ift i Report Number ~~ DETAILED DAMAGJ INSPECTION REPORT K-071-LA-SRB-Broadwayus Depllrtment
Sneet Admlniatrdon r~~a (Title 23 Federal-ald Highways)
__1_ of ---shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
Katrina i Broadway from Fountainbleau to Leake in Orleans Parish 208 miles in length
Inspection DateIncludes 2 travel lanes and 2 parking lanes 05042010 Description of Damage Federal-ald Route Number
Local )Pavement deterioration due to submerged road andor debris hauling after I
Hurricane Katrina Pavement meets submerged roads criteria per agreement County
between FHWA Division and LDOTD Field review conducted on 541201-0 Or1eans
i NA
Description ofWork to Date (Equipment Labor and Materials)
Cost Estimate
Unit Unit Price 1 Quantity Cost
Completed Remaining
$0
$0 $0
bull $0
middotI----------------------------------____4-__~----__+_------_+----------_ri________~$~O ~~--------------------------------+_~~----~------~--------_+--------$~O [1-----___________________+-_~--_4-------~------_+------~$~0 $01~~------------------------------------4---4_------+-------_+----------_r--------~~L-------------------------------_+---~----_------_r--------_+------~$~O
$Ol $0
$O IMethod
i 0 Local Forcas Slate Forcas Dcontract
Sllbtolal $0 $0 I--------$f----------$~O
PEfCE L-________~O~------__ $0Emergency Repair Tolal
$0 $0 $0
Pavement patching MUl2 and 2 HMAC overlaYstripping $1471Oii 100 $1 471087 i c ADA ramps Miscellaneous work such as manhole SO middot ~ adjustments and curb and gutter replacement to be included $0 I ~ only where required to accomodate patching and overlay $0 QI $0 i ~ 1----c-------------------------------------1f---t-------t--------+---------------------~1j PEiCE included in estimate $0 bull c $01sect~------------------------~-4----~-----li------------~~$O
Iamp~--------------------------------~--L-----~-------L----~~~--_~~~$~O Method Subtotall----__$1pound471O8j7
Local Forcas Slate Forces
I bull Environmental Assessment Recommendation
III Categorical Exclusion 0 EAfEIS
Recommendation
Concurrence
Concurrence
I
III Yes
rYes
o Ineligible
III Contract PBCEI---shy________~$~O
Rignt-of-way 1-------------1
Perm Repair Total$ $1471087
Estimated Total $1471087 FHWA Engineer __All ~ ~ ~gned Form on File Date L Mark Stinson FE7)nvtf AT1-~ m (lZIIO
Slate Engineer 7 1 Date l I BuZZYWegeneir~ A I [l] 6IZ30
Local Agency Representative U P D Datel
Form FHWA-1547 (Rev 4-98)
bull pertmentof TransportationFedaral Highway Administration
DETAILED DAMAGE INSPECTION REPORT
(Title 23 Federal-ald Highways)
Location (Name ofRoad and Milepost)
1 Freret from Louisiana to Jefferson in Orleans Parish 094 miles in length Includes 2 travel lanes and 2 parking lanes
Description of Damage
Pavement deterioration due to submerged road andor debris hauling after
I Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate
Description of Work to Date I Unit Unit Price Quantity(EqUipment Labor and Matelials)
INA
i J II
i 0 iJ i fl~ w
Method Subtotal
Local Forces Stele Forces oContract PECE
Report Number
K-071-LA-SRB-Freret
Sheet f 1__0 -~~-
FHWA Disaster Number Katrina
Inspection Date 050412010
Federal-aid Route Number
Local
I State County
LA Orleans
Cost
Completed Remaining
$0 $0
$0 $0 $01 $01 $0 1
$0 $0 $0 $0 $0 $0 $0
1
$01 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overl~stripping $56705QD 100 $567050 c ADA ramps Miscellaneous work such as manhole $0 0
$0p adjustments and curb and gutter replacement to be included III
~ only where required to accomodate patching and overtay $0gj $00 PECE included in estimate $0c Gl
$0c
~ $0 If $567~Method Subtotal
o Local Forces o State Forces III Contract PElCE $0
Right-of-Way I I Penn Repair Totals $567050 rEnvironmental Assessment Recommendation I (7) Categorical exclUSion n EAlEIS Estimated ToIal $567050 Recommendation FHWA Engineer 1r1-4AJJkned Form on File Date
1pound Eligible r Ineligible Mark Stinson PE r J W GrZtUO~-~~-~---~------~~-----~
State Engineer d~ L-~ Datel
~Concurrence Il Yes DNo Buzzv Wegener PE IA z-gt 10
I Concurrance Local Agenc ReprasentaUve J D I
Datel I i rYeS rNo
Form FHWA-1647 (Rev 4-98)
I
2panmen Report Number IDETAILED DAMAGE INSPECTION REPORT K()71-LA-SRB-Nashville iat Transportation (Title 23 Federal-ald Highways) Sheet IFldtllll Highway
__1_ of _~__ IAdmlnlstratlofl
Location (Name ofRoad and Milepost) FHWA Disaster Number
1Nashville from S Claiborne to Fountainbleau in Orleans Parish 058 miles in length Katrina
Includes 4 travel lanes and 2 parking lanes Inspection Date 050412010
DescriptionofDa~e Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 JLA Orleans
Cost Estimate
Description of Work to Date Unit Unit PrIce Quanllty Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
I $0
$0 iii I $0i
$0I
~I $0 (II
I $0El (II
$01~I $0
$0
$0
Method Subtotal $0 $0
o Local Forces o State Forces ocontract PEICE $0 $Oi Emergency RepaIr Total $0
I $Oi $0
Pavement patching Mill 4 and 4K HMAC overlay (2 miles) $0 Mill 2 and 2 HMAC overlay (38 miles) stripping $7261228 100 $726122
~ ADA ramps Miscellaneous work such as manhole $0 I I adjustments and curb and gutter replacement to be included $0i only where required to accomodate patching and overlay $0
$0 o
J PECE included in estimate $0 $0IV
E I $0 ~ $0
Melhod SUbtotal $726122
o local Forces State Forces III Contract PElCE $0
Right-of-Way
I i
Perm Repair Totels $726122 i Environmental Assessment Recommendation
V categorical Exclusion n EAlEIS Eslimated Total $726122 Recommendation FHWA Engineer A~ed Form [ij Date
IZ Eligible r Ineligible Mark Stlns~E fJtJJ LJ f C2ZJtJ i 1--- shy
State Engl~~ )~ Date I Concurrence IZ Ves ONo J--m (gt lt7 10BuzzvWe -7
Concurrence Local Agency Representative U
D Date
rVes [NO
Form FHWA-1547 (Rev 4-98)
---------------_ -___ shy
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment
01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)
Administration
Location (Name ofRoed end Milepost) FHWA Disaster Number
Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010
Description of Damage FeltIe1al-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate Description of Work to Data i Unit Unit Price Quantity
Cost
i (Equipment Labor and Materials) Completed Remaining i $0 NA $0
$0 i $O
iij 0 $0
1
~ $0 ~ $0r GI
i $02
~ $0
i 1 $01
1
$011 I $0 i
IMethod Subtolal $0 $Oi
o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I
1 I $0 -shyi $0
$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619
c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0
II $00
t=C PEICE included in estimate _ $0 ~ $0
~ $0 io $0
Method Subtotal f--shy $273619
o Local Forces o Slate Forces III Contract PEICE SO
Right-of-way
Perm Repair Totals $273619 Envilonmental Assessment Recommendation
V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date
(ttho 1
Il) Eligible I Ineligible Mark Stinson ~ 4 [l]
Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence
ONG Local Agency Representative
0 Date( I
I DYes
Form FHWA-1647 (Rev 4-98)
i-I
DETAILED DAMAGE INSPECTION REPORT us Department
rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon
location (Name ofROIJd and Milepost)
Report Number
K-071 -LA-SRB-Jefferson Oavis
Sheet __1 _ of 1__ _ _~
FHWA Disaster Number
Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length
I Includes 4 travel lanes and 2 parking lanes
Katrina
Inspection Date 05042010
DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
OS s maeC tEti t
Description of Work 10 Date Unit Unit PrIce
Cost (Equipment Labor and Materials) Quantity
Completed Remaining
$Oi NA
I $Oi -~
$0 $0 1
1 $0
I $0
~ $0 i(i $Oi
$0W
$0 $0
I $0
1
IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0
Emergency Repair Total $0 $0
j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100
c ADA rampS Miscellaneoua work such as manhole i
$478390
~O ~ I adjustments and curb and gutter replacement to be included
--~-
$0 S only where required to accomodate patchDg and overlay $01I $0IX
$0 1i PEiCE included in estimate
IJ $0
I $0 1
i shyI $0
I Method Subtotal $478390
I
o Local Forces o State Forces III Contract PEfCE $0
Rlght-ofmiddotWay
Penn Repair Totals $478390 Environmental Asse8llment Recommendation
I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390
I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I
DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI
Coneurtaf1(8 i Local Agency Representative U CJ Date I
I [J Yes r No
Form FHWA-1547 (Rev 4-98)
L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle
of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway
__1_ of _1__ Administration
ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina
i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date
i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~
Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate
DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt
(Equipment Labor and Matenals) Completed Remaining
$0 NA $0
$01
$01
l $Oi ~ $0 (S $0c ~i II)
$0
$0E W
$0 $0
$0
MethOd Subtotal $0 $01
o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0
Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0
$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i
c Miscellaneous work such as manhole $0
1adjustments and curb and gutter replacement to be included i $0-------
$0
Monly where required to accomodate patching and overlay
$0 1 bull PECE included in estimate $0CI)
$0til i $0 c i $0
MethOd Subtolal $658220
o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way
Perm RepairT08s $658220 Environmental Assessment Recommendation
R1 CategOrical Exclusion o EIVEIS Estimated~ $658220
i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i
2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf
BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve
D Date I IUYea nNo
Form FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department
of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)
Federal Hlahway (Title 23 Federal-aid Highways)
FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length
InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
1
between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans
Cost Estimate
CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining
$0
$0 $0
$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O
~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0
$0 $0
I $0
Method SubtOtal $0 $0
o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0
$0 $0
$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474
c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0
Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi
J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1
r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I
I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474
o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu
Recommendation IiJ Eligible
Concurrerue
Concurrence I rJ YelS DNO
Local Agency Repre5entatille - 0 IDatef
Form FHWAmiddot1647 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
bull pertmentof TransportationFedaral Highway Administration
DETAILED DAMAGE INSPECTION REPORT
(Title 23 Federal-ald Highways)
Location (Name ofRoad and Milepost)
1 Freret from Louisiana to Jefferson in Orleans Parish 094 miles in length Includes 2 travel lanes and 2 parking lanes
Description of Damage
Pavement deterioration due to submerged road andor debris hauling after
I Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate
Description of Work to Date I Unit Unit Price Quantity(EqUipment Labor and Matelials)
INA
i J II
i 0 iJ i fl~ w
Method Subtotal
Local Forces Stele Forces oContract PECE
Report Number
K-071-LA-SRB-Freret
Sheet f 1__0 -~~-
FHWA Disaster Number Katrina
Inspection Date 050412010
Federal-aid Route Number
Local
I State County
LA Orleans
Cost
Completed Remaining
$0 $0
$0 $0 $01 $01 $0 1
$0 $0 $0 $0 $0 $0 $0
1
$01 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overl~stripping $56705QD 100 $567050 c ADA ramps Miscellaneous work such as manhole $0 0
$0p adjustments and curb and gutter replacement to be included III
~ only where required to accomodate patching and overtay $0gj $00 PECE included in estimate $0c Gl
$0c
~ $0 If $567~Method Subtotal
o Local Forces o State Forces III Contract PElCE $0
Right-of-Way I I Penn Repair Totals $567050 rEnvironmental Assessment Recommendation I (7) Categorical exclUSion n EAlEIS Estimated ToIal $567050 Recommendation FHWA Engineer 1r1-4AJJkned Form on File Date
1pound Eligible r Ineligible Mark Stinson PE r J W GrZtUO~-~~-~---~------~~-----~
State Engineer d~ L-~ Datel
~Concurrence Il Yes DNo Buzzv Wegener PE IA z-gt 10
I Concurrance Local Agenc ReprasentaUve J D I
Datel I i rYeS rNo
Form FHWA-1647 (Rev 4-98)
I
2panmen Report Number IDETAILED DAMAGE INSPECTION REPORT K()71-LA-SRB-Nashville iat Transportation (Title 23 Federal-ald Highways) Sheet IFldtllll Highway
__1_ of _~__ IAdmlnlstratlofl
Location (Name ofRoad and Milepost) FHWA Disaster Number
1Nashville from S Claiborne to Fountainbleau in Orleans Parish 058 miles in length Katrina
Includes 4 travel lanes and 2 parking lanes Inspection Date 050412010
DescriptionofDa~e Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 JLA Orleans
Cost Estimate
Description of Work to Date Unit Unit PrIce Quanllty Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
I $0
$0 iii I $0i
$0I
~I $0 (II
I $0El (II
$01~I $0
$0
$0
Method Subtotal $0 $0
o Local Forces o State Forces ocontract PEICE $0 $Oi Emergency RepaIr Total $0
I $Oi $0
Pavement patching Mill 4 and 4K HMAC overlay (2 miles) $0 Mill 2 and 2 HMAC overlay (38 miles) stripping $7261228 100 $726122
~ ADA ramps Miscellaneous work such as manhole $0 I I adjustments and curb and gutter replacement to be included $0i only where required to accomodate patching and overlay $0
$0 o
J PECE included in estimate $0 $0IV
E I $0 ~ $0
Melhod SUbtotal $726122
o local Forces State Forces III Contract PElCE $0
Right-of-Way
I i
Perm Repair Totels $726122 i Environmental Assessment Recommendation
V categorical Exclusion n EAlEIS Eslimated Total $726122 Recommendation FHWA Engineer A~ed Form [ij Date
IZ Eligible r Ineligible Mark Stlns~E fJtJJ LJ f C2ZJtJ i 1--- shy
State Engl~~ )~ Date I Concurrence IZ Ves ONo J--m (gt lt7 10BuzzvWe -7
Concurrence Local Agency Representative U
D Date
rVes [NO
Form FHWA-1547 (Rev 4-98)
---------------_ -___ shy
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment
01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)
Administration
Location (Name ofRoed end Milepost) FHWA Disaster Number
Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010
Description of Damage FeltIe1al-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate Description of Work to Data i Unit Unit Price Quantity
Cost
i (Equipment Labor and Materials) Completed Remaining i $0 NA $0
$0 i $O
iij 0 $0
1
~ $0 ~ $0r GI
i $02
~ $0
i 1 $01
1
$011 I $0 i
IMethod Subtolal $0 $Oi
o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I
1 I $0 -shyi $0
$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619
c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0
II $00
t=C PEICE included in estimate _ $0 ~ $0
~ $0 io $0
Method Subtotal f--shy $273619
o Local Forces o Slate Forces III Contract PEICE SO
Right-of-way
Perm Repair Totals $273619 Envilonmental Assessment Recommendation
V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date
(ttho 1
Il) Eligible I Ineligible Mark Stinson ~ 4 [l]
Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence
ONG Local Agency Representative
0 Date( I
I DYes
Form FHWA-1647 (Rev 4-98)
i-I
DETAILED DAMAGE INSPECTION REPORT us Department
rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon
location (Name ofROIJd and Milepost)
Report Number
K-071 -LA-SRB-Jefferson Oavis
Sheet __1 _ of 1__ _ _~
FHWA Disaster Number
Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length
I Includes 4 travel lanes and 2 parking lanes
Katrina
Inspection Date 05042010
DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
OS s maeC tEti t
Description of Work 10 Date Unit Unit PrIce
Cost (Equipment Labor and Materials) Quantity
Completed Remaining
$Oi NA
I $Oi -~
$0 $0 1
1 $0
I $0
~ $0 i(i $Oi
$0W
$0 $0
I $0
1
IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0
Emergency Repair Total $0 $0
j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100
c ADA rampS Miscellaneoua work such as manhole i
$478390
~O ~ I adjustments and curb and gutter replacement to be included
--~-
$0 S only where required to accomodate patchDg and overlay $01I $0IX
$0 1i PEiCE included in estimate
IJ $0
I $0 1
i shyI $0
I Method Subtotal $478390
I
o Local Forces o State Forces III Contract PEfCE $0
Rlght-ofmiddotWay
Penn Repair Totals $478390 Environmental Asse8llment Recommendation
I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390
I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I
DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI
Coneurtaf1(8 i Local Agency Representative U CJ Date I
I [J Yes r No
Form FHWA-1547 (Rev 4-98)
L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle
of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway
__1_ of _1__ Administration
ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina
i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date
i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~
Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate
DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt
(Equipment Labor and Matenals) Completed Remaining
$0 NA $0
$01
$01
l $Oi ~ $0 (S $0c ~i II)
$0
$0E W
$0 $0
$0
MethOd Subtotal $0 $01
o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0
Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0
$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i
c Miscellaneous work such as manhole $0
1adjustments and curb and gutter replacement to be included i $0-------
$0
Monly where required to accomodate patching and overlay
$0 1 bull PECE included in estimate $0CI)
$0til i $0 c i $0
MethOd Subtolal $658220
o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way
Perm RepairT08s $658220 Environmental Assessment Recommendation
R1 CategOrical Exclusion o EIVEIS Estimated~ $658220
i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i
2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf
BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve
D Date I IUYea nNo
Form FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department
of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)
Federal Hlahway (Title 23 Federal-aid Highways)
FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length
InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
1
between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans
Cost Estimate
CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining
$0
$0 $0
$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O
~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0
$0 $0
I $0
Method SubtOtal $0 $0
o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0
$0 $0
$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474
c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0
Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi
J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1
r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I
I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474
o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu
Recommendation IiJ Eligible
Concurrerue
Concurrence I rJ YelS DNO
Local Agency Repre5entatille - 0 IDatef
Form FHWAmiddot1647 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
I
2panmen Report Number IDETAILED DAMAGE INSPECTION REPORT K()71-LA-SRB-Nashville iat Transportation (Title 23 Federal-ald Highways) Sheet IFldtllll Highway
__1_ of _~__ IAdmlnlstratlofl
Location (Name ofRoad and Milepost) FHWA Disaster Number
1Nashville from S Claiborne to Fountainbleau in Orleans Parish 058 miles in length Katrina
Includes 4 travel lanes and 2 parking lanes Inspection Date 050412010
DescriptionofDa~e Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 JLA Orleans
Cost Estimate
Description of Work to Date Unit Unit PrIce Quanllty Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
I $0
$0 iii I $0i
$0I
~I $0 (II
I $0El (II
$01~I $0
$0
$0
Method Subtotal $0 $0
o Local Forces o State Forces ocontract PEICE $0 $Oi Emergency RepaIr Total $0
I $Oi $0
Pavement patching Mill 4 and 4K HMAC overlay (2 miles) $0 Mill 2 and 2 HMAC overlay (38 miles) stripping $7261228 100 $726122
~ ADA ramps Miscellaneous work such as manhole $0 I I adjustments and curb and gutter replacement to be included $0i only where required to accomodate patching and overlay $0
$0 o
J PECE included in estimate $0 $0IV
E I $0 ~ $0
Melhod SUbtotal $726122
o local Forces State Forces III Contract PElCE $0
Right-of-Way
I i
Perm Repair Totels $726122 i Environmental Assessment Recommendation
V categorical Exclusion n EAlEIS Eslimated Total $726122 Recommendation FHWA Engineer A~ed Form [ij Date
IZ Eligible r Ineligible Mark Stlns~E fJtJJ LJ f C2ZJtJ i 1--- shy
State Engl~~ )~ Date I Concurrence IZ Ves ONo J--m (gt lt7 10BuzzvWe -7
Concurrence Local Agency Representative U
D Date
rVes [NO
Form FHWA-1547 (Rev 4-98)
---------------_ -___ shy
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment
01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)
Administration
Location (Name ofRoed end Milepost) FHWA Disaster Number
Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010
Description of Damage FeltIe1al-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate Description of Work to Data i Unit Unit Price Quantity
Cost
i (Equipment Labor and Materials) Completed Remaining i $0 NA $0
$0 i $O
iij 0 $0
1
~ $0 ~ $0r GI
i $02
~ $0
i 1 $01
1
$011 I $0 i
IMethod Subtolal $0 $Oi
o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I
1 I $0 -shyi $0
$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619
c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0
II $00
t=C PEICE included in estimate _ $0 ~ $0
~ $0 io $0
Method Subtotal f--shy $273619
o Local Forces o Slate Forces III Contract PEICE SO
Right-of-way
Perm Repair Totals $273619 Envilonmental Assessment Recommendation
V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date
(ttho 1
Il) Eligible I Ineligible Mark Stinson ~ 4 [l]
Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence
ONG Local Agency Representative
0 Date( I
I DYes
Form FHWA-1647 (Rev 4-98)
i-I
DETAILED DAMAGE INSPECTION REPORT us Department
rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon
location (Name ofROIJd and Milepost)
Report Number
K-071 -LA-SRB-Jefferson Oavis
Sheet __1 _ of 1__ _ _~
FHWA Disaster Number
Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length
I Includes 4 travel lanes and 2 parking lanes
Katrina
Inspection Date 05042010
DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
OS s maeC tEti t
Description of Work 10 Date Unit Unit PrIce
Cost (Equipment Labor and Materials) Quantity
Completed Remaining
$Oi NA
I $Oi -~
$0 $0 1
1 $0
I $0
~ $0 i(i $Oi
$0W
$0 $0
I $0
1
IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0
Emergency Repair Total $0 $0
j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100
c ADA rampS Miscellaneoua work such as manhole i
$478390
~O ~ I adjustments and curb and gutter replacement to be included
--~-
$0 S only where required to accomodate patchDg and overlay $01I $0IX
$0 1i PEiCE included in estimate
IJ $0
I $0 1
i shyI $0
I Method Subtotal $478390
I
o Local Forces o State Forces III Contract PEfCE $0
Rlght-ofmiddotWay
Penn Repair Totals $478390 Environmental Asse8llment Recommendation
I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390
I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I
DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI
Coneurtaf1(8 i Local Agency Representative U CJ Date I
I [J Yes r No
Form FHWA-1547 (Rev 4-98)
L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle
of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway
__1_ of _1__ Administration
ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina
i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date
i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~
Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate
DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt
(Equipment Labor and Matenals) Completed Remaining
$0 NA $0
$01
$01
l $Oi ~ $0 (S $0c ~i II)
$0
$0E W
$0 $0
$0
MethOd Subtotal $0 $01
o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0
Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0
$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i
c Miscellaneous work such as manhole $0
1adjustments and curb and gutter replacement to be included i $0-------
$0
Monly where required to accomodate patching and overlay
$0 1 bull PECE included in estimate $0CI)
$0til i $0 c i $0
MethOd Subtolal $658220
o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way
Perm RepairT08s $658220 Environmental Assessment Recommendation
R1 CategOrical Exclusion o EIVEIS Estimated~ $658220
i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i
2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf
BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve
D Date I IUYea nNo
Form FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department
of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)
Federal Hlahway (Title 23 Federal-aid Highways)
FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length
InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
1
between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans
Cost Estimate
CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining
$0
$0 $0
$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O
~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0
$0 $0
I $0
Method SubtOtal $0 $0
o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0
$0 $0
$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474
c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0
Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi
J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1
r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I
I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474
o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu
Recommendation IiJ Eligible
Concurrerue
Concurrence I rJ YelS DNO
Local Agency Repre5entatille - 0 IDatef
Form FHWAmiddot1647 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment
01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)
Administration
Location (Name ofRoed end Milepost) FHWA Disaster Number
Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010
Description of Damage FeltIe1al-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate Description of Work to Data i Unit Unit Price Quantity
Cost
i (Equipment Labor and Materials) Completed Remaining i $0 NA $0
$0 i $O
iij 0 $0
1
~ $0 ~ $0r GI
i $02
~ $0
i 1 $01
1
$011 I $0 i
IMethod Subtolal $0 $Oi
o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I
1 I $0 -shyi $0
$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619
c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0
II $00
t=C PEICE included in estimate _ $0 ~ $0
~ $0 io $0
Method Subtotal f--shy $273619
o Local Forces o Slate Forces III Contract PEICE SO
Right-of-way
Perm Repair Totals $273619 Envilonmental Assessment Recommendation
V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date
(ttho 1
Il) Eligible I Ineligible Mark Stinson ~ 4 [l]
Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence
ONG Local Agency Representative
0 Date( I
I DYes
Form FHWA-1647 (Rev 4-98)
i-I
DETAILED DAMAGE INSPECTION REPORT us Department
rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon
location (Name ofROIJd and Milepost)
Report Number
K-071 -LA-SRB-Jefferson Oavis
Sheet __1 _ of 1__ _ _~
FHWA Disaster Number
Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length
I Includes 4 travel lanes and 2 parking lanes
Katrina
Inspection Date 05042010
DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
OS s maeC tEti t
Description of Work 10 Date Unit Unit PrIce
Cost (Equipment Labor and Materials) Quantity
Completed Remaining
$Oi NA
I $Oi -~
$0 $0 1
1 $0
I $0
~ $0 i(i $Oi
$0W
$0 $0
I $0
1
IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0
Emergency Repair Total $0 $0
j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100
c ADA rampS Miscellaneoua work such as manhole i
$478390
~O ~ I adjustments and curb and gutter replacement to be included
--~-
$0 S only where required to accomodate patchDg and overlay $01I $0IX
$0 1i PEiCE included in estimate
IJ $0
I $0 1
i shyI $0
I Method Subtotal $478390
I
o Local Forces o State Forces III Contract PEfCE $0
Rlght-ofmiddotWay
Penn Repair Totals $478390 Environmental Asse8llment Recommendation
I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390
I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I
DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI
Coneurtaf1(8 i Local Agency Representative U CJ Date I
I [J Yes r No
Form FHWA-1547 (Rev 4-98)
L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle
of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway
__1_ of _1__ Administration
ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina
i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date
i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~
Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate
DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt
(Equipment Labor and Matenals) Completed Remaining
$0 NA $0
$01
$01
l $Oi ~ $0 (S $0c ~i II)
$0
$0E W
$0 $0
$0
MethOd Subtotal $0 $01
o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0
Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0
$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i
c Miscellaneous work such as manhole $0
1adjustments and curb and gutter replacement to be included i $0-------
$0
Monly where required to accomodate patching and overlay
$0 1 bull PECE included in estimate $0CI)
$0til i $0 c i $0
MethOd Subtolal $658220
o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way
Perm RepairT08s $658220 Environmental Assessment Recommendation
R1 CategOrical Exclusion o EIVEIS Estimated~ $658220
i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i
2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf
BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve
D Date I IUYea nNo
Form FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department
of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)
Federal Hlahway (Title 23 Federal-aid Highways)
FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length
InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
1
between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans
Cost Estimate
CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining
$0
$0 $0
$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O
~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0
$0 $0
I $0
Method SubtOtal $0 $0
o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0
$0 $0
$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474
c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0
Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi
J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1
r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I
I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474
o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu
Recommendation IiJ Eligible
Concurrerue
Concurrence I rJ YelS DNO
Local Agency Repre5entatille - 0 IDatef
Form FHWAmiddot1647 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
i-I
DETAILED DAMAGE INSPECTION REPORT us Department
rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon
location (Name ofROIJd and Milepost)
Report Number
K-071 -LA-SRB-Jefferson Oavis
Sheet __1 _ of 1__ _ _~
FHWA Disaster Number
Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length
I Includes 4 travel lanes and 2 parking lanes
Katrina
Inspection Date 05042010
DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
OS s maeC tEti t
Description of Work 10 Date Unit Unit PrIce
Cost (Equipment Labor and Materials) Quantity
Completed Remaining
$Oi NA
I $Oi -~
$0 $0 1
1 $0
I $0
~ $0 i(i $Oi
$0W
$0 $0
I $0
1
IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0
Emergency Repair Total $0 $0
j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100
c ADA rampS Miscellaneoua work such as manhole i
$478390
~O ~ I adjustments and curb and gutter replacement to be included
--~-
$0 S only where required to accomodate patchDg and overlay $01I $0IX
$0 1i PEiCE included in estimate
IJ $0
I $0 1
i shyI $0
I Method Subtotal $478390
I
o Local Forces o State Forces III Contract PEfCE $0
Rlght-ofmiddotWay
Penn Repair Totals $478390 Environmental Asse8llment Recommendation
I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390
I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I
DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI
Coneurtaf1(8 i Local Agency Representative U CJ Date I
I [J Yes r No
Form FHWA-1547 (Rev 4-98)
L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle
of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway
__1_ of _1__ Administration
ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina
i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date
i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~
Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate
DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt
(Equipment Labor and Matenals) Completed Remaining
$0 NA $0
$01
$01
l $Oi ~ $0 (S $0c ~i II)
$0
$0E W
$0 $0
$0
MethOd Subtotal $0 $01
o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0
Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0
$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i
c Miscellaneous work such as manhole $0
1adjustments and curb and gutter replacement to be included i $0-------
$0
Monly where required to accomodate patching and overlay
$0 1 bull PECE included in estimate $0CI)
$0til i $0 c i $0
MethOd Subtolal $658220
o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way
Perm RepairT08s $658220 Environmental Assessment Recommendation
R1 CategOrical Exclusion o EIVEIS Estimated~ $658220
i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i
2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf
BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve
D Date I IUYea nNo
Form FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department
of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)
Federal Hlahway (Title 23 Federal-aid Highways)
FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length
InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
1
between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans
Cost Estimate
CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining
$0
$0 $0
$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O
~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0
$0 $0
I $0
Method SubtOtal $0 $0
o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0
$0 $0
$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474
c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0
Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi
J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1
r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I
I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474
o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu
Recommendation IiJ Eligible
Concurrerue
Concurrence I rJ YelS DNO
Local Agency Repre5entatille - 0 IDatef
Form FHWAmiddot1647 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle
of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway
__1_ of _1__ Administration
ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina
i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date
i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~
Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate
DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt
(Equipment Labor and Matenals) Completed Remaining
$0 NA $0
$01
$01
l $Oi ~ $0 (S $0c ~i II)
$0
$0E W
$0 $0
$0
MethOd Subtotal $0 $01
o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0
Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0
$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i
c Miscellaneous work such as manhole $0
1adjustments and curb and gutter replacement to be included i $0-------
$0
Monly where required to accomodate patching and overlay
$0 1 bull PECE included in estimate $0CI)
$0til i $0 c i $0
MethOd Subtolal $658220
o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way
Perm RepairT08s $658220 Environmental Assessment Recommendation
R1 CategOrical Exclusion o EIVEIS Estimated~ $658220
i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i
2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf
BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve
D Date I IUYea nNo
Form FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department
of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)
Federal Hlahway (Title 23 Federal-aid Highways)
FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length
InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
1
between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans
Cost Estimate
CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining
$0
$0 $0
$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O
~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0
$0 $0
I $0
Method SubtOtal $0 $0
o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0
$0 $0
$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474
c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0
Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi
J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1
r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I
I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474
o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu
Recommendation IiJ Eligible
Concurrerue
Concurrence I rJ YelS DNO
Local Agency Repre5entatille - 0 IDatef
Form FHWAmiddot1647 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department
of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)
Federal Hlahway (Title 23 Federal-aid Highways)
FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length
InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
1
between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans
Cost Estimate
CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining
$0
$0 $0
$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O
~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0
$0 $0
I $0
Method SubtOtal $0 $0
o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0
$0 $0
$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474
c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0
Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi
J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1
r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I
I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474
o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu
Recommendation IiJ Eligible
Concurrerue
Concurrence I rJ YelS DNO
Local Agency Repre5entatille - 0 IDatef
Form FHWAmiddot1647 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
__
I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark
r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__
Location (llame ofRoad and Milepost) Admlniltratlon
FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length
Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate
Descr1ption ot Wort to Date CostUnit Unit PriCe
1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i
$0 NA
~ ~
a~----------------~+---~--r---~----=~ 1 SO
C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O
$0I
Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O
Emergency Repair Total- $0
$0 $0 $0
i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-
~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy
o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--
Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I
[J Yes DNo i
Form FHWAmiddot1647 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department
of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly
__1_ of 1Admlnistrltion
Location (Name ofRoad end Milepost) FHWA Disaster Number
Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010
Description of Damage Federel-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
I Cost Estimate
Description of Work to Date Unit Unit Price QuantitY Cost
(Equipment Lebor and Materials) i Completed Remaining
$0 iNA $0
$0 $0
i $0I $0
~ $0Ii $02l
~ I $0w $0 $0
i $0
IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0
j Emergency Repair Total $0
i $0 $0 $0
bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0
bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---
$0 E $0 ~ $0
Method Subtotal $1775277
o Local Forces Stete Forces III Contract PEtCE SO Right-of-way
I Penn Repair Totals $1775277
Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277
Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24
Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71
Concurrence Local Agency Representative Date7 I
C Yes DNa D Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -
Location (Nama ofRoad and MHepost) FHWA DIsaster Number
Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina
Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number
i Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I
Cost Estimate I Description of Work to Date
Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining
$0 NA $0
i $0
$0
JI $0 1
$0 lr $0i
$0EI ~ I $0
UJ $0 $0 $0
Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01
IEmergency Repair Total I $0 -1--
i $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-
$0 GIa I $01 PEfCE Included in estimate $0
$0 EJ
----~~----
$0 ~ $0_--_
Method Subtotal $884663
o Local Forces D State Forces tZl Contract PECE $0
Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation
III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File
D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date
IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f
Concunence Local Agency Representative D Da1 7 1Dves nNo I
Form FHWAmiddot1547 (Rev 4middot98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
us Depar1ment of TraMportation
DETAILED DAMAGE INSPECTION REPORT Report Number
K-071-LA-SRB-Rampart
(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon
Sheet
Location (Name ofRoad and MHep~t) FHWA Disaster Number
Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date
05042010 j
~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010
IState County
LA Orleans I
Cost Estimate
DescripflOn of WoIk to Date Unit Unit Price I Quantity
Cost (Equipment Labor and Materials)
Compleled Remalning
$Oi INA $0 i $0 I $0
i I $0c ~ $0 ~ $0r
~ $0
~ $0
$0 $0
Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0
Emergency Repair Total $0 $0 $0 $0
Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0
only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0
$Of $0
0 $Oj Method Subtotal $1259785
D Local Forces D Slale Forces III Cannet PElCE
f-----shy $01 Right-of-Way
Penn Repair Totals $1259785 Environmental Assessment Recommendation
III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data
rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence
Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO
Concurrence LOcal Aqency RepresentatiVe lt
D Date I 7 rVes LiNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
11= Repolt Number -
DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation
(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1
I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number
Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I
Includes 2 travel lanes Inspection Date 050412010 I
Oescription of Damage I Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate I
Description of Work to Date Unit Unit Price Quantity Cost
(Equipmen~ Labor and Materials) Completed Remaining $Oi
NA $0
$0
$0
$0
$0 ~ $01c ~ $0 ~i $0
W $0
$0
$0
Melhod Subtotal $0 $0
Local Forces o State Forcas Dcontract PECE $0 $0 I
Emergency Repair Total $0
$0
I $0 $0
Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02
adjustments and curb and gutter replacement to be included $0~
only where required to accomodate patching and overlay $0 $0
C PEICE included in estimate $0 QI
$0c 111
E $0 ~ $0
Melhod Subtotal $226338
C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay
Perm Repair Totals $226338 Environmental Assessment Recommendation
I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File
Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No
Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(
I ryes rNo
Form FHWAmiddot1647 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number
fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon
(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration
Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans
Cost Estimate
Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$O NA $0
$0 $0
I $0 $01
~ $0c Q)
$021 ~ $0w
$01 $0 $0 1
Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0
Emergency RepairTotel $0 $0
$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222
c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0
I $0 E PEiCE Included In estimate $0CD
$0c co E $0 cf $0
Me1hod Subtotal $203222
o local Forces State Forces III Contract PEiCE $0
Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot
Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--
FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i
Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative
D Da f
IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
I
I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-
I
Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number
KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0
Descliption of Damage Federal-aid Route NUmber
I I
i
I
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010
Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)
NA
I
11 til
ia
~ ~ ~ w
I
[Method Subtotal
o Local Forces o State Forces Dcontract PEfCE i
Local
State County
LA Or1eans
C05t
Completed Remaining
I
-I
$0 $0
Emergency Repair Total
I I
$0 $0 1
$0 $0 $0 $0 $0 $0 1
$0 1
$0 $0 $0
$0 $0 $0 $0 $0 $0
$17633ji --~-
$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100
5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy
$0 I only where required to accomodate patching and overlay $0
i rPEICE included in estimate $0 c $0
i $0
$17633~~1I~ Method Subtotal
o Local Forceamp o State Forceamp III Contract PEJCE SO
i Right-of-Way
I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation
I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date
I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---
Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe
CYe5 CNo Local Agency Representafive v D Date I f
i Fonn FHWAmiddot1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
DETAILED DAMAGE INSPECTION REPORT
(TIUe 23 Federal-ald Highways)
Report Number
K-071-LA-SRB-Gentllly
Sheet __1_ 01_1__
Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish
i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)
I NA
i l 01
il G)
E w
Method Subtotal
i D Local Forces D Stale Forces PEiCE
Cost
Completed Remaining
$0 $0
I
I
$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1
$O $0Dcontract
Emergency Repair Total $0 $01
f- $0
i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703
c ADA ramps Miscellaneous work such as manhole $0 0
bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0
ampI $0 E bull PECE included in estimate $0 ~ $011)
ii $0 oi $0
MeIhod Subtotal $1156703
Local Forces D State Forces III Contract PElCE SO
Right-of-Way
Perm Repair Totals $1156703 Environmental Assessment Recommendation
II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull
Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A
~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I
[lVes eNo
Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010
DescriptIon of Damage
Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010
Fecleral-aid Route Number
Local
State County
LA Orleans
Cost Estimate
Fonn FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl
of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)
__1_ Of_1__
loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish
Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I
Descrtptlon of Demage Federal-aid Route Number
LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i
State
LA
County
Orleans
Cost Estimate
l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I
(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~
I $01 NA $0
$01 $0 ~
~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi
~
J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0
$0Emergency Repair Total
Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01
$01 $0 $0
Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~
oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~
$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~
Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract
Right-of-VVay 1---________
Perm Repair Totals i
$241766I Environmental Assessment Recommendation
Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_
rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes
i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7
DyesI Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2
of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y
__1_ of _1__I Admlnltrdon
bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I
Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina
Includes 2 travel lanes IlISpection Date 051042010
Description of Damage Federal-aid Route Number
I Pavement deterioration due to submerged road andor debris hauling after Local
1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit Unit Pr1ce Quanlily
Cost (Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
I I $0 III
$0I $0 i $0c ~ $0 ~ I $0w
$0
$0
$0
Method Subtotel $0 $0
o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0
I $0
$0 I $0
Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0
Q adJustments and curb and gutter replacement to be Included $0
~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)
I $0c t1I
$O-sectICI)
$00
Method Subtotal $332515 bull
Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L
I Perm Repair Totals bull $332515 Environmental Assessment Recommendation
(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File
Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ
I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I
~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
0gt Repor1 Number
IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion
(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon
Location (Name ofRoecJ end Milepost) FHWA Disaster Number
Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I
DescI1pIion of Damege Fedenll-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate i
Description of WOfk to Date Unit Unit Price Quantity
Cost (Equipment Labor and Materiall) Completed Remaining
$0 NA $0
$0 $0
Ii $0 $0
~ $0 41)
$0~Ir $0UJ
$0
$0 $0
Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0
Emergency Repair Total $0 $0 $Oj SO
$5624s6di -~-~-- --~ I
i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0
=I0 1 i PEICE included in estimate
f $0
I $01 amp $0
~d SubtotaJ $562456
o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay
I Pelm Repair Total $562456 Environmental AsseMment Recommendation
III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date
fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce
DNo State EnginaIJ VJ 7 -y w ~ Vt
~ves BuZV We r~ v Jf-J 0
Concurrence Local Agency Representative v
D Date7
eVes [J No I
Fonn FHWA-1647 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department
or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon
iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina
i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010
DescrIpIIon of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work tgt Date Unit Unit Prioe Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0
$0 $0~I
0 $0
~ $0 II)
$02 CD
JJ $0
$0 $0
$0
Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0
I I Emergency Repair Total $0
$0 $0 $0
Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0
only where required to accomodste patching and overlay $0I $00
$0C PECE included in estimate II)
=i $0c III
$0e ~ $0I
Method SUbtotal $757290
o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way
Perm Repair TotalS $757290 Environmental Assessment Recommendation
III Calegorkal Exclusion n EAlEIS Estlmated Total $757290
i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ
ConCUlTlnce Ipoundj Ves DNo
state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0
Date DVes DNo
Form FHWA-1S47 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
-- ---
Report Number DETAILED DAMAGE INSPECTION REPORT
nt bull K-071-LA-SRB-Hayne
Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)
of1 Admlnlstlltlon
Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish
Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number
LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
$0 NA $0
$0 i $0
iiIi $Oi a i
~ ~ ~
$0 $0 $0 SOl
~
Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract
Emergency Repair Total $0 $0 $0 1i ---
I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330
c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0
Jionly where required to accomodate patching and overlay
c $0PEICE included in estimate-Q)c $0 E til
SO tfmiddot $0
Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract
Rlght-ofmiddotway
Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File
Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D
Local Agency Representative Date 7IConcurrence DYes DNo 0 I
fonn FHWAmiddot1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department
01 TranportationI[ U
Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian
Location (Name of Road and Milepost)
Sheet __1_ of _1__
FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)
Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I
IDesctiplion of Damage Fedefal-ald Route Number
i LocslI Pavement deterioration due to submerged road andor debris hauling after I
HUrricane Katrina Pavement meets submerged roads crltena per agreement County
between FHWA Division and LDOTD Field review conducted on 542010 Or1eans
Cost Estimate
OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)
NA
I i
10
IiCf (tcQ)
EI~
Method Subtotal
Local Forcss o State Forceamp Dcontract PEICE
Cost
Completed Remaining
$0 $0
$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0
I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0
I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0
I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1
c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0
i i PECE included in estimate i $0 $0
~ $0 ~ $0
Method Subtotal $1253300 o Local Forces o State Forces III Contract
PElCE $0 RlghtmiddotofIJVay
Perm Repair Totals $1253300 i Environmental Assessment Recommendation
rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m
i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I
Dyes DNO
Fonn FHWAmiddot1547 (Rev 98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
I Report Number
DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet
i
1
Cost Estimate
__1_ of_1__Admlnlstmion
Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina
lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI
1 I $0 NA $0
$0
$0
1 $0 I $0
~ $0 Q)
$02 ~ i $0w
$0
$0
$0
Method Subtotal $0 $0
I o Local Forces o State Forces oContract PEICE $0 $0
Emergency Repalr Total $0 $0
i $0 $0
IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571
sect ADA Ramps Miscellaneous work such as manhole $0
1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00
i PEICE included in estimate $0 c $0 ~ $0 ~ $0
MeItIod subtotal $749157
Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _
$7491571Penn Repair Totals
Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157
Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()
bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i
Concurrance Local Agerry Representative v 0
Dale ( I DYes DNo
1 -shy
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway
1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number
IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina
Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i
Oesaiption of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andlor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty
between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans
Cost Estimate
Description of Work to Dete Unit Unit Price I Quantity Cost
(Equipment Labor and Materials) Completed Remaining
$0 iNA $0
$0
$0
R $0iii Co
amp $0 igt $0c Q)
$0~ ltII E w
$0
$0
$0
Method subtotal $0 $0
Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01
$0 $0 1
$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711
c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0
amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0
Metlod Subtotal $661 711
o local Fornes o State Forcas III Contract 04 PECE $0
i Right-of-Way i
Perm Repair Totals $661711 i Environmental Assessment Recommendation
III Categorical ExclUSion o ENEIS Estimated Total $661711
I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO
I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10
Concurrence Local Agency Representative v
0 Date 1 I
I[J Yes nNo
Form FHWAmiddot1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department
01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy
Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I
AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010
DesCl1ption of Damage Federal-ald Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
IHurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans
Cost Estimate
DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining
I $0 NA I $0 ~-
$0I I
I $0
1 $0 $0
~ $0 ~
I $0 ~ $0w
$0 $0 $0
Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1
Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0
$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104
c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir
c PECE included in estimate SO ~ $0
~ $0 - -shy
$0Cl I-shyMethod Subtotal $765104
i Local Forces D State Fortes III Contract PElCE SO
Right-of-way
I Perm RepalrTo1aLamp $765104
I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible
FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh
~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A
I Concurrence Local Agency Representative V D
Date ( I
DVes UNo i Form FHWAmiddot1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number
Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas
011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon
Locatlon (Name ofRoad and Milepost) FHWA Disaster Number
ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010
I Description of Damage Federalmiddotaid Route Number
Pavement deterioration due to submerged road andor debris hauling after Local
Hurricane Katrina Pavement meets submerged roads criteria per agreement State County
between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans
Cost Estimate
Description of Work to Date Unit UnltPrke Quantity Colt
(Equipment Labor and MalBnals) Completed Remaining SO
NA $0
$0 $0
1 $0 amp SO
~ $oi ~ $0
~I SO I $0
$0 $0
Method Subtotal $0 $0
localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO
$01 $0 $01
Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt
$0a bullMethod Subtotal $214720
Local FOIC88 o State Forces III Contract 00 PEICE $0
Right-of-Way Perm Repair Tolais $214720
Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720
RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]
Concurrence II Yes DNa Slate Engineer
~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v
0 Date 7 i [Jyes eNo I
1 i Fonn FHWAmiddot164T (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni
Concurrence local Agency Representative -
D Date I
I Dyes QNo
Form FHWA-1547 (Rev 4-98)
Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl
i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway
__1_ of 1bull Admlnlstrdon
I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number
I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date
i Includes 4 travel lanes 050412010
Descr1ptlon of Damage Federal-aid Route Number
Pavement deterioration due to submerged road andor debris hauling after local
i rin 55 m State Coun
between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson
Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty
Cost Estimate
i Description of Work to Date I Unit Unit Price Quantity Cost
(equipment labor and Materials) Completed Remaining
$0 NA $0
SOl $0
$0 $0
~ $0 Q)
$0i $0w $0 $0 $0
Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0
$0 I $0
I SO
Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0
only where required to accomodate patching and overlay $0i -shy $0
jl PEJCE included in estimate I $0I
$0 E $0tf -r--shy
$0 1
Method Subtotal $277901
o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi
Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation
17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m
i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni