PBS - SEVERSTAL RESOURCES
PBS COALS
• 46 years of operating history
• 4th largest coal producer in Pennsylvania, the USA
• 48,000 acres of land in Somerset County, South Pennsylvania
• 147 million tons of in-place reserves
• 251 million tons of measured and indicated resources
• 12 operating mines with 8 new mines currently permitted
• 2 cleaning/load out plants
• Access to 2 major rail lines
• Experienced and available local workforce
2007 2008 2009 2010F 2011F Share'11, %Jim Walter 3 800 4 400 5 700 6 400 6 000 21%Cliffs 3 700 4 200 4 500 5 000 4 500 16%Consol 2 500 3 500 5 100 6 000 4 500 16%PBS 2 500 2 700 3 500 4 000 4 000 14%Alpha 3 150 3 200 3 450 3 700 3 300 12%Bluestone 1 350 1 200 1 700 1 700 1 700 6%ArcelorMittal 800 1 000 1 250 1 500 1 500 5%United 1 000 1 200 1 500 2 100 1 200 4%Other 1 420 -85 740 1 160 1 050 4%ICG 50 600 1 000 1 200 600 2%Total 20 270 21 915 28 440 32 760 28 350 100%
PBS HAS 14% OF LV PRODUCTION IN THE USA
PBS is alternative to “big three suppliers” source of low volatile hard coking coal-Sufficient reserve base-Permits in place-Pier space in Newport News and Norfolk, starting from June’2011 – also in Baltimore-Commitments from railroads-Controlled costs
PBS IN THE MARKET PLACE
UNDERGROUND MINING
• 6 drift access room and pillar mines; 11 continuous mining units
• Raw production of 2,1 million tons in 2008 with potential to increase to 3,4 million tons in two years
• Good infrastructure
• New mines:
• Kimberly Run drift mine
• Horning D drift mine
• Roytown 2nd unit added
Agustus Deep Mine
HorningQuecreek Deep Mine
Kimberly Run Deep Mine
SURFACE MINING
• 6 mines operating, 5 additional mines permitted, 5 mines in permitting process
• 1 dragline site – 44 cubic yard capacity
• 5 shovel / truck sites – 14 to 33 cubic yard capacity
• Raw production of 1,2 million tons in 2008
• 135 company employees and 20 contractor employees
Buffalo Surface Mine
7820 Dragline operating at Buffalo Surface Mine
Shade Creek Plant
• 600 raw tons per hour
• 4,5 million raw tons per annum (3,4 million clean tons)
• 10’000 ton train load-out on Norfolk Southern (100 tons per rail car)
PROCESSING FACILITIESShade Creek Plant
Cambria
• Rebuilt and upgraded to 400 raw tons per hour
• 2,7 million raw tons per annum (2,0 million clean tons)
• 7’200 ton train load-out on CSX rail line (90 tons per car)
PROCESSING FACILITIESCambria Plant
Cambria Rail Load Out
Cambria under construction
Construction just completed
SUPERIOR MARKET ACCESS
10-14 days to Europe
15 days to
Brazil
• Well-developed infrastructure
• Railroad flexibility
• Access to port piers in Baltimore and Norfolk
• Proximity to major seaborne markets
25 days to India30 days to China
KEY CLIENTS OF PBS COALS
PBS Coals
Yevgeny Shmakov
Senior Sales Manager
Severstal Resources
Klary Tsetkin Str. 2/3
Moscow, 127299
Russia
Office: +7 (495) 981 09 10, ext. 6728
Fax: +7 (495) 981 09 18
Mobile: +7 (917) 501 1612
E-Mail: [email protected]
E-Mail: [email protected]
PBS COAL INC. / SEVERSTAL RESOURCES CONTACTS
For additional information please contact:
Agents in INDIA
NARESH SHARMAM/s Manali Engineering India5,6,7,8 3rd floor ,Old Jail RoadCivil Lines, Gurgaon
Email:- [email protected]:- www.manaliengineering.comph 0091-124-4072478,3202478Mobile:- 09999724168