KING FAHD UNIVERSITYCIVIL ENGINEERING DEPARTMENT
A New Prefab Panel As a flooring slab
Web Grid Core Panel
ABDUL FATTAH DARWISH
![Page 2: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/2.jpg)
2
Subjects
The Problem ? Panel Description Structural Study Economical Study Comparison conclusion
![Page 3: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/3.jpg)
3
Problems ? High Dead Loads in buildings ?
D/L ≥ 2 In ordinary buildings D/L = 1 In Hollow Core Slab ?
Construction Cost & Time Slab Cost @70% of Skelton Slab Time @ 75% of Skelton Time
Earthquake Disasters Mass & Height
Environmental Impacts of Concrete Roads & Crushing Plants Problems
Energy Loss
Crushing Plants,Transportation & Construction
![Page 4: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/4.jpg)
4
Panel Description
Components Web Grid Core Cladding Plats Filling Material Connecting Devices
![Page 5: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/5.jpg)
5
Panel Description
Strength Points Very Light : 10% of concrete Weight Very strong : 50 cm for 20x20 m Could be one or two way slab action Reduce @ 50% of Building Weight Reduce @20% of skeleton cost Reduce construction time Reusable,Removable and adjustable Easy to transport & install
![Page 6: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/6.jpg)
6
Panel Description
Improving points Water Proofing Fire & Heat Resistance Electric Conductivity Sound Resistance Connecting Devices
![Page 7: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/7.jpg)
7
Data Dimensions are: 6 x 6 x 0.20 meter Pinned supports all around All elements are 1.5 mm thick. Total load is 300 kg/m2
Results Max. stress is 0.15 t/cm2 Max Deflection 1.0 mm
Structural Study
![Page 8: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/8.jpg)
8
Stress isometric
![Page 9: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/9.jpg)
9
Top Plate Stress 0.15 t/cm2
![Page 10: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/10.jpg)
10
Bottom Plate Stress 0.13 t/cm2
![Page 11: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/11.jpg)
11
Central Rib Stress 0.13 t/cm2
Deflection is 1mm
![Page 12: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/12.jpg)
12
Data: 10 floors building Floor area 12X12 m Current prices for ribbed slab Result: 20 % Reduction in skeleton cost
if we use the new panel
Economical study
![Page 13: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/13.jpg)
13
Comparison against:
Solid Slab Ribbed Slab Hollow Core Slab Siporex
![Page 14: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/14.jpg)
14
Deflection
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
Solid slab Ribbed Hollowcore Siporx WGCP
![Page 15: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/15.jpg)
15
Density (t/m3)
0
0.5
1
1.5
2
2.5
Solid slab Ribbed Hollowcore Siporx WGCP
![Page 16: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/16.jpg)
16
Cost (SR/m3)
0
200
400
600
800
1000
1200
Solid slab Ribbed HollowCore
Siporx WGCP
![Page 17: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/17.jpg)
17
Installing Time (day)
0
2
4
6
8
10
12
14
16
Solid Ribbed H.core Siporx WGCP
![Page 18: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/18.jpg)
18
Manufacturing Time (weeks)
0
1
2
3
4
5
6
7
8
Hollow core Siporx WGCP
![Page 19: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/19.jpg)
19
Achievements
Load Reduction (> 50%) Cost Reduction (>20%) Saving Victims in earthquakes Environmental Benefits Energy Savings
![Page 20: 1 KING FAHD UNIVERSITY CIVIL ENGINEERING DEPARTMENT A New Prefab Panel As a flooring slab Web Grid Core Panel ABDUL FATTAH DARWISH.](https://reader035.fdocuments.us/reader035/viewer/2022070400/56649ef65503460f94c0a9bc/html5/thumbnails/20.jpg)
20
Conclusion It has strength points It has improving points A Feasibility study should be done
to ensure : Performance Manufacturing Use & Cost