Transcript of 1 LITHUANIAN POWER SECTOR Dalius Šulga Director of Energy Development Department Lietuvos Energija...
1
LITHUANIAN POWER SECTOR
Dalius ŠulgaDirector of Energy Development Department
Lietuvos Energija AB
Vilnius, 2007
2LITHUANIA
• Population – 3.44 million;• Area – 65.3 thousand square km;• In the Middle Ages - the largest kingdom in Eastern
Europe (area – 930000 square km); • Lithuania lost the independence in the end of the
eighteen century;• Lithuania restored the independence in 1918;• The USSR occupied Lithuania in 1940;• Lithuania once again restored the Independence in
1990;• Lithuania became the member of the EU in 2004.
3
XIV c.
4
SOME DATES OF REFORMS
March, 1995. The Law on Energy adopted by the Parliament.
December, 1995. Lietuvos Energija AB was established.
1997. The first step of reorganization of Lietuvos Energija AB. The district heating and CHP were separated from Lietuvos Energija AB and transferred to municipalities.
2000. The beginning of the second step of reorganization of Lietuvos energija AB
December, 2001. Independent power companies were established. Restructuring of power sector was completed.
5
THE STRUCTURE OF ELECTRIC POWER SECTOR IN LITHUANIA
PRODUCTION3 production companies3 CHPs owned by district heating companies Few private mini HPP Few industrial power plantsWind park
DISTRIBUTIONTwo distribution companies (one private)
TRANSMISSON One Transmission System Operator company – Lietuvos Energija
AB
6
3,4% 96,6%
State-owned shares
Other shareholders
Assets 2 698 million LTLAuthorized capital 690 million LTLNumber of employees 1142
THE MAIN GOAL - TO ENSURE A RELIABLE OPERATION OF THE POWER SYSTEM AND TO INTEGRATE LITHUANIAN ELECTRICITY MARKET INTO THE MARKETS OF WEST EUROPE AND NORDIC COUNTRIES
STRUCTURE OF SHARE CAPITAL
LIETUVOS ENERGIJA AB
7
THE MAIN FUNCTIONS OF LIETUVOS ENERGIJA AB
MAINTENANCE AND DEVELOPMENT OF TRANSMISSION GRID • Charge of high voltage (330-110 kV) transmission lines and substations• Ensures a reliable and efficient electricity transmission from Lithuanian power plants to electric utilities and large customers.
DISPATCH CONTROL• Coordinates the operation of Lithuanian power plants and neighbouring energy systems.• Creates non-discriminatory conditions for all users of transmission grid. • Ensures balance of electricity generation and consumption and reliability of electricity system.
ORGANIZES ELECTRICITY TRADE• Coordinates electricity export and import • Settles payments among Lithuanian and foreign electricity generators and suppliers.
8
K la ip ė d a D iv ision
Š ia u lia i D iv ision
U te n a D iv ision
V iln iu s D iv is io n
K a u n a sD iv is io n
TRANSMISSION GRID 110/330 kV power lines 330 kV transformer substations and switchgears 110 kV voltage switchgear
TECHNICAL CHARACTERISTICS OF TRANSMISSION GRID
110 kV 330 kV Length of overhead lines, km 4970 1670 Length of cable lines, km 21 Transformer 6 21Switch - gears 213 12Transformer substations 11Capacity of transformer substations, MVA 93 3450
LITHUANIAN TRANSMISSION GRID
9
BALANCES OF ELECTRICITY PRODUCTION IN LITHUANIA, TWh
3,493,223,041,571,241,85Commerce and other
0,160,150,160,230,522,7Agriculture
0,020,020,020,070,070,21Transport
2,392,182,151,771,491,76Residential
3,133,243,083,273,476,22Industry
9,198,818,456,916,812,74
Final consumption:
1,151,291,341,352,451,55Losses and Auxiliary Servicy of the networks
10,3410,109,798,269,2514,29
Domestic consumption
0,432,967,321,482,8912,39
Export
0,590,540,750,450,54-Energy for loading Kruonis PSP
11,3613,617,7310,0412,4626,27
Electricity output
1,091,171,541,371,422,11Auxiliary servicy of Power Plants
0,851,231,320,730,780,53Rest Power Plants
1,962,132,111,550,733,01CHP
0,991,070,740,710,557,81Lithuania PP
8,6510,3415,18,4211,8217,03
Ignalina NPP
12,4514,7719,2711,4113,8828,38
Gross electricity production:
2006 20052004 20001995 1990
10
ELECTRICITY PRODUCTION IN LITHUANIA
334
949
2859
15101
2004
181
992
2804
15484
2003
13
744
2630
14142
2002
802823Hydro
409
3202
10338
2005 2006
8651Nuclear
2597Thermal
402Other
11
BALTIC ENERGY STRATEGY
• Prepared Baltic energy strategy is published for public opinion;
• Main targets:– integration of power systems and gas systems into EU
energy systems and markets;– diversification of primary energy sources and supplies;– increase the energy efficiency at the demand side and in
the energy transformation sector;– develop the transit routes for energy products, including
electricity;– strengthen education, research and development in the
energy sector;– elaboration and implementation of common policy on
energy imports from non-EU countries;– integration of the Baltic power systems into markets of
Central Europe and Nordic countries;– to apply a request to UCTE President for conditions and
terms of synchronous interconnection of the Baltic States power systems with UCTE;
– renew the large power production capacities;– to use possibilities and benefits from development of
distributed electricity generation;– increase the share of renewable energy sources in the
electricity mix
12
LITHUANIAN ENERGY STRATEGY
• Lithuanian national energy strategy approved by Parliament (Seimas) in 2007-01-27;
• Integration of power system and gas system into EU systems and markets;
• Diversity of primary resources, increase use of local resources, to limit use of gas for electricity production up to 30% of yearly fuel balance;
• Ensure the continuity and development of safe nuclear energy; to put into the operation of a new regional nuclear power plant not later than by 2015;
• Renovate power plants, power and natural gas transmission and distribution systems as well as we district heating systems increasing their efficiency and reliability;
• Not later than by 2012, to connect Lithuania’s high voltage electricity networks with the networks of Scandinavian countries and Poland;
• Further develop regional cooperation;• Construct a natural gas storage facility in Lithuania, develop a
common regional natural gas storage facility, construct, a common liquefied gas import terminal in the Baltic region;
• Increase the share of renewable energy resources in the national balance of primary energy at least up to 20% by 2025;
13
INSTALLED GENERATING CAPACITIES AND FORECAST IN LITHUANIA
275023701880Daily demand
103010090030
103010090030
102010090020
Hydro:Kaunas HPPKruonis PSPPSmall scale HPP totally
250024003640Total without hydro and wind
Gas, HFO, orimulsionGas, HFOGas, HFO
HFO
nuclear
Fuel
2100
4690
403010
23301500
380180160110
1300
2006
MW
20152010
--Nuclear: Ignalina
24601500
370170160260
23801500
370170160180
Thermal:Elektrėnai (condensing)
Vilnius CHPKaunas CHPMažeikiai CHPOthers
34030040
22020020
Other renewables:WindOthers
38303630Total generation
29002450Peak demand
14THE CLOSURE OF THE IGNALINA NPP
• Unit I was shut down in December 2004 • The closure of Unit II is scheduled in 2009
• The Ignalina NPP can be substituted by the Lithuanian PP, but this power plant has to be upgraded to meet environment requirements
15
• On 26th January 2006, during an energy conference in Vilnius, government officials from three Baltic countries agreed to commission a feasibility study for a new nuclear power plant in the region.
• On 27th February 2006, the Prime Ministers of Lithuania, Latvia and Estonia issued a communiqué expressing their approval of construction of a new nuclear plant in the region and inviting the national energy companies to invest in the Project.
• The memorandum of understanding about conducting the feasibility study on the building of a new nuclear plant was signed by the heads of Lietuvos Energija, Latvenergo and Eesti Energia on 8th March 2006.
NEW NUCLEAR PP
16ELECTRICITY GENERATION COSTS, WITH EMISSION TRADING
14,9
5,19,3 10,2 12,0
35,58,0
4,0
7,5 7,08,5
10,0
3,035,9 17,6
30,8
7,0
51,2
45,5
18,8
19,116,2
35,3
27,730,5
42,5
25,9
55,050,652,0
0
10
20
30
40
50
60
Elspot2003
Elspot2004
Elspot2005
Forward2008
Nuclear Gas Coal Peat Wood Wind
€/M
Wh
Emission trade20 €/t CO2Fuel costs
O&M costs
Capital costs
Wood and wind without subsidies
Operating hours 2200 hours/year
R.Tarjanne 17.06.2006
Operating hours 8000 hours/yearReal interest rate 5,0%
May 2006 prices
17GENERATION ADEQUACY OF LITHUANIAN
POWER SYSTEM 2007-2025
-1500
-1000
-500
0
500
1000
1500
2007
2009
2011
2013
2015
2017
2019
2021
2023
2025
MW
ARM RC A RC B RC C
BALTIC REGIONAL ENERGY FORUMJune 11 - 13, 2007
18
BALTICS HIGHEST PRIORITY PROJECTS
•Lithuania – Poland interconnection (LITPOL LINK)
•Estonia – Finland interconnection (ESTLINK 2)
•Baltic's – Sweden (Sweden – Lithuania SWEDLIT or Latvia – Sweden)
•Estonia – Latvia interconnection (Sindi – Riga)
MAIN OBJECTIVES AND BENEFITS• Integration of the Baltic power systems into the EU IEM• Ensuring security of supply in the Baltic region• Market development
• Efficient use of power resources
to Sweden
19
The main conclusion of the Feasibility Study – It would be feasible to develop a new nuclear power plant to replace Ignalina NPP
• Lietuvos energija, Latvenergo and Eesti Energia undertaking jointly to build a new nuclear power plant appears feasible from a technical, electrical system, financial and legal perspective
• Likely cost advantage of nuclear reactor over alternative sources of new generation
• On the basis of geological investigations (GI), space at the Ignalina NPP site is available to accommodate at the new nuclear reactor units to 1600 MW
• Availability of suitable reactors designs
• The nuclear fuel market is effectively a global market
• The current electrical system is capable of accommodating up 3000 MW of nuclear capacity.
FEASIBILITY STUDY
20
PLANNED DEVELOPMENT OF BALTIC POWER SYSTEMS
21
PLANNED 2007-2025 CAPACITY BLANCES IN MINIMUM LOAD INCREASE SCENARIO
-1000
-800
-600
-400
-200
0
200
400
600
800
1000
1200
1400
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Metai
MW
Likutinė galia "A" scenarijuje
Likutinė galia "B" scenarijuje
Likutinė galia "C" scenarijuje
22
PLANNED 2007-2025 CAPACITY BLANCES IN MOST PROBABLE LOAD INCREASE SCENARIO
-1400
-1200
-1000
-800
-600
-400
-200
0
200
400
600
800
1000
1200
1400
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Metai
MW
Likutinė galia "A" scenarijuje
Likutinė galia "B" scenarijuje
Likutinė galia "C" scenarijuje
23
PLANNED 2007-2025 CAPACITY BLANCES IN FAST LOAD INCREASE SCENARIO
-2000
-1800
-1600
-1400
-1200
-1000
-800
-600
-400
-200
0
200
400
600
800
1000
1200
1400
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Metai
MW
Likutinė galia "A" scenarijuje
Likutinė galia "B" scenarijuje
Likutinė galia "C" scenarijuje
24
BALANCE OF CAPACITY IN BALTIC STATES
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
MW
Load Reliably available capacity
2500 MW
4170 MW
430 MW
25
0
1000
2000
3000
4000
5000
6000
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025year
MW
Load Reliably available capacity (11=6-(7+8+9+10))
BALTIC POWER SYSTEM BALANCE IN SUMMER (ETSO)
26
LITHUANIAN ENERGY STRATEGY (2)
• Increase the share of the electricity generated by combined heat and power plants during the heating period in the national balance of electricity generation up to 35% in 2025;
• Improve the efficiency of consumption of all types of energy ;• Ensure the practical independence of the National Control
Commission for Prices and Energy and its responsibility for the decisions taken;
• Ensure that the management scheme and operators of new energy infrastructure facilities comply with EU competition criteria and that these operators act as neutral market participants; to seek their free and unhindered access to EU energy networks;
• Application of the Baltic States to the Western European Union for the Co-ordination of Transmission of Electricity (UCTE) for the issuance of technical specifications for synchronous interconnection of the Baltic power system with UCTE zone and creation of required technical, legal and organisational preconditions, while maintaining physical interconnections for energy exchanges with the Russian power system;
• Agreement of regulation of the Baltic States electricity market with regulation of the Scandinavian electricity market.
27
LATVIA
BELARUS
RUSSIA
POLAND
Šiauliai Panevėžys
Kaunas
Vilnius Lietuvos E
Alytus
Klaipėda Utena
Ignalinos AE
Jonava Jurbarkas
Sovietskas„Neris”
Telšiai
Grobinia Viskali Plavinu HPP
Daugavpils
Molodečnas
Gardinas
Ełk
Polockas
Smorgonys
Belorusskaja
Kruonio HAE
330 kV substations
Existing power plants
Existing 750 kV transmission lines
Existing 330 kV transmission lines
Planned 330 kV substations
400 kV
330 kV
Mūša
B2B
Planned 330 kV transmission lines
DEVELOPMENT OF LITHUANIAN POWER SYSTEM
28
NEW INTERCONNECTIONS
EXPECTED FUTURE INTERCONNECTIONSEstonia – FinlandSweden – LithuaniaPoland – Lithuania
MAIN OBJECTIVES AND BENEFITSIntegration of the Baltic power systems into the EU IEMEnsuring security of supply in the Baltic region
29
EXPECTED INTERCONNECTIONS OFBALTIC TRANSMISSION GRID
Krievija
Ukraina
Baltkrievija
Polija
Čehija
Vācija
Lietuva
Latvija
Igaunija
Somija
Norvēģija
Dānija
Zviedrija
NORDEL
UCTI/CENTRAL
Russia
Ukraine
Belorus
Poland
Czech
Germany
Lithuania
Latvia
Estonia
Finland
Norway
Dānija
Sweden
Integrated Balticand CIS energy
system
NORDEL
UCTE/CENTRAL Europe
Švedija – Lietuva
SWEDLIT700 MW
Lietuva – LenkijaLITPOL LINK
1000 MW
ESTLINK 350 MWESTLINK 2 – 600
MW
30
LITHUANIA – POLAND INTERCONNECTION
Planned 330 kV and 400 kV lines
BELARUS
POLAND
LITHUANIA Kaunas
Lietuvos E
ALYTUS
Gardinas EŁK
Kruonis HPSPP
Existing 330 or 400 kV substationExisting power plant Existing 330 or 400 kV line
NAREW
MĄTKI
RUSSIA
MILOSNA
PŁOCK
GRUDZIĄDZ
GDAŃSK BLONIA B2B
Olsztyn
OSTROLĘKA
Existing 220 kV line
105,6 km
48 km
53 km
31
PRESENT STATUS OF LITHUANIA – POLAND INTERCONNECTION
• Capacity – 1000 MW;
• Investments – 257,4 mln. €;
• Completion of the interconnection is planned in 2012-2015;
• Interconnection is planned via Back-to-Back converter station (2x500 MW);
• Lithuanian side and Polish side plan to start the implementation of the Project by establishing a project implementation company;
• Shareholders agreement is being prepared.
32
LITHUANIA – SWEDEN INTERCONNECTION
33
INTERCONNECTION LITHUANIA – SWEDEN
• Completed Pre-feasibility Study;
• Capacity ~700 MW;• Investments – about 400 million €;
• LE and Svenska Kraftnat perform Feasibility study;
• Consulting company – SWECO International
• Feasibility study will provide detailed technical and economic analysis of the Interconnection;
• Feasibility study is scheduled to be completed in November, 2007.
34
PRODUCTION OF ELECTRICITY FROM
RENEWABLES, MLN. KWH
8.19%4.36%From renewables
122109790Consumption
1000426.5Total:
1304.3Biomass PP
3801.2Wind PP
12562Small HE
365359Kauno HE
2010 m.2004 m.
35MAXIMUM INSTALLED CAPACITY OF
WIND POWER PLANTS
Maximum of installed capacity of wind power plants in Lithuania in 2010 (according to produced energy):
P = 380 GWh/1900h = ~200 MW
Maximum of installed capacity of wind power plants in Lithuania in 2010 (according to system demand): P = 622 x 1,3 x 0,2 = ~160 MW
where: 622 – 2004 m. minimum load, MW
1,3 – demand increase up to 2010 m.
0.2 – part of capacity, not which not require additional costs for regulation
36
DEVELOPMENT OF WIND PP BY ZONES
Transmission network20 6
110 kV overhead line Klaipėda–Rietavas
355
110 kV overhead line Šventoji–Židikai
30 4
110 kV overhead line Klaipėda–Palanga–Šventoji
453
110 kV overhead line Klaipėda–Pagėgiai, Juknaičių substation
402
Distribution network30 1
Location of zoneTotal capacity in
zone (MW)Zone
37
LOCATION OF ZONES
Zone 4 – 30 MW
Zone 3 – 45 MW
Zone 5 – 35 MW
Zone 2 – 40 MW
Wind connection zones:
Zone 1 – 30 MW any place in 10-35 kV network
Zone 2 – 40 MW
Zone 3 – 45 MW
Zone 4 – 30 MW
Zone 5 – 35 MW
Zone 6 – 20 MW, any place in 110 kV, except 110 kV lines in Zones 2-5
38
PLANNED PRODUCTION FROM WIND POWER PLANTS
2009
2008
2007
2006
2005
2004
3040505030MWInstalled capacity of planned to construct new wind power plant
17313282310,850,85MWForeseen capacity of wind PP in the beginning of the year
320,4
259,6
18296,227,41,4GWhProduction of electricity
39
IMPACT OF WIND PP TO ELECTRICITY PRICE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
50 100 150 200 250 300 350 400
Vėjo elektrinių įrengta galia
ct/k
Wh
Tmax=1500 val, supirkimo kaina 22 ct/kWh Tmax=2000 val, supirkimo kaina 22 ct/kWh
40
ETSO VIEW TO INTEGRATION OF WIND PP
• Necessary to speed-up construction of network infrastructure;
• Participation of wind PP in ensuring stability of power system, voltage control during short circuits and etc.;
• Ensuring balance and frequency control of the power system;
• Support of studies for integration of renewables into power system;
• Promote secure planning by limiting total capacity of renewables;
• Evaluate impact to international power flows.
41
PROBLEMS
• Big impact to power system balance control;• Additional costs for power system control, balancing;• Limitation of total installed capacity of wind PP;• Difficulties with land ownership, rent, preparation of
detail plan, environment impact assessment, unfriendly view of neighbours (not in my backyard);
• Impact to electricity price;• Renewables reduce part of market, limits competition;• Big pressure from companies which wants to construct
wind power plants.
42
FUTURE DEVELOPMENT OF WIND PP
• Take into account policy of EU on development of renewables;
• In 2010 – 200 MW of installed capacity of wind PP;• Most probable future development of wind power
plants after 2010. How much? 50-100-200-400MW?• Off-shore wind power plant 200-300 MW;• Study for development of off-shore wind PP up to 1000
-1500 MW.• Future development of wind PP limit not stable
production from this type of production, network possibilities, necessity to have power transfer reserve in transmission grid, impact to power system balance;
• Development of other renewables (biomass PP, etc.).
43
-5,0
0,0
5,0
10,0
15,0
20,0
25,0
30,0
35,0
2007
.06.
2820
07.0
6.28
02:3
2:00
2007
.06.
28 0
5:04:
00
2007
.06.
28 0
7:36:
00
2007
.06.
28 1
0:08:
00
2007
.06.
28 1
2:40:
0020
07.0
6.28
15:1
2:00
2007
.06.
28 1
7:44:
00
2007
.06.
28 2
0:16:
00
2007
.06.
28 2
2:48:
0020
07.0
6.29
01:2
0:00
2007
.06.
29 0
3:52:
00
2007
.06.
29 0
6:24:
00
2007
.06.
29 0
8:56:
00
2007
.06.
29 1
1:28:
0020
07.0
6.29
14:0
0:00
2007
.06.
29 1
6:32:
00
2007
.06.
29 1
9:04:
00
2007
.06.
29 2
1:36:
0020
07.0
6.30
00:0
8:00
2007
.06.
30 0
2:40:
00
2007
.06.
30 0
5:12:
00
2007
.06.
30 0
7:44:
00
2007
.06.
30 1
0:16:
0020
07.0
6.30
12:4
8:00
2007
.06.
30 1
5:20:
00
2007
.06.
30 1
7:52:
00
2007
.06.
30 2
0:24:
0020
07.0
6.30
22:5
6:00
2007
.07.
01 0
1:28:
00
2007
.07.
01 0
4:00:
00
2007
.07.
01 0
6:32:
00
2007
.07.
01 0
9:04:
0020
07.0
7.01
11:3
6:00
2007
.07.
01 1
4:08:
00
2007
.07.
01 1
6:40:
00
2007
.07.
01 1
9:12:
0020
07.0
7.01
21:4
4:00
Vėjas-I
Benaičiai
ACTUAL GENERATION FROM WIND PP
44
Dr. Dalius ŠulgaDirector of Energy Development Department
Lietuvos Energija ABZveju str. 14, LT -09310, Vilnius
Lithuania