1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

44
1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation

Transcript of 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

Page 1: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

1

IAR Prototype Demonstration

June 21, 2002

Screens and System Navigation

Page 2: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

2

SRA/GTA Activities Flow

1. Finalize Roster2. Make Application Assignments3. Navigate to IAR Control Center4. Set IAR Specific Dates5. Release Meeting to IAR6. Toggle different Meeting Specific and

Reviewer Specific Options

Page 3: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

3

Peer Review Banner Screen w/ IAR Section

Page 4: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

4

IAR Control Center

Page 5: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

5

Control Center – Enter/Update Dates

Page 6: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

6

Control Center – Meeting Wide Options

Page 7: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

7

Control Center – Reviewer IAR Information

Page 8: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

8

Control Center – List of Assigned Applications

Page 9: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

9

Control Center – Enable for IAR Confirmation

Page 10: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

10

Control Center – Enable for IAR Confirmation

Page 11: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

11

Registration and Account Creation

An architectural review of IAR was recently conducted. Based primarily on the requirement to more closely align similar processes across applications, the previously proposed IAR account creation and registration process will change. Most importantly, the PIN letter mailed to the Reviewer will be removed.

The next slide describes the new process.

Page 12: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

12

Registration and Account Creation - continued

1) The Reviewer will receive an email containing the customized URL (unique token identifier for each Reviewer).

2) Reviewer goes to URL and enters their full name, phone number, desired username and password and optional fields (ssn, dob, Institution). Account is not yet active.

3) Registration information is electronically provided to OER Data Quality staff who verify that the information entered matches IMPAC II data; they may also clean up person data on the Reviewer.

4) Within 24 hours, OER Data Quality staff approve and activate account.5) Reviewer receives email to let them know their account is active. Email

contains URL for IAR logon screen.

Page 13: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

13

Registration Email Example

Subject: NIH IAR Review Registration Dear Reviewer:Thank you for agreeing to be a participant on a peer review panel. To submit your written reviews electronically, you will need to log on to the NIH eRA Internet Assisted Review (IAR) website with a user name and password. To establish that user name and password, we have set up a special URL (address on the Internet) that is unique to you. Open your Web browser and go to the URL https://xxx.xxx.xxx.xxx. (You can copy and paste this address into the “Location” window of your browser, and press Enter.) Follow the instructions on the screen to enter information about yourself and select your user name, password, and password reminder question.

After submitting your registration request, you should receive an email within 24 hours indicating that your account is active.

Once your account is active, you may log in to IAR. If you have questions or problems setting up your account, please call the NIH eRA Helpdesk at 1-301-402-7469 or 1-866-504-9552.

Thank you for your time and effort.

Sincerely,

SRA, Ph.D./MDScientific Review Administrator(street address)Bethesda, MD 2089x-xxx301-xxx-xxxx

Page 14: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

14

IAR Registration Form

Page 15: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

15

Reviewer successfully completed registration form.

Page 16: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

16

Log In

Page 17: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

17

Password Look up – Answer the Question

Page 18: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

18

Password Reset – Question Answered Incorrectly – try again

Page 19: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

19

Password Reset – Question Answered Incorrectly – no more tries

Page 20: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

20

Password Reset – Question Answered Correctly

Page 21: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

21

Password Reset – Success

Page 22: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

22

Reviewer successfully logs in to the IAR.

Page 23: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

23

List of Meetings – Same layout for SRAs/GTAs and Reviewers

Page 24: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

24

Reviewer – List of Applications – Before SUBMIT Due Date

Page 25: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

25

Page 26: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

26

Reviewer – Submitting Critique/Score

Page 27: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

27

Reviewer – Submitting Critique/Score

Page 28: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

28

Reviewer – Critique/Score Submitted Confirmation

Page 29: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

29

Reviewer – List of Applications READ Phase – All Applications

Page 30: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

30

Reviewer – List of Applications READ Phase – All ApplicationsCOI and Blocked

Page 31: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

31

Reviewer – Score Matrix View

Page 32: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

32

SRA/GTA will log into IAR via the same log in screen. To navigate to that screen, SRA/GTA can either bookmark the IAR website or click on IAR System Log on button on Peer Review Banner Screen.

Once in IAR – SRA/GTA will be presented with a List of Meetings Screen.

Clicking on meeting identifier/title will take users to the List of Applications screen.

SRA/GTA Access to IAR

Page 33: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

33

SRA/GTA – List of Applications – View by Appl. – SUBMIT Phase

Page 34: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

34

SRA/GTA – List of Applications – View by Reviewer – SUBMIT Phase

Page 35: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

35

SRA/GTA – List of Applications – View by Appl. – READ Phase

Page 36: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

36

SRA/GTA – List of Applications – View by Reviewer – READ Phase

Page 37: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

37

Score Matrix – SRA/GTA View

Page 38: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

38

Score Matrix – SRA/GTA Edit

Page 39: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

39

Score Matrix – SRA/GTA Viewing Lower Half Applications Only

Page 40: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

40

Critique Status Report

Page 41: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

41

Viewing Submitted Critiques

• Individual Critique (PDF)• A group for a specific application (PDF)• A group from a specific Reviewer (PDF)• All Critiques in a Meeting (PDF)• Pre-Summary Statement Body (MS Word)

Page 42: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

42

Viewing Critiques – PDF Example

Page 43: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

43

Pre-Summary Statement Body – MS Word Example

Page 44: 1 IAR Prototype Demonstration June 21, 2002 Screens and System Navigation.

44

Questions?