1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and...

39
1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update

Transcript of 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and...

Page 1: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

1

October 30, 2008

WECC Meetings

Marina Del Rey, California

ACE Diversity Interchange: Overview and Update

Page 2: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

2

• ADI stands for Area Control Error (ACE) Diversity Interchange.

• ADI is the pooling of individual Area Control Errors (ACE) to take advantage of control error diversity (sign differences associated with the momentary generation/load imbalances of each control or balancing area).

What is ADI?

Page 3: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

3

• By pooling ACE, participants are able to: Reduce control burden on individual control

areas through the ADI “equal share” allocation method;

Reduce generator movement; Reduce sensitivity to intermittent resource

output; and, Improve Control Performance and reduce

CPS2 violations.

Benefits of ADI

Page 4: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

4

What ADI is Not…

• An ancillary service;• A process that will impact the terms and

conditions of transmission or energy service;• An energy sale nor does it necessitate the

purchase of transmission;• A commercial activity;• A tool for making economic dispatch decisions;

or,• A burden on other areas.

ADI is a reliability tool

Page 5: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

5

• The ADI tool has value if the Participants are either held harmless or made better off.

• The ADI tool is designed to be safe for Participants and safe to the system.

• Transparent to all Participants.

• KISS – Keep it Simple S.....

ADI Project Philosophy

Page 6: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

6

Base Map Source: BPA “Challenge for the Northwest” White Paper April 2006, pg 24with red highlight additions by RSB – PacifiCorpOct 2006

“Virtual Control Area” for sharing Control Error

PACIPCNWE

BC Hydro System

Current Scope of ADI

• The initial Participating Control Areas are: Idaho Power Company NorthWestern Energy PacifiCorp – East PacifiCorp – West

• British Columbia Transmission Corporation is the “host.”

• Any control or balancing area operator located in the WECC and adjacent to and interconnected with one or more Participating Control Areas may join as a new ADI participant.

Page 7: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

7

• ACE Diversity Interchange Agreement (including the Technical Design) was executed November, 2006.

• Operating Group’s goal to “GO LIVE” March 31, 2007 was achieved; due to EMS commitments, Idaho Power Company’s “GO LIVE” date was June, 2007.

• On-going discussions regarding ADI (British Columbia stakeholders, CAISO, ColumbiaGrid, FERC, NWPP entities, Northwest Wind Integration Workgroup, PNW Regional Council, Pacific NW Security Coordinator, WECC, WestConnect members, Western Governors’ Association, Utility Wind Integration Group, CAISO, etc.).

ADI Project Implementation

Page 8: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

8

• Participating Control Areas include: Arizona Power Bonneville Power Administration British Columbia Transmission

Corporation (and the Host) Idaho Power Company NaturEner PS New Mexico Nevada Power NorthWestern Energy PacifiCorp – East PacifiCorp – West Puget Sound Energy Salt River Project Seattle City Light Sierra Pacific Tucson Electric PS Colorado (Xcel)

• Expanded evaluation (real-time screen shot) and reporting tools.

Second Phase of ADI

BC Hydro System

Page 9: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

9

• ADI Agreement was amended and restated June 15, 2007.

• ADI Operating Protocols were revised March 1, 2008 (relaxed the ADI Adjustment from 25 MW to 30 MW).

• ADI Operating Protocols revised August 29, 2008 (revised fn 13).

• Twelve new Participants have executed Exhibit E.

• Two RIGs purchased for the expanded effort.

• Phase 2 implementation is underway and is scheduled to “GO LIVE” in January 2009.

ADI Project Implementation (cont’d)

Page 10: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

10

• Minimum structure necessary to enable implementation.

• ADI is a reliability tool and a transmission function activity.

• ADI does not change or impact system operations or control area functions.

• ADI Host and Participating Control Area Operators together are “Parties”.

• Start-up Costs paid by Participating Control Area Operators.

• Criteria to allow for the addition of parties: Located in Western Interconnection Adjacent to one or more Participating Control Area

Operators Execute Exhibit E to the ADI Agreement

The ADI Agreement

Page 11: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

11

• Termination with 30 days notice; 90 days for Host.

• New Parties pay incremental costs (own system and implementation) and share (per control area) of annual maintenance budget.

• Agreement Group – approves budget; interprets Agreement; establishes management procedures; resolves disputes; 2/3 vote required for decisions.

• Operating Group – establish, implement and modify Implementation Protocols, operating parameters, suspension protocols, etc.; majority rules among members.

The ADI Agreement (cont’d)

Page 12: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

12

• Reliable operations of ADI assured by suspension protocols, e.g.,

– Transmission overloads

– Directed by Reliability Coordinator

– Frequency deviation

– Reserve sharing

• Participants can suspend or trigger a global suspension, e.g., Idaho Power triggered a global suspension on July 30, 2008 and a global resumption on August 28, 2008.

• Suspension defaults to normal (i.e., without ADI) operations; this provides a fail-safe back-up.

• Adjacency requirement between/among Participants ensures transmission connectivity.

ADI Design

Page 13: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

13

• Implementation Protocols (Exhibit A to the Agreement).

• ICCP Communication links are established between/among the Host and the Participating Control Areas.

• Time-stamped ACE values are sent to the Host every two seconds.

• The Host evaluates ACEs for diversity; if there is no diversity, there is no ADI adjustment.

• If there is diversity, time-stamped ADI adjustments are calculated and sent back to the Participating Control Area Operators.

• The Participating Control Areas control to their ADI-adjusted ACEs and apply the adjustments in their CPS reporting.

• If either the Host or a Participant suspends, then the affected party(s) revert to unadjusted ACEs for control and CPS reporting.

• ACE data and causes for suspension are broadcast to all participants ensuring transparency and supporting evaluation.

ADI Design (cont’d)

Page 14: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

14

ADI Introduction to Existing Operations

Total of about 8 sec delay:

MeteredNet

Interchange

ScheduledNet

Interchange

FreqACECalcLogic

GenControlLogic

GenPulses

GenDispatch

OriginalACE

SendACE

to Host

Net & Allocate

ACE

SendBack toUtility

ModifiedACE

MeteredNet

Interchange

ScheduledNet

Interchange

FreqACECalcLogic

GenControlLogic

GenPulses

GenDispatch

OriginalACE

SendACE

to Host

Net & Allocate

ACE

SendBack toUtility

ModifiedACE

2 sec. delay EMS/AGC combined

2 sec. delay EMS/AGC combined

2 sec. delay 2 sec. delay

Page 15: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

15

Data Sent by Each Participant to Host

• Raw ACE. Consider interchange; ATEC; and, frequency terms

• Time-stamp of ACE calculation (seconds from midnight Universal Time Clock).

• Participant reference.

• Participant is on (Status 2) or is not on (Status 1).

• Does/Does Not Request Global Suspension.

• Participant Suspension Number or Global Suspension number.

• Positive ACE Integrated Adjustments (previous hour).

• Negative ACE Integrated Adjustments (previous hour).

Page 16: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

16

Data Sent by Host to each Participant and Broadcast

• ADI Adjustment.

• Timestamp (seconds from midnight UTC).

• Host Confirmation – Participant is on (Status 2) or is not on (Status 1).

• Indication that Global Suspension is/is not in effect.

• Global Suspension number or Participant Suspension number.

• Integrated Adjustments (+/-).

Page 17: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

17

ADI Equal Share Allocation Method

• Design Objective: minimize generator movement.

• Methodology:

– Determine ADI Limit.

– Raw ACEs compared.

– Net ACE calculated.

– Majority and Minority Groups determined.

– Majority Group’s aggregated ACE zeros-out Minority Group’s individuals ACEs.

– Minority Group’s aggregated ACE is applied in equal shares to the Majority Group’s individual ACEs to the extent possible (no sign change allowed).

Page 18: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

18

PCA Raw ACE ADI Adjustment Adj. ACE A -46 MW +46 MW 0 MW B -40 MW +40 MW 0 MW C +60 MW -46 MW 14 MW D +40 MW -40 MW 0 MW

Net: 14 MW 14 MW

• No ADI Limit is imposed in this example.• If there is no diversity, there is no adjustment to ACE.• Summed values of Raw ACEs and ADI-adjusted ACEs are equal. • In this example, the “Majority Group” areas have positive ACE

values (C and D, consistent with the Net Error); the “Minority Group” areas have negative ACE values (A and B).

• ADI Adjustments will not force a change in sign (+/-) for a participant.

ADI Equal Share Example

Page 19: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

19

ADI Equal Share Example w/ 15 MW Limit

PCA Raw ACE Maj. ADI Adj Min. ADI Adj A 20 15 -8.75 B - 5 - 5 5 C 10 10 -8.75 D -25 -15 15 E 20 15 -8.75 F 10 10 -8.75 G -20 -15 15Net ACE: 10 ACE(residual):15 50 -35 Net Adj: -35 35Net ACE: 10 25 -15

Page 20: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

20

ADI Limitations

• 30 MW Limit (originally, the limit was 25 MW) ADI adjustment limits ensure fail-safe implementation

• Diversity must exist An ADI adjustment will be calculated only if there is

ACE diversity (positive and negative values) among participants.

• No participant will be worse off An ADI adjustment will never make ACE worse, i.e., it

will always move ACE toward zero or will have no impact.

• Right to suspend Participants have the right to ignore (suspend) ADI

adjustments; suspension means that participants control to original ACE (status quo operations) and that participant’s ACE is excluded from the ADI calculation.

Page 21: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

21

ADI Suspension Protocols

• Host Will Suspend: If ADI system fails. If participant exceed time skew limits (10 seconds). If fewer than 3 control areas are participating.

• Participants Will Suspend (manually or automatically): If NWPP Reserve Sharing invoked. If a frequency deviation (+/- 0.3 hertz) If directed by Reliability Coordinator -- OTC violation is in

progress or expected.Trigger two ADI “systems” if concerns about the COI.

If there are two, consecutive CPS 2 violations. If AGC is paused or not in tie-line bias control. If other concern(s) arise.

• Suspension Protocols posted on Participants’ OASIS.

Page 22: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

22

Revised ACE Equation ACE = ({NIA+ADI}-NIS) – 10B(FA-FS) – IME + ATEC

• NIA Net actual interchange in megawatts• NIS Scheduled net interchange in megawatts

Includes dynamic schedules Does not include bilateral schedules to correct inadvertent interchange accumulation

• B Frequency Bias Setting (MW/0.1 Hz) for the balancing authority The constant factor 10 converts the frequency setting to MW/Hz

• FA Actual system frequency in Hertz• FS Scheduled system frequency in Hz

The WECC Time Monitor can establish a different value of scheduled system frequency during the manual time error correction periods

• IME Value (in MW) to compensate for known equipment error Attempt should be made to keep this term at zero by correcting known errors

• ATEC The WECC automatic time error correction Only for AGC control Not included for NERC performance reporting Based on accumulated inadvertent separately tracked for on- and off-peak time periods,

WECC time error, a control areas bias setting relative to the rest of the WECC bias settings, a constant for return initially set at 2 hours and limited to no less than 20% of the control area’s frequency bias setting and L10

This is the mechanism for returning inadvertent interchange within WECC• ADI ACE diversity interchange term which adjusts ACE values when enabled

Page 23: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

23

NERC/WECC Standards Verified

• NERC: BAL-001-0 (Real Power Balancing Authority) Defines the term L10 in terms of the each Balancing Authority’s

obligation to operate its average ACE for at least 90% of clock ten-minute periods (six non-overlapping periods per hour) during a calendar month within L10 limits

• NERC: BAL-004-0 Time Error Correction

• NERC: BAL-006-0 (Inadvertent Interchange) Performance Standards Reference Document Inadvertent Interchange Accounting Document

• WECC: INT-BPS-008-1 Bilateral Payback Policy Procedure for Time Error Control Description of Control Error Calculation

Page 24: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

24

ADI Evaluation: Net Adjustments

• Net ADI Adjustment

(Positive + Negative)

Idaho 1,733 MWh (0.14 aMW)

NorthWestern -1,207 MWh (0.09 aMW)

Pac-East -4,488 MWh (0.37 aMW)

Pac-West 2,205 MWh (0.18 aMW)

Aggregate -1,757 MWh (0.14 aMW)

BCTC Analysis.

Data period: June 21, 2007 – October 19, 2008.

Page 25: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

25

ADI Evaluation: Absolute Adjustment

• Applied ADI Adjustments

(Sum of Absolute Value)

Idaho 1,180 MW-days ( 2.3 aMW)

NorthWestern 865 MW-days ( 1.7 aMW)

Pac-East 1,075 MW-days ( 2.1 aMW)

Pac-West 2,300 MW-days ( 4.5 aMW)

Aggregate 5,420 MW-days (10.6 aMW)

BCTC Analysis.

Data period: June 21, 2007 – October 19, 2008.

Page 26: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

26

ADI Evaluation: Standard Deviation of ACEs

2006 2007January 16.7 15.8February 16.3 14.5March 14.9 15.6April 21.2 13.1May 18.6 12.5June 21.3 15.5July 25.9 13.8August 15.6 13.1September 14.6 13.2October 14.8 16.0November 15.7 15.0December 14.6 16.6

NorthWestern Energy Analysis.Data period: Comparing 2006 and 2007.

Page 27: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

27

ADI Evaluation: Generator Wear-and-Tear• Reduced Generator Movement• Accumulated Affect on Generator Controls

Sum of pulse widths (ms) of control pulses issued by AGC reduced by half with ADI:

Criteria:o Suspension was at least one hour; and,o Control action not influenced by planned hourly change in Net

Scheduled Interchange.sum of pulse

widths– 60 minutes prior to ADI Suspension 342,664 ms– 60 minutes of ADI Suspension 620,447 ms– 60 minutes after ADI Resumes 342,211 ms

Idaho Power Company Analysis.Data period: September 3, 2007 – January 21, 2008.

Page 28: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

28

ADI Evaluation: CPS-1 & CPS-2; Violations

• CPS-1 A statistical measure of Area Control Error (ACE)

variability and its relationship to frequency erroro Provides a frequency-sensitive evaluation of how well the

respective area has met its demand requirementso Measure based on a 12-month rolling average

• CPS-2 A statistical measure designed to limit unacceptably

large net unscheduled power flowso Provides an oversight function to limit excessive

unscheduled power flows that could result from large ACE values

o Determined monthly based on the percentage of time the 10-minute average ACE did not exceed L10

Page 29: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

29

ADI Evaluation: CPS2PacifiCorp - East

91

92

93

94

95

96

97

98

99

2007 - 2008

CP

S 2

Sc

ore

s (

%)

with ADI

w/o ADI

Page 30: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

30

ADI Evaluation: CPS2 ViolationsPacifiCorp - East

0

50

100

150

200

250

300

CP

S 2

V

io

la

tio

ns

w ith ADI

w /o ADI

Page 31: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

31

ADI Evaluation: CPS2PacifiCorp - West

86

88

90

92

94

96

98

100

CP

S 2

Sc

ore

s (

%)

w ith ADI

w /o ADI

Page 32: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

32

ADI Evaluation: CPS2 ViolationsPacifiCorp - West

0

50

100

150

200

250

300

350

400

450

CP

S 2

V

io

la

tio

ns

w ith ADI

w /o ADI

Page 33: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

33

ADI Evaluation:Magnitude of ADI Adjustment

-200-150

-100-50

050

100150

200

8030

-20

-70

0

5000

10000

15000

20000

25000

30000

35000

40000

Numberof

Points

Net Adjusted ACE

ADI Adjustment

Net Adjusted ACE compared with ADI Adjustment

35000-40000

30000-35000

25000-30000

20000-25000

15000-20000

10000-15000

5000-10000

0-5000

number of 2 second points

2158200

IPC Analysis: Four ParticipantsData Period: 8/11 – 9/30/2008

Page 34: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

34

ADI Evaluation:Magnitude of ADI Adjustment

-20.0

-15.0

-10.0

-5.0

0.0

5.0

10.0

15.0

20.0

25.0

30.0

1 101 201 301 401 501 601 701 801 901 1001 1101

Hours

MW

Ave

Neg Avg

Pos Avg

•IPC Analysis: Four ADI Participants•Data Period: 8/11 – 9/30/2008

Page 35: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

35

ADI Impact on Reporting

• ADI implemented

The system adjusted ACE value is used for real power balancing control performance reporting.

• ADI not implemented

The system unadjusted ACE value is used.

• Keep in mind performance reporting does not take into account the WECC ATEC term when determining compliance.

Page 36: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

36

ADI Impact on Inadvertent

NII = NIA – NIS

• Each Balancing Authority measures primary inadvertent interchange in megawatt-hours and returns it to or receives it from the transmission system as a whole through the ATEC term in the ACE equation.

• Represents the degree of “leaning on the tie” The objective is to keep this term relatively small Overtime, this quantity should move toward zero

• WECC does not allow bilateral return of inadvertent accumulation since the adoption of ATEC (Feb. 2003).

• The inadvertent impact of ADI should be more canceling than cumulative in nature.

Page 37: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

37

Suspension History

• Total Time Suspended: 0.84% (over seven months)65% Minimum Participants Requirement Not Met35% NWPP Reserve Sharing Event

• No Suspensions: Manually by Host Manually by Participant For frequency deviation Directed by Reliability Coordinator

BCTC Analysis.Data period: June 21, 2007 – January 22, 2008.

Page 38: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

38

ADI Expanded Evaluation/Reporting

• Web-based ADI Screen Shot (based upon MISO’s ADI program)

RAW ACE

Majority Group; Minority Group

ADI Adjustments (Minority Group)

Suspensions

• ADI Monthly Reporting

Net ADI Adjustments

Applied Adjustments

Suspensions

• Individual Participants’ Evaluation

CPS with and without ADI

Page 39: 1 October 30, 2008 WECC Meetings Marina Del Rey, California ACE Diversity Interchange: Overview and Update.

39

Presentation Conclusion

• Questions/Suggestions/Input