseminating tsunami-related information to other concerned

services (e.g. State Oceanic Service, State Seismic Service) in

China via local leased lines

Page 12: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

12

Status of the GTS system at RTH Beijing

Page 13: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

13

The GTS links at RTH Beijing

GTS link SPEED

(Kbps)

CIRCUIT TYPE PROTOCOL REMARKS

Beijing-Offenbach 48/48 FR (RMDCN) FTP

Beijing-Tokyo 48/48 FR (RMDCN) TCP sockets

Beijing-Moscow 8/8 FR (RMDCN) FTP

Beijing-Seoul 32/32 FR TCP sockets

Beijing-Bangkok 9.6 Leased Line X.25 PVC

Beijing-New Delhi 9.6 Leased Line X.25 PVC Planned move to FTP over FR

Beijing-Ulan Bator 14.4 Leased Line FTP

Beijing-Pyongyang 75Baud Leased Line ASYNC

Beijing-Hanoi 75Baud Leased Line ASYNC

Page 14: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

14

Offenbach

Tokyo

Moscow

Seoul

HanoiPyongyangUlan Bator

Bangkok

New Delhi

Asynchronous circuits

X.25 circuits

IP over FR

Cisco PIX Firewall

RMDCN RoutersCisco 2620

(HSRP)

GTS RouterCisco 3640

IP over FR

Front End

• AlphaServer ES40

• Duplicated system

• UNIX

Back End

• IBM P650

• Duplicated system

• UNIX based

MSS

Router

Cisco PIX Firewall

Web Server

InternetDMZ

Supporting FTP, TCP sockets, X.25, Asynchronous

FTPE-mail

The GTS System at RTH Beijing

Page 15: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

15

Daily traffic on GTS links

GTS link Inbound (Bytes) Outbound (Bytes)

Beijing-Offenbach 198M 1.2M

Beijing-Tokyo 35.6M 2.5M

Beijing-Moscow 11.3M 1M

Beijing-Seoul 7.9M 2.8M

Beijing-Bangkok 712K 890K

Beijing-New Delhi 896K 1.2M

Beijing-Ulan Bator 13.6K 586K

Beijing-Pyongyang 20K 685K

Beijing-Hanoi 25K 589K

Page 16: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

16

Page 17: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

17

Page 18: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

18

Page 19: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

19

Page 20: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

20

Page 21: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

21

Page 22: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

22

Page 23: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

23

Page 24: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

24

Page 25: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

25

• The data exchange between Beijing and Kazakhstan has been

started from 2004.

• Internet

• E-mail based data exchange

• Data exchanged: observations

In addition to the GTS links

Page 26: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

26

• Beijing-New Delhi GTS link

– Being upgraded in March

– The new link: 8/8kbps FR link (RMDCN)

– Data exchange: FTP

• Suggestions on Beijing-Bangkok GTS link

– To better support the exchange of tsunami warnings

and information, the Beijing-Bangkok circuit should be

upgraded from X.25 to TCP/IP.

Future Plans

Page 27: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

27

Conclusions

Page 28: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

28

• The current GTS, with improvement in circuit capacity and communicati

on protocols, can serve as a backbone for cross boundary tsunami data

exchange..

• The Internet can be used for exchanging data and products.

– Cost effective

– Supplement to GTS

• The satellite-based broadcasting systems can be used for data dissemi

nation

– Supplement to the low speed GTS links

– Improving the data collection in small NHMSs

• RTH Beijing can support tsunami data exchange both via GTS and over

Internet

Page 29: 1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,

29

Thank you!