1 McHenry Lake Cook DuPage Kane Will Jose Rios, P.E. Engineer of Program Development HACIA...

23
1 McHenry Lake Cook DuPage Kane Will Jose Rios, P.E. Engineer of Program Development HACIA NETWORKING EVENT November 14, 2013 Illinois Department of Transportation Division of Highways – Region One

Transcript of 1 McHenry Lake Cook DuPage Kane Will Jose Rios, P.E. Engineer of Program Development HACIA...

1McHenry Lake

CookDuPage

Kane

Will

Jose Rios, P.E.Engineer of Program

Development

HACIA NETWORKING EVENT

November 14, 2013

Illinois Department of TransportationDivision of Highways – Region One

FY 2

000

FY 2

001

FY 2

002

FY 2

003

FY 2

004

FY 2

005

FY 2

006

FY 2

007

FY 2

008

FY 2

009

FY 2

010

FY 2

011

FY 2

012

FY 2

013

FY 2

0140

50

100

150

200

250

300

Dol

lars

(Mill

ion)

Engineering Funding Levels

FY 2

000

FY 2

001

FY 2

002

FY 2

003

FY 2

004

FY 2

005

FY 2

006

FY 2

007

FY 2

008

FY 2

009

FY 2

010

FY 2

011

FY 2

012

FY 2

013

FY 2

0140

20

40

60

80

100

120

Dol

lars

(mill

ion)

Engineering New Starts

Engineering Opportunities

The District’s anticipated FY 2014 Engineering

Program is $150 millionThis includes both ongoing and new engineering

And the new starts are…

Phase II Engineering

US 12• Rand Road at IL 59

I-290• Over Salt Creek

IL 47• Main Street south of Elburn

Various Traffic Signal DesignVarious Plan PreparationVarious SCAT DesignVarious Structures Plan Preparation

Various Project Studies • 5 Contracts

Phase I Engineering

• Circle Interchange• Illiana Corridor

Interstate Route 55 to Interstate Route 65

• Interstate Route 290 (Eisenhower Expressway)

Mannheim Road to Austin Avenue• Interstate 55 Managed Lane I-355 to I-90/94

Major Ongoing Studies

Circle Interchange

Individual contracts in FY 2014 and FY 2015 include…

• 60X27 West Harrison St. & Halsted St. Bridge (Watermain Procurement) Awarded 10/11/2013

• 60W25 Morgan St. over I-290 Awarded 8/22/2013• 60W26 Harrison St. over I-90/94(W) and Halsted St.• 60W29 Peoria St. over I-290 • 60W36 Tunnel Bulkheading and Watermain –Award 9/10/2013• 60W71 Harrison Street over I-90/94 (E) • 60W28 NW Flyover • 60W30 Taylor St over I-90/94 • 60W31 Congress Parkway/I-290 Bridges /Mainline I • 60W33 I-90/94 Mainline & Adams, Jackson/Van Buren• 60W32 Congress Parkway/I-290 Bridges /Mainline II

Additional contracts also being developed.

Circle Interchange

Total Project Cost = $420 million over 4 years

Halsted Street (looking south)

Circle Interchange

Peoria Street (looking south)

Circle Interchange

• B3 Corridor selected as preferred corridor• 47-mile access – controlled expressway

Illiana Corridor

Illiana Corridor Benefits

Economic Opportunity• $1.4 billion in construction related short-term opportunities, $4 billion in long-term opportunities

• CMAP estimates the project would increase the Gross Regional Product (GRP) by $425 million

• Provide a continuous high speed freight corridor between Illinois and Indiana

• $5 billion in travel time saving over 75 years

• Improve access to the proposed South Suburban Airport and to Gary-Chicago Regional Airport

• Improve accessibility to one of the largest intermodal freight areas in America

Illiana Corridor Project Milestones

Project Milestones• November 8, 2013: IDOT released Request for Qualifications (RFQ) for potential P3 concessionaire teams• December 4, 2013: IDOT/INDOT will host DBE and Industry Outreach Event•December 19, 2013: Deadline to respond to RFQ•Spring 2014: Publish Final EIS and receive Record of Decision (ROD) from the FHWA•Spring 2014: IDOT to release Request for Proposals (RFP)•Fall 2014: Award contract and begin negotiations•Fall 2015-2018: Project construction

DBE and Industry Outreach Event

December 4, 2013Holiday Inn Hotel and Conference Center411 South Larkin Avenue, Joliet, IL

•Learn more about Illiana Corridor project and current P3 schedule

•Learn about the IDOT DBE program and workforce training programs

•Network with potential project proposers

• IDOT partnering with CTA – Blue Line Vision Study

• Four Alternatives Carried Forward

•Additional Lane – Mannheim to Austin

•Improved Interchanges

•Potential Managed lanes and/or Tolling

•CTA Blue Line Extension to Mannheim (Bus or

Rail)

•Supporting Bus Service

•Study completion – Late 2014

Interstate Route 290 Project Schedule

Interstate Route 290

Harlem Ave

Austin Ave

Interstate Route 290

Interstate 55 Managed Lanes

Controls traffic movement • Number of vehicle occupants • Limit entry and exit points • Fixed or variable tollingImproves traffic flow through • Increased vehicle occupancies • Support of transit ridership

Managed LanesHigh Occupancy Vehicle (HOV)• Lanes dedicated to HOV• Bus access• Vehicle occupancy criteria

High Occupancy Toll (HOT) Lane• Separate tolled lane• HOV’s Ride for Free• Single occupancy vehicles (SOV)

pay tollExpress Toll Lane (ETL)• Separate tolled lane for all

passenger vehicles and buses• Fixed or Variable Pricing• HOVs may pay reduced tolls

Interstate 55 Managed Lanes

• Public Meeting held November 1, 2012•Document findings of environmental studies•Completion of study currently estimated by 2015

Interstate 55 Managed Lanes

PTB

Number ofItems for

District One

Number of Mentoring

Projects

160 6 2161 18 4162 18 8163 20 7164 10 3165 13 2166 8 1167168169

181322

556

Mentor Protégé Program

Thank you