1
PROJECT PLANNING AND PROJECT PLANNING AND FINANCINGAND ICT EQUIPMENT FINANCINGAND ICT EQUIPMENT AND INFRASTRUCTURE AND INFRASTRUCTURE UPGRADEUPGRADE
ZAMBIA REVENUE AUTHORITY
Content
1.1. BACKGROUND & The Modernization AgendaBACKGROUND & The Modernization Agenda
2.2. Why ASYCUDAWORLD?Why ASYCUDAWORLD?
3.3. PlanningPlanning
4.4. FinancingFinancing
5.5. ICT Equipment and Infrastructure UpgradeICT Equipment and Infrastructure Upgrade
6.6. OpportunitiesOpportunities
7.7. ChallengesChallenges
2
REVENUE ADMINISTRATION MODERNISATION STRUCTURE
PROJECT MANAGER
PROJECT MANAGER
PROJECT MANAGER
DIRECTOR RESEARCH & PLANNING
PROJECT MANAGER
STEERING COMMITTEEPROJECT
MANAGEMENT OFFICE
COMMISSIONER CUSTOMS SERVICES
COMMISSIONER DOMESTIC TAXES
BOARD SECRETARY/
COMMISSIONER CORPORATE
AFFAIIRS
Asycuda World Project
Modernisation of Trade Logistics
Port Automation
Scanner Installation
Centralised Processing
Centre
Real Time Acquittal System
GIZ SME Taxation Enhancement
TaxOline Project
Mining NTA
Infrastructure Development
Electronic Records Mngt
System
Title Deeds
Business Continuity
Plan
•Chairperson - Commissioner General•Commissioner Customs•Commissioner DOMT•Commissioner Finance & IT•Commissioner Corporate & BS•Director RPD•Director IA•Secretariat - Director Projects •Ex officio Member (Donor Representative˟˟
Commissioner GeneralPROGRAMME SPONSOR
PROJECT OWNERS
Support Corporate Vision and Corporate Strategy
PROJECT AND CHANGE MANAGEMENT SUPPORT
MEMBERSHIP
PROJECT MANAGERVACANT
DIRECTOR IT
SharePoint Project
VSAT Project
PROJECT MANAGER
Mineral Export Monitoring
Project
MODERNIZATION AGENDA
• DEPARTMENT OF CUSTOMS MERGES WITH DEPARTMENT OF CUSTOMS MERGES WITH DEPARTMENT OF DIRECT TAXES TOBECOME THE DEPARTMENT OF DIRECT TAXES TOBECOME THE ZAMBIA REVENUE AUTHORITY IN 1994ZAMBIA REVENUE AUTHORITY IN 1994
• GREAT POLITICAL WILL TO REFORM CONTINUED ALL GREAT POLITICAL WILL TO REFORM CONTINUED ALL THE WAY TO THE MID 2000sTHE WAY TO THE MID 2000s
• IN 1998 CUSTOMS (ZAMBIA) AUTOMATES AND ADOPTS IN 1998 CUSTOMS (ZAMBIA) AUTOMATES AND ADOPTS ASYCUDA 2.7ASYCUDA 2.7
• IN 2002 UPGRADED FROM 2..7 TO ASYCUDA++ VERSION IN 2002 UPGRADED FROM 2..7 TO ASYCUDA++ VERSION B = 17 SITESB = 17 SITES
• IN 2007 UPGRADED FURTHER TO VERSION E (++) – 21 IN 2007 UPGRADED FURTHER TO VERSION E (++) – 21 SITESSITES
4
MODERNIZATION AGENDA CONT…D
• TRADE LOGISTICS – COST OF DOING TRADE LOGISTICS – COST OF DOING BIZ. COLLABORATION WITH PSDRP & BIZ. COLLABORATION WITH PSDRP & TABCTABC
• CUSTOMS AS A BARRIER TO TF DUE TO CUSTOMS AS A BARRIER TO TF DUE TO INEFFICIENT PROCESSES AND INEFFICIENT PROCESSES AND INEFFECTIVE PROCEDURESINEFFECTIVE PROCEDURES
• GLOBALIZATION EFFECTS – DEMAND GLOBALIZATION EFFECTS – DEMAND FOR FASTER SERVICEFOR FASTER SERVICE
• BPR FOR OGAs DONE BY PSDRP/IFC FOR BPR FOR OGAs DONE BY PSDRP/IFC FOR ZRA BY UNCTAD CONSULTANTZRA BY UNCTAD CONSULTANT
Tax SymposiumTax Symposium 5
WHY ASYCUDAWORLD
ROBUSTNESS WEB ENABLED TECHNOLOGICALLY ADVANCED CUSTOMS SYSTEM STABILITY AND FLEXIBILITY AND COST
EFFECTIVENESS SOURCE CODE AVAILABILITY FOR CONTINUED
DEVELOPMENT TO MEET LOCAL REQUIREMENTS• INTEROPERABILITY WITH OTHER SYSTEMSINTEROPERABILITY WITH OTHER SYSTEMS• OPPORTUNITIES FOR SW AND GLOBALLY OPPORTUNITIES FOR SW AND GLOBALLY
NETWORKED CUSTOMSNETWORKED CUSTOMS
6
PLANNING
• FIRST DRAFT OF USER REQUIREMENTS FIRST DRAFT OF USER REQUIREMENTS DONE IN 2010DONE IN 2010
• 2011 SEARCH FOR A WEB BASED SYSTEM 2011 SEARCH FOR A WEB BASED SYSTEM COMMENCEDCOMMENCED
• AW PROJECT STEERING COMMITTEE AW PROJECT STEERING COMMITTEE INAUGURATEDINAUGURATED
7
PLANNING CONT…D• PRINCE II PROJECT METHODOLOGY PRINCE II PROJECT METHODOLOGY
ADOPTEDADOPTED• PROJECT DOCUMENTATION PREPARED PROJECT DOCUMENTATION PREPARED
AS PER METHODOLOGY AS PER METHODOLOGY • AFTER PROTRACTED ANALYSIS OF AFTER PROTRACTED ANALYSIS OF
CUSTOMS SYSTEMS, ASYCUDAWORLD IS CUSTOMS SYSTEMS, ASYCUDAWORLD IS SELECTED IN MID 2012SELECTED IN MID 2012
• MEMORANDUM/CONTRACT SIGNED MEMORANDUM/CONTRACT SIGNED WITH UNCTAD IN DECEMBER 2012WITH UNCTAD IN DECEMBER 2012
Tax SymposiumTax Symposium 8
PLANNING CONT…D
• STAKEHOLDER IDENTIFICATION AND STAKEHOLDER IDENTIFICATION AND ENGAGEMENTENGAGEMENT
• STAKEHOLDER User Requirements STAKEHOLDER User Requirements Enquiry/ValidationsEnquiry/Validations
• AW PROJECT IMPLEMENTATION TO BE AW PROJECT IMPLEMENTATION TO BE DONE IN FIVE PHASES i.e. DONE IN FIVE PHASES i.e. Pilot + CPC Pilot + CPC pilotpilot, National Roll-out, Integration with , National Roll-out, Integration with other ZRA systems, OGAs interface and other ZRA systems, OGAs interface and connection + SW and Global Network connection + SW and Global Network (Customs2Customs)(Customs2Customs)
Tax SymposiumTax Symposium 9
FINANCING
• MODERNIZATION FUNDS FROM GRZMODERNIZATION FUNDS FROM GRZ• DONOR SUPPORT THROUGH Public DONOR SUPPORT THROUGH Public
Expenditure Management Financial Expenditure Management Financial Administration (PEMFA)Administration (PEMFA)
• TECHNICAL SUPPORT FROM IFC TLMTECHNICAL SUPPORT FROM IFC TLM• TECHNICAL SUPPORT FROM UNCTADTECHNICAL SUPPORT FROM UNCTAD• TECHNICAL SUPPORT FROM US TECHNICAL SUPPORT FROM US
TREASURY AND GIZTREASURY AND GIZ• ASYCUDA Processing feesASYCUDA Processing fees
Tax SymposiumTax Symposium 10
ICT Equipment & Infrastructure Upgrade
• VSAT upgradeVSAT upgrade• Fiber Optic connection Fiber Optic connection
(ZAMTEL&ZESCO)(ZAMTEL&ZESCO)• ServersServers• ComputersComputers• Licences (application,security Licences (application,security
network and middleware)network and middleware)
Tax SymposiumTax Symposium 11
Opportunities
Political Will to Modernize More collaborative opportunities available Goodwill will from Cooperating Partners Upgraded ICT network infrastructure through VSAT & Optic
Fiber. Willingness by most stakeholders to modernize
12
Challenges
Competing needs for the Resources; Too many changes taking place due to many projects going
on, sometimes cancelling some benefits of other modernization activities (in terms of resources, procedure & process complicity)
Resistance to Change and too many risks, Ineffective Change Management strategy ICT infrastructure country-wide still inadequate Inadequate capacity to implement certain project activities
13