© Copyright 2005 POSC POSC WITSML™ SIG Overview John Turvill, Paradigm November 2005 POSC AGM.
1 Production SIG and PRODML™ Work Group Meetings Alan Doniger Chief Technology Officer POSC...
Transcript of 1 Production SIG and PRODML™ Work Group Meetings Alan Doniger Chief Technology Officer POSC...
11
Production SIG and Production SIG and PRODML™ Work Group PRODML™ Work Group
MeetingsMeetings
Alan DonigerAlan Doniger
Chief Technology OfficerChief Technology Officer
POSCPOSC
Aberdeen, Scotland20 September 2006
22
Today’s Meeting HostToday’s Meeting Host
BP: Rusty Foreman, BP: Rusty Foreman, Julian Pickering, Julian Pickering, Sophie RickmanSophie Rickman
33
44
Board
Economics
ReservoirEngineering
ExplGeology
Petrophysics PetroleumEngineering
Drilling
Engineering
ProductionGeology
Production
Engineering
Facilities
Engineering
ProductionOperationsGeophysics
DrillingOperations
Completion &Workover
In an overall E&P context …In an overall E&P context …
55
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda
08:00 Registration and Breakfast08:00 Registration and Breakfast08:30 Meeting Begins08:30 Meeting Begins
Welcome and IntroductionsWelcome and IntroductionsProduction SIG OverviewProduction SIG OverviewNorway’s Integrated Information Platform Project (IIP)Norway’s Integrated Information Platform Project (IIP)WITSML Production Reporting Standards and the Norway WITSML Production Reporting Standards and the Norway
OLF Daily Partner Production Reporting DeploymentOLF Daily Partner Production Reporting DeploymentQuestions & AnswersQuestions & Answers
10:00 Morning Break10:00 Morning Break
66
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda
10:30 Meeting Continues10:30 Meeting ContinuesUpdate on PRODML Work Group (Optimization Update on PRODML Work Group (Optimization
Standards)Standards) History and StatusHistory and Status Business CaseBusiness Case Pilot Activities and DemosPilot Activities and Demos
Questions & AnswersQuestions & Answers
12:00 Lunch12:00 Lunch
77
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda 13:00 Meeting Continues13:00 Meeting Continues
Update on PRODML Work Group (continues)Update on PRODML Work Group (continues) Public Review ResultsPublic Review Results Plan to Publish Version 1.0Plan to Publish Version 1.0 Transition to POSC and the Production SIGTransition to POSC and the Production SIG
Production SIG ActivitiesProduction SIG Activities 14:30 Adjourn SIG Meeting14:30 Adjourn SIG Meeting
14:30 – 15:00 14:30 – 15:00 PRODML Work Group Steering Committee Meeting (for PRODML Work PRODML Work Group Steering Committee Meeting (for PRODML Work Group members only)Group members only)
15:00 – 15:30 15:00 – 15:30 Production SIG Steering Committee MeetingProduction SIG Steering Committee Meeting(for current and prospective SIG members)(for current and prospective SIG members)
88
Coming Attractions…Coming Attractions…
99
Houston SIG Meeting Houston SIG Meeting November 7, MorningNovember 7, Morning
This meeting will address these subjects: This meeting will address these subjects: Orientation - Organizing a North America Region:Orientation - Organizing a North America Region:
Purpose, Administration, and Plans Purpose, Administration, and Plans Data Management SIG: Data Management SIG:
Update on Global Unique Well Identifier Initiative Update on Global Unique Well Identifier Initiative A New SIG Being Formed:A New SIG Being Formed:
Products, Services and Equipment Classification Products, Services and Equipment Classification
1010
Join your E&P colleagues to hear the latest in thought leadership for upstream oil and gas standards. Catch up with exciting changes taking place at POSC: new leadership, new mission and enhanced membership value.
This exciting event will introduce our Energy Standards Resource Centre, new collaborative services on offer and the development of a global open standards user community.
A special hosted reception will follow immediately after the Standards Summit from 5:00 – 8:00 PM, so Register Now!
•Meet the new leadership •Connect with E&P colleagues •Catch up on new offerings
DATE/TIME:November 8, 20063:00-5:00PM Summit5:00-8:00PM Reception
PLACE:Marriott West Loop1750 West Loop SouthHouston, Texas 77027
Hotel Information:marriottwestloop.com
1111
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda
08:00 Registration and Breakfast08:00 Registration and Breakfast08:30 Meeting Begins08:30 Meeting Begins
Welcome and IntroductionsWelcome and IntroductionsProduction SIG OverviewProduction SIG OverviewNorway’s Integrated Information Platform Project (IIP)Norway’s Integrated Information Platform Project (IIP)WITSML Production Reporting Standards and the Norway WITSML Production Reporting Standards and the Norway
OLF Daily Partner Production Reporting DeploymentOLF Daily Partner Production Reporting DeploymentQuestions & AnswersQuestions & Answers
10:00 Morning Break10:00 Morning Break
1212
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda
08:00 Registration and Breakfast08:00 Registration and Breakfast08:30 Meeting Begins08:30 Meeting Begins
Welcome and IntroductionsWelcome and IntroductionsProduction SIG OverviewProduction SIG OverviewNorway’s Integrated Information Platform Project (IIP)Norway’s Integrated Information Platform Project (IIP)WITSML Production Reporting Standards and the Norway WITSML Production Reporting Standards and the Norway
OLF Daily Partner Production Reporting DeploymentOLF Daily Partner Production Reporting DeploymentQuestions & AnswersQuestions & Answers
10:00 Morning Break10:00 Morning Break
1313
What’s in a name?What’s in a name? xField SIG (2003)
xField = { SmartField, i-field, e-field, Digital Oilfield of the Future, Intelligent Field, Field of the Future … }
Integrated Operations SIG (2004) Production SIG (2006)
1414
Production SIG OverviewProduction SIG Overview January 2003, BostonJanuary 2003, Boston
POSC Board recommends strategic focus on production standards POSC Board recommends strategic focus on production standards to support future digital oilfield operations.to support future digital oilfield operations.
May 2003, Houston and London May 2003, Houston and London ““xField SIG” seminarsxField SIG” seminars Presenters: Presenters: BP, Shell, Halliburton, Invensys, OSIsoft, BP, Shell, Halliburton, Invensys, OSIsoft,
SchlumbergerSchlumberger, SGI, SGI November 2003, Houston, POSC Annual MeetingNovember 2003, Houston, POSC Annual Meeting January 2004, HoustonJanuary 2004, Houston
Joint seminar with U. of HoustonJoint seminar with U. of Houston March 2004, LondonMarch 2004, London
Distributed Temperature Survey work group meetingDistributed Temperature Survey work group meeting
1515
Production SIG OverviewProduction SIG Overview May 2004, HoustonMay 2004, Houston
OTC Digital Energy Session: Peter Goode (Schlumberger SIS OTC Digital Energy Session: Peter Goode (Schlumberger SIS President), “The key technical components for Version 1 of the President), “The key technical components for Version 1 of the Digital Oilfield are already available.”Digital Oilfield are already available.”
Joint seminar with U. of Houston – attempt to initiate collaborative Joint seminar with U. of Houston – attempt to initiate collaborative activitiesactivities
BP, ExxonMobil, ShellBP, ExxonMobil, Shell, Unocal, Aspentech, , Unocal, Aspentech, Halliburton, Invensys, Halliburton, Invensys, SchlumbergerSchlumberger, SGI, SGI
Integrated versus isolated solutions?Integrated versus isolated solutions? Monitoring, optimization and control?Monitoring, optimization and control?
Multi-scaleMulti-scale Data driven model developmentData driven model development Abnormal situation detectionAbnormal situation detection RT decision-making using large data setsRT decision-making using large data sets Surface facility – reservoir interactionSurface facility – reservoir interaction Data volume explosion Data volume explosion how to handle and find useful data how to handle and find useful data Safety concerns in highly instrumented fieldsSafety concerns in highly instrumented fields
1616
Production SIG OverviewProduction SIG Overview
June 2004, Stavanger and HoustonJune 2004, Stavanger and Houston ““xField” xField” “Integrated Operations” SIG meeting“Integrated Operations” SIG meetingBP, Chevron, ExxonMobil, Shell, HalliburtonBP, Chevron, ExxonMobil, Shell, Halliburton, ,
Paradigm, Paradigm, SchlumbergerSchlumbergerIntelligent Oilfield Ops – review U. of Houston seminar Intelligent Oilfield Ops – review U. of Houston seminar DTSDTS
November 2004, Houston “Int Ops SIG” November 2004, Houston “Int Ops SIG” DTSDTSDigital Oilfield (Andy Howell, Schlumberger)Digital Oilfield (Andy Howell, Schlumberger)Norway IIP Project UpdateNorway IIP Project Update
1717
Production SIG OverviewProduction SIG Overview January 2005, New Delhi, “Int Ops” SIGJanuary 2005, New Delhi, “Int Ops” SIG
Integrated OperationsIntegrated Operations DTSDTS
April 2005, Aberdeen and Stavanger,April 2005, Aberdeen and Stavanger,“Int Ops” SIG“Int Ops” SIG DTSDTS Norway Daily Partner Production Reporting (TietoEnator)Norway Daily Partner Production Reporting (TietoEnator)
WITSML for Production ReportingWITSML for Production Reporting RT Operations (Sense Intellifield)RT Operations (Sense Intellifield) Norway IIP Project UpdateNorway IIP Project Update
April 2005, StavangerApril 2005, Stavanger Norway OLF Integration Operations SeminarNorway OLF Integration Operations Seminar
May 2005, Houston, “Int Ops” SIG May 2005, Houston, “Int Ops” SIG Same as AprilSame as April Statoil and Hydro on Integration Operations Strategy and VisionStatoil and Hydro on Integration Operations Strategy and Vision Also, Merrick Systems, Sense Intellifield, Roxar, WeatherfordAlso, Merrick Systems, Sense Intellifield, Roxar, Weatherford
May 2005, London, DTS Work Group MeetingMay 2005, London, DTS Work Group Meeting
1818
Production SIG OverviewProduction SIG Overview August 2005, Houston, PRODML Initiative Kick-Off August 2005, Houston, PRODML Initiative Kick-Off
MeetingMeeting November 2005, POSC Annual MeetingNovember 2005, POSC Annual Meeting
Updates on WITSML Production Reporting and Norway IIP Updates on WITSML Production Reporting and Norway IIP ProjectProject
December 2005, PRODML Work Group formally December 2005, PRODML Work Group formally establishedestablished
December 2005, WITSML V1.3.1 PublishedDecember 2005, WITSML V1.3.1 Published With WITSML Production DTSWith WITSML Production DTS
March 2006, Houston, Production SIGMarch 2006, Houston, Production SIG WITSML Production ReportingWITSML Production Reporting WITSML Production DTSWITSML Production DTS WITSML Production Fluid PropertiesWITSML Production Fluid Properties PRODML Work Group UpdatePRODML Work Group Update
April 2006, WITSML Production Reporting April 2006, WITSML Production Reporting (V1.3.1 Addendum) Published(V1.3.1 Addendum) Published
1919
Production SIG OverviewProduction SIG Overview May 2006, Houston, Production SIGMay 2006, Houston, Production SIG
Norway IIP Project UpdateNorway IIP Project Update WITSML Production Reporting / Norway Partner WITSML Production Reporting / Norway Partner
ReportingReporting WITSML Production Fluid PropertiesWITSML Production Fluid Properties PRODML Work Group UpdatePRODML Work Group Update WITSML Production DTSWITSML Production DTS
June 2006, Stavanger and AberdeenJune 2006, Stavanger and Aberdeen Same as MaySame as May
September 14 & 28, October 3, 2006, September 14 & 28, October 3, 2006, Production SIG Steering Committee Production SIG Steering Committee Conference CallsConference Calls
October 20, 2006 Today’s eventOctober 20, 2006 Today’s event
2020
What Was Being SaidWhat Was Being SaidBack in mid-2004?Back in mid-2004?
2121
Some related activitiesSome related activities
CERA DOFFCERA DOFFSPE Real Time Operations TIGSPE Real Time Operations TIGSPE Digital Energy Study GroupSPE Digital Energy Study Group
API/GCIMT eFields ProjectAPI/GCIMT eFields ProjectReal Time Reservoir Management [TTG Group-OG21]Real Time Reservoir Management [TTG Group-OG21]
WITSML Drilling SIGWITSML Drilling SIGStrategic Decision SciencesStrategic Decision Sciences
UH CIOOUH CIOO……
Many internal / joint projects in oil / service companiesMany internal / joint projects in oil / service companies……
2222
The Smart FieldThe Smart FieldReal-Time OperationsReal-Time Operations
Capture
Process
Store
Analyze
Simulate
Capture
Capture
Visualization
Web
Facilities
Wells
Reservoir
Real-TimeAutomated Analysis
Real-TimeUnderstanding
Real-Time Operations
Source: Landmark
2323
Smart SystemsSmart SystemsFrom self-guiding missiles to self-replenishing fridges, the basic From self-guiding missiles to self-replenishing fridges, the basic
approach of all “smart technology” is measure-model-controlapproach of all “smart technology” is measure-model-control
– measure system properties– model actual vs. desired behaviour– derive required correction parameters (adaptive control)– implement control
∆xField
Acquire
Model
Analyze
Control
Source: Shell
2424
Business Headquarters
Capacity Planning Design [months/years]
Operational Planning [months/years]
Scheduling [days/months]
Supervisory Control [minutes/hours]
Regulatory Control [sec/minutes]
Well & Surface facilities
-Flow, pressure and temperature in wells and separator-Fuel injection to produce heat out of a boiler
-SCADA systems for coordinating flow stations and pipelines-Gas distribution/optimization on a pipeline network-Monitoring wellheads, multiples and flow stations
-Scheduling of injection/production plan and resources-Opening and closing wells or partial completions-Adjusting well operating parameters
-Planning of injection/production plan and resources-Planning drilling and workover resources-Supply Chain Management & Market and customer demands
-Asset life cycle and installed based maintenance or growth-Supply Chain Management & Market and customer demands
Aut
omat
ion
leve
l
Tim
e-scale
Fast cycle
Slower cycle
Source: Saputelli SPE 83978
Time Scales (106 range)
xField
Acquire
Model
Analyze
Control
2525
CERA DOFF: Stated Industry benefits
Enhanced recovery: 125 billion BOELower operating costs: $4-8 billion/year/company
Increased production rates: increase utilization 2-6%Lower facilities cost: 5-10% (3-5 years)
Decreased drilling costs: 5-15%But
Benefits are not independent, and they requireIntegration of higher quality data
Significant change in organizations and work processes
Source: CERA DOFF executive summary
Total asset awarenessActing on awareness
Increased use of full asset awareness
2626
Comments from OperatorsComments from Operators
Better decisions fasterBetter decisions faster
$250 million USD / year cost savings$250 million USD / year cost savings
It’s not about the technologyIt’s not about the technology
Integrate facilities, wells, subsurfaceIntegrate facilities, wells, subsurface
Find right level of ‘smartness’ for each assetFind right level of ‘smartness’ for each asset
2828
POSC xField: suggested work
XML standards for collaborationextending footprint of WITSML to include all data types required for
Production System Surveillance and Reservoir SurveillanceSmart Sensors
what is needed for plug-and-play at each level of OSI modelAPI’s for downhole intelligent devices, protocols (SOAP?), metadata
and metadata managementMarket Studies
smart surveillancefor “shared services” in data acquisition and management,
value-added services (pre-processing, analysis, interpretation) publishing,…
potential business models, and implementation technologies: web services.
2929
POSC xField Approaches
Understanding / problem identification
- pursue problems with clear (shared) business purposes
Adopt / adapt WITSML
-new Data Types to focus on Production Operations-production volumes, production tests, temperature, pressures
Focus = Architectures + Data
Develop standards via Pilot Projects
Players = oil + service + regulators
Incremental, rapid results
Catalogues of related work / relevant standards
3030
An oil company perspective on StandardsAn oil company perspective on Standards
Standards save money!Standards save money!uniform hardware, applications, data save $100 uniform hardware, applications, data save $100
Million/yearMillion/year
Standards lead to better science, which increases Standards lead to better science, which increases valuevalue
Use standards to address interface issuesUse standards to address interface issues
It’s better to get common than to be bestIt’s better to get common than to be best
Industry standards provide cost effective bridge to Industry standards provide cost effective bridge to the digital oil fieldthe digital oil field
3131
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda
08:00 Registration and Breakfast08:00 Registration and Breakfast08:30 Meeting Begins08:30 Meeting Begins
Welcome and IntroductionsWelcome and IntroductionsProduction SIG OverviewProduction SIG OverviewNorway’s Integrated Information Platform Project (IIP)Norway’s Integrated Information Platform Project (IIP)WITSML Production Reporting Standards and the Norway WITSML Production Reporting Standards and the Norway
OLF Daily Partner Production Reporting DeploymentOLF Daily Partner Production Reporting DeploymentQuestions & AnswersQuestions & Answers
10:00 Morning Break10:00 Morning Break
3232
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda
10:30 Meeting Continues10:30 Meeting ContinuesUpdate on PRODML Work Group (Optimization Update on PRODML Work Group (Optimization
Standards)Standards) History and StatusHistory and Status Business CaseBusiness Case Pilot Activities and DemosPilot Activities and Demos
Questions & AnswersQuestions & Answers
12:00 Lunch12:00 Lunch
3333
Production SIG, October 20 AgendaProduction SIG, October 20 Agenda 13:00 Meeting Continues13:00 Meeting Continues
Update on PRODML Work Group (continues)Update on PRODML Work Group (continues) Public Review ResultsPublic Review Results Plan to Publish Version 1.0Plan to Publish Version 1.0 Transition to POSC and the Production SIGTransition to POSC and the Production SIG
Production SIG ActivitiesProduction SIG Activities 14:30 Adjourn SIG Meeting14:30 Adjourn SIG Meeting
14:30 – 15:00 14:30 – 15:00 PRODML Work Group Steering Committee Meeting (for PRODML Work PRODML Work Group Steering Committee Meeting (for PRODML Work Group members only)Group members only)
15:00 – 15:30 15:00 – 15:30 Production SIG Steering Committee MeetingProduction SIG Steering Committee Meeting(for current and prospective SIG members)(for current and prospective SIG members)