1 MULTIDISCIPLINARYENGINEERINGSERVICES. 2 CONSORZIO SIM OVERVIEW With the purpose to provide our...
-
Upload
sean-chase -
Category
Documents
-
view
219 -
download
2
Transcript of 1 MULTIDISCIPLINARYENGINEERINGSERVICES. 2 CONSORZIO SIM OVERVIEW With the purpose to provide our...
11
MULTIDISCIPLINARYMULTIDISCIPLINARY
ENGINEERINGENGINEERING
SERVICESSERVICES
22
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
With the purpose to provide our Clients With the purpose to provide our Clients for a complete range of engineering for a complete range of engineering services, in 1997 N° 4 specialized services, in 1997 N° 4 specialized Engineering Companies joined together Engineering Companies joined together allowing the born of Consorzio SIM.allowing the born of Consorzio SIM.
In 2005 a fifth company joined to original In 2005 a fifth company joined to original four and as of today Consorzio SIM is a four and as of today Consorzio SIM is a Multidiscipline Engineering organization Multidiscipline Engineering organization accounting of about 68 qualified persons accounting of about 68 qualified persons (including administrative personnel). (including administrative personnel).
33
In 2000 the company has been certified according to UNI-EN-In 2000 the company has been certified according to UNI-EN-
ISO 9001 (1994)ISO 9001 (1994)
In 2003 the company renewed the certification according to In 2003 the company renewed the certification according to
UNI-EN-ISO 9001 (2000)UNI-EN-ISO 9001 (2000)
In 2005 another firm was added into Consorzio SIM (now there In 2005 another firm was added into Consorzio SIM (now there
are 5 firms and 4 departments)are 5 firms and 4 departments)
In 2007 an agreement of collaboaration has been signed In 2007 an agreement of collaboaration has been signed
between Consorzio SIM and Technip Italybetween Consorzio SIM and Technip Italy
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
44
ORGANIZATION CHARTORGANIZATION CHART
Directorate GeneralChairmanship
Procurement Unit Engineering Unit Business Unit
Quality Management System
Piping Dpt. Civil Dpt.
Administrative Office
Technical Office Information Systems
Electrical Dpt.Instrument & Automation Dpt
Project Manager
Piping Project Leader Civil Project Leader I&A Project Leader Electrical Project Leader
Senior Designer
Junior Designer
Structural Engineer
Senior Designer
Junior Designer
Senior Designer
Junior Designer
Senior Designer
Junior Designer
55
Our designers staffOur designers staff
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
Mechanical Dpt.Mechanical Dpt.CivilCivil
Dpt.Dpt.I. & A. I. & A. Dpt.Dpt.
Electrical Electrical Dpt.Dpt.PipingPiping StressStress
EngineersEngineers 55
SpecialistSpecialist 88 88 22 44 33
PDS DesignersPDS Designers 99 7 (2 for U/G)7 (2 for U/G) 22 22
CAD DesignersCAD Designers 55 22 33 33
TotalTotal 3030 1616 99 88
66
Our staffOur staff
Mech. Mech. Dpt.Dpt.
CivilCivil
Dpt.Dpt.I. & A. I. & A. Dpt.Dpt.
Electr. Electr. Dpt.Dpt. TotalTotal
PotenzialPotenzial
(h/y)(h/y)58.00058.000 30.00030.000 17.00017.000 15.00015.000 120.000120.000
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
SIM's Potenzial
Civil Dpt.
I.&A. Dpt.
Electr. Dpt
Mech. Dpt
Mech. Dpt
Civil Dpt.
I.&A. Dpt.
Electr. Dpt
77
Our experience in engineering activitiesOur experience in engineering activities
Over 20 Over 20 yearsyears
From 10 to From 10 to 20 years20 years
From 5 to From 5 to 10 years10 years
Less 5 Less 5 yearsyears
10%10% 60%60% 20%20% 10%10%
Over 20 years; 10%
From 10 to 20 years; 60%
Less 5 years; 10%
From 5 to 10 years; 20%
Over 20 years
From 10 to 20 years
From 5 to 10 years
Less 5 years
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
88
TECHNICAL CAPABILITIESTECHNICAL CAPABILITIES Feasability studiesFeasability studies Front-end engineeringFront-end engineering Detailed engineeringDetailed engineering Procurement, expediting and inspection Procurement, expediting and inspection
(for I. & A. Dpt)(for I. & A. Dpt) Site SurveySite Survey
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
99
APPLICATION FIELDSAPPLICATION FIELDS Petroleum first treating plants and Petroleum first treating plants and
transportationtransportation Petroleum Refinery PlantsPetroleum Refinery Plants Petrochemical PlantsPetrochemical Plants Chemical and Pharmaceutical PlantChemical and Pharmaceutical Plant Electrical Power generation, Electrical Power generation,
transportation and distributiontransportation and distribution
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
1010
Hardware & Software Design ToolsHardware & Software Design Tools Hardware:Hardware:
N° 4 Servers (N° 2 for PDS projects) N° 4 Servers (N° 2 for PDS projects) N° 60 Workstations (N° 24 for PDS)N° 60 Workstations (N° 24 for PDS) N° 1 Workstation for Smart Plant ReviewN° 1 Workstation for Smart Plant Review N° 5 plottersN° 5 plotters
Software:Software: Intergraph PDS, Microstation, AutoCadIntergraph PDS, Microstation, AutoCad Caesar II, Triflex (Stress Analysis), Puma (Piping Caesar II, Triflex (Stress Analysis), Puma (Piping
MTO)MTO) Civil & Structural Design: STAAD PRO, SAP 2000Civil & Structural Design: STAAD PRO, SAP 2000 Instrumentation calculation toolsInstrumentation calculation tools Electrical cable calculation, lighting calculation, Electrical cable calculation, lighting calculation,
electrical system calculation toolselectrical system calculation tools
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
1111
REFERENCE LISTREFERENCE LIST (Main customers) (Main customers)
TECHNIPTECHNIP Technip-KTITechnip-KTI SNAM (Gas & Liquid Petroleum Product Transportation)SNAM (Gas & Liquid Petroleum Product Transportation) SNAM PROGETTI (Engineering)SNAM PROGETTI (Engineering) API (Refinery)API (Refinery) AGIP (Refinery And Distribution)AGIP (Refinery And Distribution) ENEL (Electrical Generation, Transportation And ENEL (Electrical Generation, Transportation And
Distribution)Distribution) RAFFINERIA DI ROMA (Refinery)RAFFINERIA DI ROMA (Refinery) ABB S.p.A.ABB S.p.A.
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
1212
PROJECTS LISTPROJECTS LIST
• EXPORT REFINERY PROJECT (FEED EXPORT REFINERY PROJECT (FEED CONTRACT) CONTRACT) - JUBAIL (2007) - T- JUBAIL (2007) - TECHNIP ITALY S.p.A.ECHNIP ITALY S.p.A.
• YANBU ETHYLENE PLANT – YANSAB – YANBU ETHYLENE PLANT – YANSAB – SABIC (2005-2006) - SABIC (2005-2006) - TECHNIP ITALY TECHNIP ITALY S.p.A.S.p.A.
• CNRL –HORIZON OIL SANDS PROJECT – CNRL –HORIZON OIL SANDS PROJECT – PRIMARY UPGRADE – CANADA (2005-PRIMARY UPGRADE – CANADA (2005-2006)2006)TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.
• GTL ORYX – QATAR (2003-2004)GTL ORYX – QATAR (2003-2004)TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.
• ACETIC ACID PLANT – SABIC (2002-ACETIC ACID PLANT – SABIC (2002-2003)2003)TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.
• PHU MY FERTILIZER PROJECT (2002)PHU MY FERTILIZER PROJECT (2002)TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.
• NUOVO PTA # 1 – ZHUHAI (2001/2002)NUOVO PTA # 1 – ZHUHAI (2001/2002)TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.
• CAPCO - # 6 PTA PROJECT (2001/2002)CAPCO - # 6 PTA PROJECT (2001/2002)TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.
• CENTRALE A BIOMASSE DI CUTRO CENTRALE A BIOMASSE DI CUTRO (2001/2002)(2001/2002)ENELPOWER S.p.A.ENELPOWER S.p.A.
• ISLA REFINERY UPGRADING PROJECT ISLA REFINERY UPGRADING PROJECT – –
SRU UNIT – UNITS 300/700 (2001) - KTI S.p.A.SRU UNIT – UNITS 300/700 (2001) - KTI S.p.A.• DESOLFORAZIONE GASOLIO FASE 2 – DESOLFORAZIONE GASOLIO FASE 2 – RAFFINERIA DI MILAZZO (2000/2001)RAFFINERIA DI MILAZZO (2000/2001) TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.• QVC VINYL PROJECT – QATAR (1999/2000)QVC VINYL PROJECT – QATAR (1999/2000)
TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.• IMPIANTO PRIMARY PACLITAXEL –IMPIANTO PRIMARY PACLITAXEL –
INDENA (1999)INDENA (1999) - TECHNIP ITALY S.p.A. - TECHNIP ITALY S.p.A.• MIDOR REFINERY – UNIT 02-03-04 (1999)MIDOR REFINERY – UNIT 02-03-04 (1999)
TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.• FIELD INTEGRATION – NAPHTA REFORMERFIELD INTEGRATION – NAPHTA REFORMER
COMPLEX – APC – EGYPT (1998/1999)COMPLEX – APC – EGYPT (1998/1999)
TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.• NAPHTHA REFORMER COMPLEX – APC –NAPHTHA REFORMER COMPLEX – APC –
ALEXANDRIA – EGYPT (1998/1999) – ALEXANDRIA – EGYPT (1998/1999) –
TECHNIP ITALY S.p.A.TECHNIP ITALY S.p.A.• CONDENSATE PROCESSING PLANT – DUBAICONDENSATE PROCESSING PLANT – DUBAI
– – TANKAGE AREA (1998) - TECHNIPETROL TANKAGE AREA (1998) - TECHNIPETROL S.p.A.S.p.A.
CONSORZIO SIM OVERVIEWCONSORZIO SIM OVERVIEW
1313
PROJECT MODELPROJECT MODEL
1414
PROJECT MODELPROJECT MODEL
1515
PROJECT MODELPROJECT MODEL