1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA...

6
1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA Email: [email protected] Phone: 301-415-6587

Transcript of 1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA...

Page 1: 1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA Email: AXS7@NRC.GOVAXS7@NRC.GOV Phone: 301-415-6587.

1

IMPRINT Developer’s Workshop:NRC’s Perspective

December 6 -7, 2005

By: Autumn Szabo, CEA

Email: [email protected]

Phone: 301-415-6587

Page 2: 1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA Email: AXS7@NRC.GOVAXS7@NRC.GOV Phone: 301-415-6587.

2

The NRC

Organization Mission

Different from military applicationsSimilar HF needs / research

Page 3: 1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA Email: AXS7@NRC.GOVAXS7@NRC.GOV Phone: 301-415-6587.

3

NRC Activities

Study / validation (1990s)StaffingAlarm systemsRemote Afterloading Brachytherapy

EvaluationStaffing (Development Complete)Operator Workload (Current)

Page 4: 1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA Email: AXS7@NRC.GOVAXS7@NRC.GOV Phone: 301-415-6587.

4

Why the NRC uses Simulation

Simple Comprehensive Easy to Use Faster than real time data collection Enhances understanding of system Supplements empirical research

Page 5: 1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA Email: AXS7@NRC.GOVAXS7@NRC.GOV Phone: 301-415-6587.

5

IMPRINT for NRC application

IMPRINT developed for: Early design evaluation Opportunity to affect design Single system acquisition Distributed / environmental extremes

NRC needs: Post-construction evaluation Opportunity to affect operations Multiple variations of similar system evaluation Fixed environment

Page 6: 1 IMPRINT Developer’s Workshop: NRC’s Perspective December 6 -7, 2005 By: Autumn Szabo, CEA Email: AXS7@NRC.GOVAXS7@NRC.GOV Phone: 301-415-6587.

6

Possible Opportunities

Cooperative research Possible uses for Imprint and other variants

Cost sharing Development of future research regarding Imprint

applications Data sharing

Related applications for simulation Any background information related to staffing or