MSW management in Seville and its surrounding area

IPPC Implementation ExperienceSeville June 12th 2012

Page 2: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

Contents

Presentation of the group Firms belonging to the group History

Aborgase Activities Installations Complex of Montemarta Cónica IPPC implementation

Other firms of the group Edifesa Tegner Energía sur de Europa

Conclusions Contact information

2

Page 3: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

IPPC implementation process presentation

1.IPPC certification process summary2.Overview of facilities 3.Audit Results4.Actions carried out after audit 5.Mayor impacts of implementing the standard

3

Page 4: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

1 - IPPC Certification Process

4

The company The administration

Development of process description report Discussion and agreement on final process

description report

Carried out audit Correction of ”easily” corrigible

issues

Proposal of plant modification project

Accomplishment of plant modification project Fulfillment of all IEP requirements

May’05Nov’05

Apr’08

Autum’08

Apr’11

Mar’10

Oct’07Initial Integrated Environmental Permit

granting

Jul’09 Approved extension of Permit

Page 5: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex

5

Weight bridge

1

Gross MSW processing

2

Fermentation wharehouse 3

Compost processing

4

Compost aging area

5

Metal recycling plant

Plastic recycling plant

6

MSW Processing

Page 6: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex

6

Landfill

Landfill gas power plant

3

Closed areas Active landfill1Gas field2

Leachate pool 4

Leachate treatment plants5

Page 7: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex

7

Other waste

Recycle plant

1

Hospital waste plant2

Construction and demolition plant

3

Page 8: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

Clarification required Immediate corrective action Beyond Aborgase scope

3 - Audit Results

8

Carried out on April 2008

Implemented according to IPPC standard

Verified 164 issues

134 in order 30 no

conformities

Procedure Technical Documents Immediate accomplishment

Corrective measure

Cla

ssi

fica

tio

n

acc

ord

ing

to

Nature

30

134

9

7

11

3

7

6

1730 No

conformities

Page 9: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

3 - Audit Results

9

1 Clinical Waste (RBS) admission procedure

2 Documented control plan

3 Risk assessment for MA by ECCM

4 Maintenance and Cleaning Plan

5 Recovery of potentially recoverable fractions

6 Previous treatment of green waste (PARK and GARDENS) , landfilling treatment procedure during technical shutdowns and weekends

7 Landfilling of potentially recoverable fractions

8 Basic characterization analysis clinical waste (RBS)

9 Temporary storage area for no admissible waste

10 Open air storage of recovered fractions, including compost

11 Green waste is neither ground nor composted

12 Clinic waste piling above 2 levels

13 Clinic waste labeling

14 Editing of landfill incidents book

15 Neither segregation nor storage of WEEE (waste electrical and electronic equipment)

16 Open containers of Hazardous Waste

17 Hazardous waste labeling

18 Hazardous Waste area signaling 19 Used oil storage without dike

20 There is neither specific HW loading area, nor draining in the HW storing area

21 PTL and engines emission points conditioning

22 Leachate collection wells in closed and active landfill bodies

23 Untreated clinic and HW leachate and cleaning water

24 Compost and recovered fraction open air storage

25 Meteorological data recording

26 Leachate analytics parameters

27 Autoclave monitoring results report

28 No previously treated waste landfilled report

29 Report of landfilled waste with no previous treatment

30 Summary of 2007 control plan

Clarification required

Solution beyond Aborgase scope

Immediate solution

Page 10: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Immediate solution (I)

10

No conformities Improvement Action Implications Basic characterization analysis clinical waste (RBS)

Presented a suitability certificate of analytical operations proposed in standards used for this kind of waste

Increase in the current number of records and work procedures

Temporary storage area for no admissible waste

Justified the refuse of non admissible waste according to procedure describe in NC 1

Increase in controls

Clinic waste piling above 2 levels

According to containers homologation, they can be piled due to piling, resistance and sealing tests

Continue with the same working practice (no implication)

Clinic waste labeling Improvements in the HW signaling Slight improvement in the work procedure. HW area adaptation

8

9

12

13

12 13

Page 11: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Immediate solution (II)

11

No conformities Improvement Action Implications Neither segregation nor storage of WEEE

Studied commonly with IMS WEEE the option of sending material. The option is rejected due to the bad condition of the waste

Stored and sent just the potentially reused material (< 10 t/y)

Leachate collection wells in closed and active landfill bodies

The first leachate accumulation is detected in 2011. Installed a pneumatic system in order to pump it out

Continue with the same working procedure. NO IMPLICATION

Untreated clinic and HW leachate and cleaning water

Analyzed waste water and discharged to public sewage system is considered

Continue with the same working procedure. NO IPMLICATION

22

23

15

22

Page 12: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Clarification required (I)

12

No conformities Improvement Action Implications Clinical Waste (RBS) admission procedure

Development of an specific procedure for the clinic waste admission and acceptance

Increase in controls

Documented Environmental Impacts control plan

Adapted the existing control plan to the IPPC EIA requirements

Increase in controls

Risk assessment for MA by ECCM

Presented Risk Evaluation to the ECCMA

Increase in controls

Maintenance and Cleaning Plan

Developed a maintenance and cleaning program according to specifications

Increase in current working procedure records

2

3

1

4

Page 13: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Clarification required (II)

13

No conformities Improvement Action Implications Editing of landfill incidents book

Incident book is edited, including use instructions and custody responsible

Increase in controls

Open containers of Hazardous Waste

General improvement of the loading area; adapting tanks, and properly signaling and labeling

Increase in controls

Hazardous waste labeling

Hazardous Waste area signaling Used oil storage without dike There is neither specific HW loading area, nor draining in the HW storing area

16

17

14

18

19

20 16-20

Page 14: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Clarification required (III)

14

No conformities Improvement Action Implications Meteorological data recording

Created a record with meteorological parameters obtained from the closest National Network of Meteorological Stations

Increase control and records

Leachate analytics parameters

Increase of numbers of characterized parameters

Increase controls and records

Autoclave monitoring results report

Report with the result of parameters monitoring control in the autoclave (P, T, time) sent yearly to Environmental Authority

Increase in controls and records

27

28

25/26

2825

9 kms

Page 15: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Clarification required (IV)

15

No conformities Improvement Action Implications Report of landfilled waste with no previous treatment

Yearly report recording waste landfilled no previous treatment

Increase in controls

Summary of 2007 Control Plan

Report with results of sanitary data control to be sent to Environmental Authority

Increase in controls 30

29

Page 16: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Solution beyond Aborgase (I)

16

No conformities Actions Implications Recovery of potentially recoverable fractions

Designed a plant for bulky waste treatment Presented to local association a cost assessment in order to increase tipping fee

Constructed the first phase of the bulky waste treatment plant

No increase in tipping fee

Previous treatment of green waste, landfilling treatment procedure during technical shutdowns and weekends

Designed a bulky waste treatment plant

Desigend a revamping of MSW recycling plant, with 5 authomatized sorting lines, aimed at increasing capacit up to maximum

Constructed the first phase of the bulky waste treatment plant

After several modifications, increase manual sorting lines and optimized feeding and organic fraction refining processes Landfilling of potentially

recoverable fractions

6

7

5

5

Page 17: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Solution beyond Aborgase (II)

17

No conformities Actions Implications Open air storage of recovered fractions, including compost

Cost study of covering the area carried out

Proposed by ABORGASE, expanded plastic treatment warehouse

No coverage in the rest of storage areas

Green waste is neither ground nor composted

Designed a Bulky Waste treatment plant, with a front grinder for green waste (previous to composting)

Grinder in included in second phase, which was not finally accomplished

Compost and recovered fraction open air storage

Carried out cost assessment of covering all the required areas

Proposed by ABORGASE, expanded plastic treatment warehouse

No coverage in the rest of storage areas

11

24

10

24 10

Page 18: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

4 - Audit Results

18

1 Clinical Waste (RBS) admission procedure

2 Documented control plan

3 Risk assessment for MA by ECCMm

4 Maintenance and Cleaning Plan

5 Recovery of potentially recoverable fractions

6 Previous treatment of green waste , landfilling treatment procedure during technical shutdowns and weekends

7 Landfilling of potentially recoverable fractions

8 Basic characterization analysis clinical waste (RBS)

9 Temporary storage area for no admissible waste

10 Open air storage of recovered fractions, including compost

11 Green waste is neither ground nor composted

12 Clinic waste piling above 2 levels

13 Clinic waste labeling

14 Editing of landfill incidents book

15 Neither segregation nor storage of WEEE (waste electrical and electronic equipment)

16 Open containers of Hazardous Waste

17 Hazardous waste labeling

18 Hazardous Waste area signaling

19 Used oil storage without dike

20 There is neither specific HW loading area, nor draining in the HW storing area

21 PTL and engines emission points conditioning

22 Leachate collection wells in closed and active landfill bodies

23 Untreated clinic and HW leachate and cleaning water

24 Compost and recovered fraction open air storage

25 Meteorological data recording

26 Leachate analytics parameters

27 Autoclave monitoring results report

28 No previously treated waste landfilled report

29 Report of landfilled waste with no previous treatment

30 Summary of 2007 control plan

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

done

donedonedone

Partially

Partially

Partially

All no conformities found were finally corrected, except 3 whose solution exceeded ABORGASE scope; but

were partially solved

Page 19: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

5 - Major impacts - Operation and Investments

19

Operation Costs Processing cots increases due to the necessity of processing 100% of waste and fostering by-products recovery

+12%

Landfill adaptation costs

Expend costs for adapting landfills to national legislation during 2011 - 2018

6,4 M€

Infrastructure Environmental controls

General high increase in the level of control and recording, which will be expend during the landfill operating life plus the post closure period (- 2046)

300.000 €/year

New Infrastructures Bulky waste processing plant – phase 1

MSW plant expansion

By-products press expansion

650.000 €

1.900.000 €

140.000 €

IPPC Environmental Standard implementation has meant increase on control and recording levels, higher operation cost for

processing 100% of incoming waste and additional investments in landfill and processing plant

Page 20: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

5 - Major impacts - Operation and Investments

20

Increase in controls and records

Treat all waste and maximize recovery

Landfill Standards Post closure activity

Page 21: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

21

Conclusions – IPPC Implementation The whole certification process has taken 6 years, being still alive

The certification was completed successfully, being granted in October 2007, and extended in July 2009

Out of a total 165 issues, just 30 were no conform 7 were of immediate solution 17 required discussion to really understand the situation and agree a feasible solution In 6 the solution exceeded ABORGASE scope, 3 were solved by means of extra investment

and in 2, were partially solved in agreement with the administration

The implementation process, moreover 6 years of work, has implied additional investments (9,4 M€), higher operation costs (+12%) and high increase in number of controls and records

The additional cost (investment and operation) are partially covered by ABORGASE

The IPPC has been a high challenge, but today we do a more responsible and respectful waste management activity

Page 22: 1 MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012.

22

Questions & Answers