Leni Gas and Oil plcInvestor UpdateNeil Ritson

14 August 2014

London (AIM): LGO

Page 2: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

2

Company Profile

Trinidad

Spain

London HQ

London Stock Exchange - listed March 2007Producing Oilfields - Trinidad and Spain

Staff - 50 (All local)Net Production Capacity - 600 bopd 2P Reserves - 7.6 mmbblsMarket Cap - approx. £90 million

Page 3: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

3

London Management and Board of Directors

Chairman David LenigasHolds a Bachelor of Applied Science in Mining Engineering and has 30 years of resources industry experience. Until recently he was the Executive Chairman of Lonrho plc. David is also the Executive Chairman of Stellar Resources plc, Solo Oil plc, Rare Earth Minerals plc and AfriAg plc.

Chief ExecutiveOfficer

Neil RitsonHas a BSc in Geophysics. He has worked in the energy sector for over 35 years, initially with BP plc for 23 years before managing the international operations of Burlington Resources Inc. and more recently as CEO at Regal Petroleum plc, before founding the Vanguard Energy Group where he was Chairman and CEO. He is a Director of Solo Oil plc and a Non-Executive at Enovation Resources Ltd.

Chief Operating Officer

Fergus JenkinsIs a Chartered Engineer with a BEng in Mining Engineering and a MEng in Petroleum Engineering. He has over 20 years of experience working in industry, initially in mining before moving to petroleum, where he has worked for most of his career in mid-sized independent oil companies, including Enterprise Oil, LASMO, OMV (UK) Ltd and Afren plc.

Finance Director James ThadchanamoorthyHas a degree in Chemistry and is a qualified accountant. He has 18 years’ experience, including over 10 years spent at BP where he held a number of commercial and finance leadership positions.

Non-ExecutiveDirector

Steve HortonHolds a BSc in Mining Engineering and an MBA. He has 35 years experience working in the energy industry including 27 years with BP plc where he held executive roles including worldwide Director of Drilling. He co-founded Silverstone Energy Limited in 2005. Steve is a Non-executive Director of Seamwell Limited and, until the recent merger, of Valiant Petroleum plc.

Page 4: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

4TRINIDAD

Page 5: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

5

Current Trinidad Assets

Over 7,500 acres of largely unexplored 100% owned private oil leases in the Cedros and adjacent rights held in partnership with Beach Oilfield Limited

Trinidad Head Office, San Fernando

Goudron IPSC (100%) with 2P reserves of 7.2 mmbbls and over 60 mmbbls of contingent resources associated with a future water flood

Icacos Field in the Cedros Peninsula (50%, non-operator), producing ~35 bopd from three wells

HOA to acquire the Trinity-Inness IPSC from Rex Caribbean

Page 6: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

6

Goudron Phase 1

Goudron well GY-257 Reactivated 2012

Page 7: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

7

• Spudded first well, GY-664, on 28 April

• Completed well GY-664 on 30 May in 278 feet of Gros Morne

• GY-665, TD on 8 June• GY-666, TD on 1 July• GY-667, TD on 30 July

• All wells are expected to be Gros Morne production wells

• Spudded GY-668 on 9 August drilling ahead in Goudron Sandstone

Goudron Phase 2 - Drilling Results to date

Rig 20 on GY-665, 7 June 2014

Page 8: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

8

Well GY-664

• First new well on the field for over 32 years

• Drilled from the central camp area

• Found 571 feet of net oil pay within 3 reservoirs

• Completed over an interval of 278 feet of Gros Morne

• Initial flow rate 240 bopd 37 API oil through a 7/32” choke at a flowing pressure of 660 psi

• Choked back to 6/32” pressure stable at 540 psi

Page 9: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

9

Production of 240 bopd through a 7/32-inch choke

Constrained production rate

Page 10: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

10

Excellent log characteristics

‘130 foot’ Gros Morne sandstone in GY-667

Page 11: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

11

Structure – Top Gros Morne

Pad 1

Pad 2

Page 12: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

12

Drilling Pad 3

Well 6

Well 7

Well 8

Well 9

605

386

156290

257

294

286

154

152

153

• Third new drill site currently under construction

• Expect to drill 4 wells

• Provisionally 1 Goudron only, 2 Goudron/Gros Morne wells and 1 well to the Lower Cruse

• Continue to use Well Services Rig 20

• First well will spud after GY-668

• Wells GY-665 to 668 will be placed on production

Page 13: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

13

Trinity-Inness

Page 14: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

Trinity-Inness Asset Summary

14

Installing new well tanks• Petrotrin IPSC field 20 km from Goudron

• Current production 140-150 bopd from approx. 25 active wells

• Herrera Sandstone at depth of 1,500 – 5,000 feet

• Five tank batteries and a 1,500 barrel sales tank

• Average 28-38 degree API oil exported directly by pipeline to Pointe-a-Pierre

• Approx. 20-30 immediate reactivation targets, and an existing CEC for 12 new wells Trinity-Inness sales tank facility

Page 15: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

15

Cedros Peninsula

Page 16: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

LGO Cedros Lease Position

16

Installing new well tanks

Beach Oilfield Cedros Leases

Icacos Leases

TED 3D Seismic

Bonasse Field

Icacos Field

LGO Cedros Leases

Galpha Point

FRM-1 Deep Well

Page 17: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

Plans for the Cedros

17

Installing new well tanks• In collaboration with Beach Oilfield and Dr Krishna Persad; re-evaluate all existing data and wells

• Acquired a soil geochemistry survey to isolate micro-seepage and areas of fractionated light oil

• Plan to fly a high resolution gravity and magnetics survey

• Acquire additional 2D seismic data if necessary to define well locations

• Drill at least one deep exploration well to test the potential at Herrera Sandstone level

Galpha Point Mud Volcano

Page 18: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

18

SPAINAyoluengo Field, Cantabrian National Park, Spain

Page 19: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

19

Future Potential

• Enhance production through the side-tracking of existing wells

• Development of Hontomin as a low cost satellite using existing 3D seismic and re-entry of existing wells

• Development of Tozo as either a micro-Compressed Natural Gas or Gas-to-Wire project

• Deepen Ayoluengo to the proven Liassic reservoirs

• Sub-lease the unconventional gas exploration potential

Page 20: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

20

Financials

Page 21: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

21

Revenue: 2010 to 2014E

• Portfolio has been repositioned to focus on growth• Acceleration of the development of Trinidad• Spain will be optimised until the extension is confirmed

2010 2011 2012 2013 0 20140

2

4

6

8

10

12

£2.3m

£3.4m £3.35m

£5.9m

TotalTrinidad (new production)Trinidad (current wells)Spain Goudron

production coming on line in Q3 2014

Current Production

Page 22: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

22

Gross Profit: 2010 to 2014E

• In 2013 Gross Profit was broadly flat • Higher Trinidad volumes were partially offset by lower sales in Spain• Gross Profit will rise in 2014 in line with significant growth in volumes

2010 2011 2012 2013 0 2014-0.25

0.25

0.75

1.25

1.75

2.25

2.75

3.25

£0.5m

£1.06m £1.09m £1.12m

TotalTrinidad (new production)Trinidad (current wells)Spain

Goudron production coming on line in Q3 2014

Current Production

Page 23: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

23

Share Price Performance

Page 24: 1 Leni Gas and Oil plc Investor Update Neil Ritson 14 August 2014 London (AIM): LGO.

Forward Looking Statements

24

Certain statements in this presentation are “forward looking statements” which are not based on historical facts but rather on the management’s expectations regarding the Company's future growth. These expectations include the results of operations, performance, future capital, other expenditures (amount, nature and sources of funding thereof), competitive advantages, planned exploration and development drilling activity including the results of such drilling activity, business prospects and opportunities. Such statements reflect management's current beliefs and assumptions and are based on information currently available.Forward looking statements involve significant known risks, unknown risks and uncertainties. A number of factors could cause the actual results to differ materially from the results denoted in these statements, including risks associated with vulnerability to general economic market and business conditions, competition, environmental and other regulatory changes, the results of exploration, development drilling and related activities, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although these statements are based upon what management believes to be reasonable assumptions, the Company cannot assure investors that the actual results will be consistent with these forward looking statements.