1 Mine Ventilation Risks & Controls Jason Wagstaffe Wagstaffe & Associates.

23
1 Mine Ventilation Risks & Controls Jason Wagstaffe Wagstaffe & Associates

Transcript of 1 Mine Ventilation Risks & Controls Jason Wagstaffe Wagstaffe & Associates.

1

Mine VentilationRisks & Controls

Jason Wagstaffe

Wagstaffe & Associates

2

VENTILATION HAZARDS

3

Ventilation HazardsSources of potential harm or situations with a potential to

cause loss include Gas Dust & particulate Spontaneous combustion Frictional ignition Windblast Heat Poor / inadequate ventilation Poor ventilation management Inadequate ventilation knowledge

W&AWa gst a ff e & Asso c iat es

4

VENTILATION RISK PREDICTION

5

Ventilation Risk Prediction

W&AWa gst a ff e & Asso c iat es

Each mine should undertake a Hazard Analysis & Risk Assessment of the Ventilation Hazards.

The Hazard Analysis will need to encompass (Not limited to):•Historical records of the mine’s ventilation systems including gas trends•Existing Primary & Auxiliary ventilation systems and its adequacy as the mine expands.

•Changes in mining conditions or mine design which may lead to hazards such as Spon.Comb or Outbursts having a greater influence.

•Coal seam and adjacent strata properties.•Methods of mining.

The magnitude of the risk will determine how to approach the implementation of controls.

6

VENTILATION RISKS

7

Ventilation Risks

W&AWa gst a ff e & Asso c iat es

Ventilation hazards can be broken into their associated risks.

GAS

Inrush, Outburst, ignition, explosion, asphyxiation.

DUST & DIESEL EMISSION & PARTICULATE

Airborne dust – Respirable / Inhalable & Dangerous Float Dust.

Diesel particulate – Respirable & unknown health issues.

SPONTANEOUS COMBUSTION

Heating, Fire, Explosion.

8

Ventilation Risks (Cont)FRICTIONAL IGNITION

Fire, Gas Explosion, Dust Explosion

WINDBLAST

Damage to ventilation appliances and mine equipment, Personnel injury.

HEAT

Dehydration, Exhaustion, Injury.

POOR / INADEQUATE VENTILATION

Frictional Ignition, Spontaneous Combustion, Heat, Dust & Particulate Contamination, Gas issues.

W&AWa gst a ff e & Asso c iat es

9

Ventilation Risks (Cont)POOR VENTILATION MANAGEMENT

Differential Pressure Issues,

High inefficiencies,

High running costs,

Financial loss,

Injuries sustained by employees in the act of working with or around ventilation appliances.

W&AWa gst a ff e & Asso c iat es

10

VENTILATION RISK CONTROL

11

Risk Control

W&AWa gst a ff e & Asso c iat es

GAS

Regular Inspections to ensure compliance with legislative standards.

Well maintained and calibrated gas detection equipment. (Both Hand held, this still includes the Locked Oil Flame Safety Lamp, & telemetric instruments)

Sufficient Air quantities for dilution.

Gas drainage (where applicable – large gas reservoirs)

Gas régime / reservoir modeling

Have systems in place that can deal with large quantities of gas if it is required.

Management Plan – with triggers and response action plans.

12

Risk Control (Cont)DUST

Airborne & Respirable Dust controlled via dust extraction units. (New Technology Now Available)

Easier to keep dust from becoming suspended then it is to eliminate or control once in suspension.

Sprays – machine mounted and fixed systems

Wet drilling

Too much air velocity can create dust issues.

Pre-drained coal may require water injection to assist with dust suppression.

An array of ‘Wetting’ agents are available to assist with dust suppression.

Limit employee exposure to dust.

W&AWa gst a ff e & Asso c iat es

13

Risk Control (Cont)DIESEL EMISSION & PARTICULATE

Wet or Dry filtration systems

Catalytic converters, Ceramic filters.

Air quantities sufficient to dilute emissions.

Well maintained diesel fleet with regular testing of exhaust systems

Ventilate “Dead ends” and “Blind Stubs” if personnel are working in these places with diesel powered machines.

Clean fuel technology is now more readily available. (The current technology has improved to a point where excessive engine wear or damage due to fuel additives is not an issue).

Consider decreasing the diesel fleet and increasing battery powered fleet.

W&AWa gst a ff e & Asso c iat es

14

Risk Control (Cont)SPONTANEOUS COMBUSTION

Regular inspections using both handheld detection equipment and body senses. (Mine Inspection System)

Mine Design / Ventilation Layout must take Spon. Comb. into consideration.

Long term air stream analysis trending.

Tube bundle gas detection systems may be worth considering.

Ventilation pressures need to be watched carefully. High differential pressures across pillars and slack coal will cause issues.

Ventilation Appliances need to be well maintained.

Management Plan - Triggers and Response Action Plans.

W&AWa gst a ff e & Asso c iat es

15

Risk Control (Cont)FRICTIONAL IGNITION

Sharp Cutting Picks

Good sprays

Air velocities capable of eliminating accumulations of gas

Operators must trained and be vigilant. Regular revision of training for operators will assist in maintaining knowledge base.

Try not to cut roof / floor stone

Minimise depth of cut in high flammable gas zones

Ready access to fire fighting equipment in working order.

Management Plan.

W&AWa gst a ff e & Asso c iat es

16

Risk Control (Cont)WINDBLAST

High standard of ventilation appliances required.

Mine plan needs to focus on minimising the windblast effect by having multiple entries / exits for air to travel.

Consider pressure relief doors in appliances that are adjacent to Windblast zone areas.

Operators need to be vigilant.

Management Plan - Triggers and Response Action Plans.

W&AWa gst a ff e & Asso c iat es

17

Risk Control (Cont)HEAT

Maintain reasonable air velocities for cooling effect.

Minimise radiated heat. Especially in single entries.

Operators must be educated in hydration principles.

Regular humidity checks and monitoring.

Consider installation of hydraulically driven fans for roof bolting machines to create cooling velocities for operators.

Management must understand the physiological issued that are created when heat is an issue.

Consider air refrigeration.

W&AWa gst a ff e & Asso c iat es

18

Risk Control (Cont)VENTILATION CONTROLS

Include, but are not limited to:

Auxiliary Fans

Dust Extractors

Regulators

Overcasts

Permanent & Temporary Stoppings.

Venturi’s

Brattice

Booster Fans – Small & Large

W&AWa gst a ff e & Asso c iat es

19

Risk Control (Cont)VENTILATION STRUCTURE INTEGRITY

Structures include Seals, Permanent & Temporary Stoppings and overcasts.

Structure integrity is critical for operations that mine seams with large gas reservoirs or have a propensity for Spontaneous Combustion.

Consider ‘Keying’ into ribs to ensure minimal leakage past structures.

Consider Grouting or P.U.R. injection of coal pillars to assist with structure integrity. Especially in areas of high differential pressure.

W&AWa gst a ff e & Asso c iat es

20

Risk Control (Cont)MINES DEPARTMENT GUIDELINES

1999 - Mineral Resources Released DRAFT version of MDG 1023 “Ventilation Control System Guideline” for comment.

Prepared by Dr. Roy Moreby – Associate Professor UNSW

No longer listed on the Department list of available guidelines.

A useful tool in developing a systematic approach to ventilation risk control.

MDG 1003 – Windblast Code of Practice

MDG 1006 – Spontaneous Combustion Management Code

W&AWa gst a ff e & Asso c iat es

21

Risk Control (Cont)VENTILATION MANAGEMENT PLANS

Need to be short and concise, but contain all the information a person will need to manage the individual risk/s.

The reasoning that went into the creation of the Management Plan needs to be documented , but doesn’t need to appear in the Management Plan itself.

Only work if people read and UNDERSTAND them.

Not just the Domain of the “Ventilation Officer”

W&AWa gst a ff e & Asso c iat es

22

Hierarchy of Error

INADEQUATE VENTILATION KNOWLEDGE

POOR VENTILATION MANAGEMENT

POOR / INADEQUATE VENTILATION

LOSS

HUMAN & FINANCIALW&AWa gst a ff e & Asso c iat es

23

ConclusionEnsure suitable knowledge base – No.1 Priority

Design and implement management plans that work.

Note: Good, effective management plans do not need reams of paper.

Allow time and resources to implement plans.

Train effectively & regularly.

Check that management plans work by regular auditing.

Choose auditors wisely and allow time and resources for those people to be effective.

EFFECTIVE MANAGEMENT PLANS WILL SAVE YOUR MINE MONEY

W&AWa gst a ff e & Asso c iat es