Joondalup Staff
Lounge Presentation
1
Proposal
• Convert 8.201 (Existing Staff Room) to a dedicated Staff Development Facility.
• Develop 9.207 (Vacant Cafeteria) into a Staff Lounge.
2
PROJECT DRIVERS
• Staff Development is a key priority for the University and currently there is no dedicated/specialized space to serve this need.
• An opportunity exists to create an integrated staff lounge within a food & beverage precinct in Building 9.
3
Rationale for locating Staff Development in B 8
4
• The size of this space meets the requirements of a specialized staff development facility
• Open plan layout makes conversion cost effective
• The size of the existing staff lounge exceeds demand requirements (284m2 with seating for 100) – Inefficient use of space
Rationale for locating Staff Lounge in B 9
• Building 9 is a prime location for the staff lounge
• The size of the proposed space is fit for purpose
• Capitalizes on existing food & beverage infrastructure
• Opportunity to develop an integrated retreat / congregation space for ECU staff
5
Utilization Data – 2011 Survey Staff Room
6
7
Utilization Data – 2011 Survey Staff Room
Design Brief – New Staff Lounge
8
• Contemporary design & fit out
• Access controlled entry doors for enhanced
security/privacy
• A range of different seating and gathering
configurations
• Defined seating space on the veranda
• Audio Visual
• Potential for retail point at a later stage
Design Brief – New Staff Lounge
9
• Disabled access including appliances• Capitalize on outlook to lake & pines• Layout to provide for private spaces• Seating capacity to meet demand• Staff only access to surrounding facilities• Self catering facilities (Fridges, Microwaves
etc)• Security • Fit out specification to be of a high level• Flexibility of configuration
Concept Sketches
10
144m2 with internal seating for approximately 70 & external seating for 16
Staff Lounge Layout
11
Lowered Ceilings
Servery
Lounge Configuration Tables & Chairs
Access Control to Tavern
Fit Out
12
Fit Out
13
Next Steps
• Consultation• Proposed Time Frames
14