Transcript of 1. MIND MAP FINAL
MANAGEMENT GOAL SETTING
FACTORY PERFORMANCE
MACHINE CAPACITY
MAN POWER CAPACITY
JUST IN TIME PRODUCTION
RM STOCK AVAILABILITY
MACHINE UTILIZATION
ZERO DEAD STOCK
ZERO INVENTORY OF FG
ZERO EMPLOYEE INCIDENT
DEPT. PERFORMANCE
KPI (BALANCED SCORECARD)
PICA
KAIZEN (PDCA & SDCA)
COMPANYPERFORMANCE
HOW TO START
Define Business Process
Define Flow Process
Define Jobs Mapping
Manage / Define Report
Combining Data into Summary Report
DEFINE BUSINESS PROCESS
PPIC
- CAPACITY PLAN- MAN POWER PLAN- SUBMIT DESIGN
CUSTOMER
- EXISTING ORDER- NEW ORDER
LOGISTICS / WH
- RECONFIRM RM AVAILABILITY
- CHECK RM STOCK RATIO
PRODUCTION
- PRODUCE ITEMS BASED ON PROD. PLAN
- RECONFIRM MACHINE AVB.
PURCHASING
- VENDOR MANAGEMENT
- PO CONTROL
FIN & ACCT.
- AR & AP CONTROL- INTERNAL AUDIT
VENDOR
SUPPLY OF RAW MATERIAL
SPK RELEASE
PREPARE RM
PR RELEASE
DE
LIVE
RY
OR
DE
R
INV
OIC
E R
ELE
AS
E PAYM
EN
T INV
OIC
E
INV
OIC
E R
ELE
AS
E
PAYMENT INVOICE
PO
RE
LEA
SE
TECH. SUPPORT
- PRODUCT DESIGN- RECEIVE ORDER- REDESIGN
FINISH GOOD
DEFINE REPORTEVERY SINGLE REPORT HAS TO COMPLETED WITH THIS STEP
PDCA (PLAN – DO – CHECK – ACT)
SDCA (STANDARDIZATION – DO – CHECK – ACT)
•Learn Process
•Gemba
DEFINE
•Time Study•Trial & Error
MEASURE•Analyze the System
ANALYZE
•Develop• Improve
IMPROVE•PICA•SOP
CONTROL
Standard are created with the employees
Carrying out the standard (training, practice,etc)
Compare standard with current situation
Modify the standard based upon the result from checking the standard
DATA NECESSARY
PURPOSE :1. The Data of all items have been produced in the factory (should be similar with the Technical Support Data)2. The Duration will be estimating by Production’s Team3. To measure Factory Capacity per day (24 hours) – How much products will finish in 24 hours / day4. Will syncronize with the Planning Capacity (Timeline & Booking Capacity)
S A M P L E
MATRIX STD CAPACITY & UTILIZATION
HOUR MINUTE
TOTAL DURATION
(HOUR)
0
0
0
CATEGORY
3
1
2
DURATIONNO. ITEM CODE ITEM DESCRIPTION DIMENSION MACHINE ACTIVITY MAN POWER
TEMPLATE REPORT
REPORT RULES :1. Have to filled by Production Team per Shift and sent it to AdminTeam as a Daily Report2. The report should be submitted to the Admin no later than the end of the second shift3. Admin will inputting into the Database Template after receive the report
DAILY PRODUCTION REPORT
DATE :
MACHINE / ACTIVITY
:
PLAN ACTUAL START FINISH
1
2
3
4
5
CREATED BY : CHECKED BY :
(WORKER / OPERATOR / SPV PROD) (SPV PROD / MGR. PROD)
NO. PRODUCE ITEMS DIMENSIONMAN
POWERFINISH GOOD PROJECT NOTESQTY TIMES A M P L E
TEMPLATE REPORT
TEMPLATE RULES :1. Have to filled by the Admin Team after collect ing data from Prod. Team2. Information must be completed by Admin Team no later than one day after3. Admin must confirm to the production team if there is a differnces of data
DATA SUMMARYOCT'16
DATE PROCESS MACHINE / ACTIVITY ITEM DESCRIPTION FINISH GOOD ITEM DIMENSION MAN POWER PLAN ACTUAL START FINISH HOUR MINUTE NOTES
13-Oct-16 SEMI FINISH GOOD PEMBUATAN RANGKA SOFA
13-Oct-16 FINISH GOOD FINISHING SOFA
13-Oct-16 SEMI FINISH GOOD COLD PRESS 002
13-Oct-16 SEMI FINISH GOOD COLD PRESS 003
13-Oct-16 SEMI FINISH GOOD COLD PRESS 037
13-Oct-16 SEMI FINISH GOOD COLD PRESS 038
13-Oct-16 FINISH GOOD PACKING / PACKAGING
13-Oct-16 SEMI FINISH GOOD EDGE BENDING
13-Oct-16 SEMI FINISH GOOD HINGE BOR
13-Oct-16 SEMI FINISH GOOD PANEL SAW 1
13-Oct-16 SEMI FINISH GOOD PANEL SAW 2
13-Oct-16 SEMI FINISH GOOD PANEL SAW 3
13-Oct-16 SEMI FINISH GOOD SPINDLE MOULDER
13-Oct-16 SEMI FINISH GOOD CROSS CUT
13-Oct-16 SEMI FINISH GOOD RIP SAW
13-Oct-16 SEMI FINISH GOOD HAND JOINTER
13-Oct-16 FINISH GOOD ASSEMBLY 1
13-Oct-16 FINISH GOOD ASSEMBLY 2
13-Oct-16 FINISH GOOD ASSEMBLY 3
13-Oct-16 FINISH GOOD FINISHING OUTDOOR
13-Oct-16 FINISH GOOD FINISHING INDOOR
13-Oct-16 PLANNED DOWNTIME
13-Oct-16 MFG DOWNTIME
13-Oct-16 MACHINE BREAKDOWN
QTY TIME DURATION
S A M P L E
PROJECT CONTROL & MONITORING DASHBOARD
PURPOSE :1. Planning Capacity to estimate produce time2. To measure “When” the Factory is Idle and ready to booked by Customers and “How Long” they have to wait until they projects are done3. To Display the Progress of Project’s Achievement by Gantt Chart
PT GRACIA KARYA MASEHI 0Project Control & Monitoring First Day of Week (Mon=2): 2
[42]
WBS Project SPK NumberTaskLead Start End Du
ratio
n (D
ays)
% C
ompl
ete
Days
Com
plet
e
Days
Rem
aini
ng
1 Exxon Mobile QTY UNIT 200/EXM/FNT-SPK/SSP/0816 <NAME> 20-Sep-16 9-Oct-16 20 12% 2 18
1.1 Interior 20-Sep-16 9-Oct-16 20 13% 2 181.1.1 Wall Panel Veneer area Boardroom 1 Set 6-Oct-16 9-Oct-16 4 0% 0 41.1.2 Panel Finish AP-21 100 Lbr 20-Sep-16 22-Sep-16 3 20% 0 31.1.3 Portal Entrance 2 Unit 20-Sep-16 22-Sep-16 3 50% 1 21.1.4 Wall Panel Medium Conference Room 5 Set 20-Sep-16 22-Sep-16 3 0% 0 31.1.5 Wall Panel Meeting Room 2 Set 20-Sep-16 22-Sep-16 3 0% 0 31.2 Furniture 20-Sep-16 23-Sep-16 4 21% 0 41.2.1 Area Reception 3 Unit 20-Sep-16 23-Sep-16 4 0% 0 41.2.2 Agency 4 Unit 20-Sep-16 22-Sep-16 3 0% 0 31.2.3 Huddle Room 31 Unit 20-Sep-16 23-Sep-16 4 75% 3 11.2.4 Phone Room 1 Unit 20-Sep-16 22-Sep-16 3 0% 0 32 SKK Migas Lt. 37 203/SKK/FNT-SKK/SSP/0816 <NAME> 2-Sep-16 24-Sep-16 23 0% 0 232.1 Daun Pintu 14 Unit 2-Sep-16 15-Sep-16 14 0% 0 142.2 Skiriting 150 Btg 2-Sep-16 8-Sep-16 7 0% 0 72.3 Cornice 170 Btg 2-Sep-16 5-Sep-16 4 0% 0 42.4 Fiiling Cabinet 1 Unit 17-Sep-16 24-Sep-16 8 0% 0 8
06 -
Feb
- 17
21 -
Nov
- 16
28 -
Nov
- 16
02 -
Jan
- 17
09 -
Jan
- 17
16 -
Jan
- 17
23 -
Jan
- 17
30 -
Jan
- 17
27 -
Mar
- 17
13 -
Feb
- 17
20 -
Feb
- 17
27 -
Feb
- 17
06 -
Mar
- 17
13 -
Mar
- 17
20 -
Mar
- 17
05 -
Dec
- 16
12 -
Dec
- 16
19 -
Dec
- 16
26 -
Dec
- 16
10 -
Oct
- 16
17 -
Oct
- 16
24 -
Oct
- 16
31 -
Oct
- 16
07 -
Nov
- 16
14 -
Nov
- 16
03 -
Oct
- 16
08 -
Aug
- 16
15 -
Aug
- 16
22 -
Aug
- 16
29 -
Aug
- 16
05 -
Sep
- 16
12 -
Sep
- 16
19 -
Sep
- 16
26 -
Sep
- 16
S A M P L E