1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and...

13
1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week

Transcript of 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and...

Page 1: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

1

News and MiscellaneousUPO Mar. 22 2013Didier Contardo, Jeff Spalding

o General newso ESP and Manpower needso Reviewso Document to RRBo DESY week

Page 2: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

2General news

o Upgrade Simulation software Task Force– Presented in UPO and discussed extensively in XEB– Charge: ensure development of software needed for the simulation studies

https://cms-docdb.cern.ch/cgi-bin/DocDB/ProcessDocumentAdd

– The GED team will contribute to the TF (new extension to GED mandate)– F. Chlebana and D. Lange agreed to chair the USSTF see presentation later– Membership will include relevant experts from Offline/simulation, GED, PPD, Upgrade

project and WGs, and Physic Future group

o Meeting during CMS week– CMS plenary, two presentations: • Phase 1 Upgrades J. Mans • Studies towards Phase 2 scope F. Chlebana

– Upgrade plenary Wednesday afternoon • Agenda under construction, suggestions welcomed

o Pixel and HCAL MoU addendum – Tables have been provided to Andrzej for submission to Apr. RRB

Page 3: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

3ESP(2013)

o Pledging is supposed to be complete by end of March (one more week)– Please encourage people who are working to get themselves pledged…– We will start a review/pledge-sign-off on April 1. We will probably need a second round in

the summer

o Discussion of changes to ESP for 2014 has started. We will need to be clear on our “programmatic” R&D rather than “generic” R&D

Status March 20:216.5 months pledged, of 428 “need”

Page 4: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

4Estimate of number of FTEs currently working under Upgrade Coordination, and the FTE need for the next 1-2 years

Mar 13, 2013

“The effort on upgrades needs to increase by a factor three to fully meet our goals for Phase 1 and Phase 2 (Technical Proposal).“ “The increase is largely driven by the work towards a Technical Proposal for Phase 2, although Phase 1 coordination and management also needs about 2 additional FTE.”

Page 5: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

5Accompanying notes

1. More effort is needed in upgrade management. Areas needing more attention: – develop consolidated cost and schedule for Phase 1– scope, cost and schedule for Phase 2– consolidate and manage R&D program

Note that UC Coordinators (Didier and Jeff) are NOT included in ESP (as required by ESP rules), but are included in need.

2. Physics Groups must engage in the upgrade study program. This effort, organized by Chris though the “Future Physics” meeting, must ramp up urgently for the simulation campaign in 2013.

3. This includes the Track Trigger Task Force, and menu studies for Phase 2

4. This effort is about 50% R&D and concept development, and 50% Simulation Studies Group (which will work on all studies for Phase 2, not just Forward Detector)

5. The cross-coordination reps and work on upgrades in other coordination areas (other than Physics) are included in those areas and not double-counted here. Our view is that the level of effort needs to increase substantially here too – with (a) the need to ramp up the simulation campaign, and (b) scope considerations that require significant effort from TC (rad maps, feasibility of shutdown work etc)

6. The bulk of the technical work on upgrades is carried out within the detector projects, and is not included here, nor do we make an estimate of any shortfall.

7. The effort on upgrades needs to increase by a factor three to fully meet our goals for Phase 1 and Phase 2 (Technical Proposal). This is true also for the cross-coordination areas: offline, PPD and TC. The increase is largely driven by the work towards a Technical Proposal for Phase 2, although Phase 1 coordination and management also needs about 2 additional FTE.

o

Page 6: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

6We should add

o A few HIGH PRIORITY areas/needs in more detail, where we will really suffer

o Joe will make a call to the collaboration in April CMS Week

Page 7: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

7Reviews

GEM 1/1 LS2 proposal reviewA. Ball, T. Camporesi, F. Gasparini, M. Hansen, G. Iaselli, V. Krutelyov, A. Lanaro, M. Mannelli, W. Smith, W.Zeuner,

G. Apollinari (Chair)

o Report now submitted to MB

http://indico.cern.ch/conferenceDisplay.py?confId=2361611. Continue and refine the trigger-based justification for the ME1/1+GE1/1 system by the CMS

Upgrade Week in June 2013.2. “Apply” for GE1/1 project approval based on trigger-based justification.3. Drop the “Demonstrator Test” after LS1 from the GE1/1 program.4. Finalize the dummy installation plans for LS1. Include studies of services minimal bending

radius. Plan and Coordinate with the CMS Technical Coordination all the activities in LS1 (dummy installation test, limited cables and services installation, cooling solution determination, clearances checks, etc) that will improve the chances of a successful “Slice Test” in CY17

5. Concentrate on Trigger and Electronics Development6. Prepare a viable, fully-worked-out plan for a “Slice Test” following the 2016 YETS.7. Prepare cost estimates for the full project with the goal of achieving the same level of detail as

the chamber cost estimateClearly identify and separate “cost in the books” from “in-kind” contributions to the project and manage the contributions from other institutions appropriately vis-à-vis the project book cost.

Page 8: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

8Reviews

GEM 1/1 LS2 proposal review

o Follow-up includes

o Simulation studies are ongoing further establish trigger improvement by June. Targeted follow-up review, including L1-Trigger Project and Physics

o Further development of cost estimate and funding model by June. Andrzej should review with FB-links, considering situation with Phase 1

funding and MM pledges Also project schedule and funding profile

The path for adding a new project to Phase 1 scope MB CB RRB & LHCC (TDR)

Page 9: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

9Reviews

High Precision Spectrometer proposalo Two Proposals for far forward physics received last week from the “HPS

community”– The group could not agree on a single proposal1. CMS-TOTEM Proton Spectrometer https://cms-docdb.cern.ch/cgi-bin/DocDB/ProcessDocumentAdd

• Proposes to install proton tracking and timing detectors in Roman Pots available from the TOTEM collaboration at 200-225m sides from the CMS IP

2. The CMS High Precision Spectrometer (HPS) Subdetector Proposal https://cms-docdb.cern.ch/cgi-bin/DocDB/ProcessDocumentAdd

• Proposes to install proton tracking and timing detectors in Moving Beam Pipe sections at ˜ 240m sides from the CMS IP

o Two proposals are based on same detector developments and have similar technical timeline to install in LS1 or following TS; and later (by LS2) implement station at 420m for Higgs acceptance reach

o We propose a single review committee for both proposals and will develop the charge with the SP – targeting report for the MB in June

Page 10: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

10Reviews

GRPC R&D proposal (Wesley)

o Review process is completed with follow-up answers to the referee’s questions

o Final report in DocDB:https://cms-docdb.cern.ch/cgi-bin/DocDB/ShowDocument?docid=11796

o Proposal is to ”approve an R&D program of limited scope for two years. Before the end of this period, we would require a new proposal and status report to continue the program.”

Page 11: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

11Document for RRB

o We were asked to prepare a document for the MB/FB that may be sent to the RRB – describe the CMS process for Phase 2: as for Phase 1, TP(2014) for the whole Phase 2

program followed by TDRs(~2016) for each upgrade project– TP will include full cost estimate– currently evaluating scope (list upgrades under consideration), with studies for physics

performance benefit, and estimates for cost and work plan

o A cost “in the range 300 MCHF” has already been indicated to the RRB

o We are in the process of estimating the cost range for each upgrade under consideration - we need to improve the estimates in several places, and combine in a “cost matrix” Guidance for straw man concepts for S3 simulation studies this summer The full cost estimate will be in the TP, but we may be requested for cost information

much ahead of this

Page 12: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

12DESY Week

Monday-Friday June 3-7

DESY, Hamburg

Block timetable & travel information are on the web site. More details to follow.

http://indico.cern.ch/conferenceDisplay.py?confId=236161

o Will include an Upgrade MB and a CB

o Will have a poster session, CINCO link bellow

https://cms-mgt-conferences.web.cern.ch/cms-mgt-conferences/conferences/conf_display.aspx?cid=

1160

Registration is open since Mar. 1

Page 13: 1 News and Miscellaneous UPO Mar. 22 2013 Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.

13Schedule for the Week

o Goals for the Week… focus on a set of questions to– Guide consideration of Phase 2 scope– Choices for straw man concept studies in

S3 simulation– Prepare for ECFA workshop in October

o The proposal is to have a series of plenary talks which answer specific questions

initial ideas for questions

o And parallel sessions Tue/Thur– Support these plenaries– Preparing for work over the summer on

the simulation campaign and towards ECFA

Send comments/suggestions