1
Maximum Flow
ws
v
u
t
z
3/3
1/9
1/1
3/3
4/7
4/6
3/51/13/5
2/2
Maximum Flow
Flow Network
2
A flow network (or just network) N consists of A weighted digraph G with nonnegative integer edge weights, where the
weight of an edge e is called the capacity c(e) of e Two distinguished vertices, s and t of G, called the source and sink,
respectively, such that s has no incoming edges and t has no outgoing edges.
Example:
ws
v
u
t
z
3
9
1
3
7
6
515
2
Maximum Flow
Flow
3
A flow f for a network N is is an assignment of an integer value f(e) to each edge e that satisfies the following properties:Capacity Rule: For each edge e, 0 f (e) c(e)
Conservation Rule: For each vertex v s,t where E(v) and E(v) are the incoming and outgoing edges of v, resp.
The value of a flow f , denoted |f|, is the total flow from the source, which is the same as the total flow into the sink
Example:
)()(
)()(vEevEe
efef
ws
v
u
t
z
3/3
2/9
1/1
1/3
3/7
2/6
4/51/13/5
2/2Maximum Flow
Maximum Flow
4
A flow for a network N is said to be maximum if its value is the largest of all flows for N
The maximum flow problem consists of finding a maximum flow for a given network N
Applications Hydraulic systems Electrical circuits Traffic movements Freight transportation
ws
v
u
t
z
3/3
2/9
1/1
1/3
3/7
2/6
4/51/13/5
2/2
ws
v
u
t
z
3/3
2/9
1/1
3/3
3/7
4/6
4/51/13/5
2/2
Flow of value 8 = 2 + 3 + 3 = 1 + 3 + 4
Maximum flow of value 10 = 4 + 3 + 3 = 3 + 3 + 4Maximum Flow
Greedy may not work
5
If we just keep picking paths and adding them to the flow, we may make a mistake.
In this case, sending 2 units along s-v-w-t is a mistake
ws
v
u
t
z
3/6
1/1
2/2
0/3
5/5
2/2
5/51/15/5
4/4Flow of value 10 = 2 + 3 + 5 = 1 + 5 + 4
Maximum flow of value 12 = 2+5+5 = 2+0+5+1+4
ws
u
t
z
5/6
1/1
0/25/5
2/2
5/51/15/5
4/4
v 2/3
Maximum Flow
Cut
6
A cut of a network N with source s and sink t is a partition (Vs,Vt) of the vertices of N such that s Vs and t Vt Forward edge of cut : origin in Vs and
destination in Vt Backward edge of cut : origin in Vt and
destination in Vs
Flow f() across a cut : total flow of forward edges minus total flow of backward edges
Capacity c() of a cut : total capacity of forward edges
Example: c() 24 f() 8
ws
v
u
t
z
3
9
1
3
7
6
515
2
ws
v
u
t
z
3/3
2/9
1/1
1/3
3/7
2/6
4/51/13/5
2/2
Maximum Flow
Flow and Cut
7
Lemma:The flow f() across any cut is equal to the flow value |f|
Lemma:The flow f() across a cut is less than or equal to the capacity c() of the cut
Theorem:The value of any flow is less than or equal to the capacity of any cut, i.e., for any flow f and any cut , we have
|f| c()
ws
v
u
t
z
3/3
2/9
1/1
1/3
3/7
2/6
4/51/13/5
2/2
1 2
c(1) 12 6 3 1 2c(2) 21 3 7 9 2
|f| 8Maximum Flow
Augmenting Path
8
Consider a flow f for a network N
Let e be an edge from u to v: Residual capacity of e from u to
v: f(u, v) = c(e) f (e) Residual capacity of e from v to
u: f(v, u) = f (e) (we can go backwards along
edge) Let be a path from s to t
The residual capacity f() of is the smallest of the residual capacities of the edges of in the direction from s to t
A path from s to t is an augmenting path if f() 0
ws
v
u
t
z
3/3
2/9
1/1
1/3
2/7
2/6
4/50/12/5
2/2
f(s,u) 3f(u,w) 1f(w,v) 1f(v,t) 2f() 1
|f| 7Maximum Flow
Flow Augmentation
9
Lemma:Let be an augmenting path for flow f in network N. There exists a flow f for N of value
| f | = |f | f()
Proof: We compute flow f by modifying the flow on the edges of Forward edge:
f (e) = f(e) f()
Backward edge:f (e) = f(e)
f()
ws
v
u
t
z
3/3
2/9
1/1
1/3
2/7
2/6
4/50/12/5
2/2
f() = 1
ws
v
u
t
z
3/3
2/9
0/1
2/3
2/7
2/6
4/51/13/5
2/2
| f | = 7
| f | = 8Maximum Flow
Ford-Fulkerson’s Algorithm
10
Initially, f(e) 0 for each edge e
Repeatedly Search for an augmenting
path Augment by f() the flow
along the edges of A specialization of DFS (or
BFS) searches for an augmenting path An edge e is traversed
from u to v provided f(u, v) 0
Algorithm FordFulkersonMaxFlow(N)for all e G.edges()
setFlow(e, 0)while G has an augmenting path { compute residual capacity of } for all edges e { compute residual capacity of e }
if e is a forward edge of getCapacity(e) getFlow(e)
else { e is a backward edge } getFlow(e)
if <
{ augment flow along }for all edges e
if e is a forward edge of setFlow(e, getFlow(e) )
else { e is a backward edge }setFlow(e, getFlow(e) )
Maximum Flow
Example - Try a greedy algorithm, but be unlucky
11
ws
v
u
t
z
0/2
0/2
0/3
0/2
0/3
0/3
0/50/40/5
0/4
Example
12
ws
v
u
t
z
0/2
0/2
0/3
0/2
3/3
0/3
2/53/45/5
2/4
ws
v
u
t
z
2/2
2/2
0/3
2/2
3/3
2/3
4/53/45/5
2/4
ws
v
u
t
z
0/2
2/2
2/3
0/2
3/3
2/3
4/53/45/5
2/4
ws
v
u
t
z
0/2
0/2
0/3
0/2
3/3
0/3
0/53/43/5
0/4 No more forward flow
without pushing back
Example (cont)
13
ws
v
u
t
z
2/2
2/2
0/3
2/2
3/3
2/3
4/53/45/5
2/4
ws
v
u
t
z
2/2
2/2
2/3
2/2
3/3
3/3
5/52/45/5
3/4
Notice:This is clearly optimal, as the arcs into t (and leaving
s) are filled. If ANY cut is maxed out, we can’t do better.
Notice the effects of pushing backwards along an arc.We don’t REALLY require the flow goes forward and
then backward. It is like we could change our mind whilestill making progress.
Analysis
14
In the worst case, Ford-Fulkerson’s algorithm performs |f*| flow augmentations, where f* is a maximum flow
Example The augmenting paths found
alternate between 1 and 2
The algorithm performs 100 augmentations
Finding an augmenting path and augmenting the flow takes O(n m) time
The running time of Ford-Fulkerson’s algorithm is O(|f*|(n m))
ts
v
u
1/1
1/500/50
1/50 0/50
ts
v
u
0/1
1/501/50
1/50 1/50
1
2
Maximum Flow
Ford-Fulkerson Algorithm Details
15
Traversal can DFS or BFS, modify graph to include out-edges whose capacity is unused capacity and reversed flow edges who capacity is the flow they carry
Might only increase flow by 1 each timeO(|f*|m), pseudo-polynomial time (depends
on the magnitude of a parameter not its encoding size)
Maximum Flow
Edmonds-Karp Algorithm
16
Find the best augmenting paths, those with the fewest of edges. Greedy algorithm, like Prim’s.
Each time we choose a path, the number of edges along an augmenting path to any vertex can’t decrease.
But in turn, this implies that no edge can be a bottleneck (the smallest capacity) more than n times.
m edges can be a bottleneck n timesO(nm2)
Maximum Flow
Matchings
17
Kindergarten Teacher needs partners for a field trip
Maximum Flow
Maximum Bipartite Matching
18
Bipartite graphs – edges only between elements of two separate sets of vertices
Example:Jobs and Students. WorkAt edges link Students to Job. Can’t have edges from Students to Students.
Dancing, room scheduling (maximum number of classes simultaneously)
What if company has two jobs to fill?
Maximum Flow
Bipartite matching
19
In a bipartite match, all arcs go between
verticies of different sets. You want to
maximize the number of matches
Sometimes a bipartite matching problem is modeled as a network flow problem. Can you see how?
Maximum Flow
Maximum Bipartite Matching, solved by maximum flow
20
Direct edges, assign capacity 1Add source, sink, add edges to/from other nodes with
capacity m.Find maximal flow for maximal matchingConservation => no sharing of verticesUse regular FordFulkerson as flow is quite small.
O(f*m) but our F* is <n/2O(nm)
Maximum Flow
Maximum Bipartite Matching (transform into network flow) x: students y:jobs arc: “will work/will hire”
21 Maximum Flow
Maximum Bipartite Matching (transform into network flow) x: students y:jobs arc: “will work/will hire”
22 Maximum Flow
Minimum Cost flow(another version of network flow)
23
Add another “weight”, called cost, to edges to denote the cost to send a unit of flow along that leg.
Now, the cost of a flow is the sum of products of flow and costs on all edges
the cost of an augmenting path is the sum of forward edge costs minus the sum of backward costs
We want minimal cost for a given |f|An augmenting cycle for a flow has same |f| (since
it’s a cycle) but lower flow cost
Maximum Flow
Augmenting Cycles
24
Given an augmenting cycle, there is a new flow whose value is the same but whose cost is augmented by w(γ)fΔ(γ)
A flow is minimum cost there is no negative-cost augmenting cycle for it
Maximum Flow
Bellman-Ford Algorithm(recall from chapter 7)
25
A better idea is just to continually add the cheapest augmenting paths
Works even with negative-weight edges
Initially all nodes are Must assume directed edges
(for otherwise we would have negative-weight cycles)
Iteration i finds all shortest paths that use i edges.
Running time: O(nm).
Algorithm BellmanFord(G, s)for all v G.vertices()
if v ssetDistance(v, 0)
else setDistance(v, )
for i 1 to n-1 dofor each e =(u,z)
G.edges(){ relax edge e }r getDistance(u)
weight(e)if r getDistance(z)
setDistance(z,r)
Maximum Flow
26 Maximum Flow
Residual graphis shown on right
Find cheapest path
by looking at edge costs.
Send maximal flow along that
path