,ift\ i Report Number DETAILED DAMAGJ;: INSPECTION REPORT K-071-LA-SR B-Broadway u.s. Depllrtment Sneet Admlniatrdon (Title 23, Federal-ald Highways) __ 1_ of --"-- Location (Name of Road and Milepost) FHWA Disaster Number Katrina i Broadway from Fountainbleau to Leake in Orleans Parish. 2.08 miles in length. Inspection Date Includes 2 travel lanes and 2 parking lanes. 05/04/2010 Description of Damage Federal-ald Route Number Local ) Pavement deterioration due to submerged road and/or debris hauling after I Hurricane Katrina. Pavement meets submerged roads criteria per agreement County between FHWA Division and LDOTD. Field review conducted on 5/41201-0. Or1eans i NA Description of Work to Date (Equipment, Labor, and Materials) Cost Estimate Unit Unit Price 1 Quantity Cost Completed Remaining $0 $0. $0 $0 ·,I---------------------------------- ____4-__ __+_------_+----------_ri________ [1-----___________________ .., $01 $Ol $0 $O! I Method i 0 Local Forcas Slate Forcas Dcontract Sl,lbtolal $0 $0 . % PEfCE L-________ $0 Emergency Repair Tolal $0 $0 $0 Pavement patching, MUl2" and 2" HMAC overlaY,stripping, $1,471,Oii 1.00 $1 471,087 i c: ADA ramps. Miscellaneous work such as manhole SO · adjustments and curb and gutter replacement to be included $0 I ! only where required to accomodate patching and overlay. $0 QI $0 i 1----c-----------:--------------------------1f---t-------t----- .. 1j PEiCE included in estimate. $0 • c: $01 Method Subtotall----__..:!$:..!,1£::4:..!.7,.!.1!.!:, O:;:8.!....j7 Local Forcas Slate Forces I Environmental Assessment Recommendation III Categorical Exclusion 0 EAfEIS Recommendation Concurrence Concurrence I III Yes rYes o Ineligible III Contract %PBCEI----________ Rignt-of-way 1-------------1 Perm. Repair Total$ $1,471,087 Estimated Total $1,471,087 FHWA Engineer __All Form on File Date. L., Mark Stinson, FE7)/nvtf, m (;/lZIIO Slate Engineer \ 7!.. 1/, Date l . I .A I [l] 6IZ*3//0 Local Agency Representative U P' D Datel ! Form FHWA-1547 (Rev. 4-98)

Transcript of 1 ·,I---------------------------------- - Louisianawebmail.dotd.louisiana.gov/agrestat.nsf... · 1...

ift i Report Number ~~ DETAILED DAMAGJ INSPECTION REPORT K-071-LA-SRB-Broadwayus Depllrtment

Sneet Admlniatrdon r~~a (Title 23 Federal-ald Highways)

__1_ of ---shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

Katrina i Broadway from Fountainbleau to Leake in Orleans Parish 208 miles in length

Inspection DateIncludes 2 travel lanes and 2 parking lanes 05042010 Description of Damage Federal-ald Route Number

Local )Pavement deterioration due to submerged road andor debris hauling after I

Hurricane Katrina Pavement meets submerged roads criteria per agreement County

between FHWA Division and LDOTD Field review conducted on 541201-0 Or1eans

i NA

Description ofWork to Date (Equipment Labor and Materials)

Cost Estimate

Unit Unit Price 1 Quantity Cost

Completed Remaining

$0

$0 $0

bull $0

middotI----------------------------------____4-__~----__+_------_+----------_ri________~$~O ~~--------------------------------+_~~----~------~--------_+--------$~O [1-----___________________+-_~--_4-------~------_+------~$~0 $01~~------------------------------------4---4_------+-------_+----------_r--------~~L-------------------------------_+---~----_------_r--------_+------~$~O

$Ol $0

$O IMethod

i 0 Local Forcas Slate Forcas Dcontract

Sllbtolal $0 $0 I--------$f----------$~O

PEfCE L-________~O~------__ $0Emergency Repair Tolal

$0 $0 $0

Pavement patching MUl2 and 2 HMAC overlaYstripping $1471Oii 100 $1 471087 i c ADA ramps Miscellaneous work such as manhole SO middot ~ adjustments and curb and gutter replacement to be included $0 I ~ only where required to accomodate patching and overlay $0 QI $0 i ~ 1----c-------------------------------------1f---t-------t--------+---------------------~1j PEiCE included in estimate $0 bull c $01sect~------------------------~-4----~-----li------------~~$O

Iamp~--------------------------------~--L-----~-------L----~~~--_~~~$~O Method Subtotall----__$1pound471O8j7

Local Forcas Slate Forces

I bull Environmental Assessment Recommendation

III Categorical Exclusion 0 EAfEIS

Recommendation

Concurrence

Concurrence

I

III Yes

rYes

o Ineligible

III Contract PBCEI---shy________~$~O

Rignt-of-way 1-------------1

Perm Repair Total$ $1471087

Estimated Total $1471087 FHWA Engineer __All ~ ~ ~gned Form on File Date L Mark Stinson FE7)nvtf AT1-~ m (lZIIO

Slate Engineer 7 1 Date l I BuZZYWegeneir~ A I [l] 6IZ30

Local Agency Representative U P D Datel

Form FHWA-1547 (Rev 4-98)

bull pertmentof TransportationFedaral Highway Administration

DETAILED DAMAGE INSPECTION REPORT

(Title 23 Federal-ald Highways)

Location (Name ofRoad and Milepost)

1 Freret from Louisiana to Jefferson in Orleans Parish 094 miles in length Includes 2 travel lanes and 2 parking lanes

Description of Damage

Pavement deterioration due to submerged road andor debris hauling after

I Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate

Description of Work to Date I Unit Unit Price Quantity(EqUipment Labor and Matelials)

INA

i J II

i 0 iJ i fl~ w

Method Subtotal

Local Forces Stele Forces oContract PECE

Report Number

K-071-LA-SRB-Freret

Sheet f 1__0 -~~-

FHWA Disaster Number Katrina

Inspection Date 050412010

Federal-aid Route Number

Local

I State County

LA Orleans

Cost

Completed Remaining

$0 $0

$0 $0 $01 $01 $0 1

$0 $0 $0 $0 $0 $0 $0

1

$01 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overl~stripping $56705QD 100 $567050 c ADA ramps Miscellaneous work such as manhole $0 0

$0p adjustments and curb and gutter replacement to be included III

~ only where required to accomodate patching and overtay $0gj $00 PECE included in estimate $0c Gl

$0c

~ $0 If $567~Method Subtotal

o Local Forces o State Forces III Contract PElCE $0

Right-of-Way I I Penn Repair Totals $567050 rEnvironmental Assessment Recommendation I (7) Categorical exclUSion n EAlEIS Estimated ToIal $567050 Recommendation FHWA Engineer 1r1-4AJJkned Form on File Date

1pound Eligible r Ineligible Mark Stinson PE r J W GrZtUO~-~~-~---~------~~-----~

State Engineer d~ L-~ Datel

~Concurrence Il Yes DNo Buzzv Wegener PE IA z-gt 10

I Concurrance Local Agenc ReprasentaUve J D I

Datel I i rYeS rNo

Form FHWA-1647 (Rev 4-98)

I

2panmen Report Number IDETAILED DAMAGE INSPECTION REPORT K()71-LA-SRB-Nashville iat Transportation (Title 23 Federal-ald Highways) Sheet IFldtllll Highway

__1_ of _~__ IAdmlnlstratlofl

Location (Name ofRoad and Milepost) FHWA Disaster Number

1Nashville from S Claiborne to Fountainbleau in Orleans Parish 058 miles in length Katrina

Includes 4 travel lanes and 2 parking lanes Inspection Date 050412010

DescriptionofDa~e Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 JLA Orleans

Cost Estimate

Description of Work to Date Unit Unit PrIce Quanllty Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

I $0

$0 iii I $0i

$0I

~I $0 (II

I $0El (II

$01~I $0

$0

$0

Method Subtotal $0 $0

o Local Forces o State Forces ocontract PEICE $0 $Oi Emergency RepaIr Total $0

I $Oi $0

Pavement patching Mill 4 and 4K HMAC overlay (2 miles) $0 Mill 2 and 2 HMAC overlay (38 miles) stripping $7261228 100 $726122

~ ADA ramps Miscellaneous work such as manhole $0 I I adjustments and curb and gutter replacement to be included $0i only where required to accomodate patching and overlay $0

$0 o

J PECE included in estimate $0 $0IV

E I $0 ~ $0

Melhod SUbtotal $726122

o local Forces State Forces III Contract PElCE $0

Right-of-Way

I i

Perm Repair Totels $726122 i Environmental Assessment Recommendation

V categorical Exclusion n EAlEIS Eslimated Total $726122 Recommendation FHWA Engineer A~ed Form [ij Date

IZ Eligible r Ineligible Mark Stlns~E fJtJJ LJ f C2ZJtJ i 1--- shy

State Engl~~ )~ Date I Concurrence IZ Ves ONo J--m (gt lt7 10BuzzvWe -7

Concurrence Local Agency Representative U

D Date

rVes [NO

Form FHWA-1547 (Rev 4-98)

---------------_ -___ shy

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment

01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)

Administration

Location (Name ofRoed end Milepost) FHWA Disaster Number

Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010

Description of Damage FeltIe1al-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate Description of Work to Data i Unit Unit Price Quantity

Cost

i (Equipment Labor and Materials) Completed Remaining i $0 NA $0

$0 i $O

iij 0 $0

1

~ $0 ~ $0r GI

i $02

~ $0

i 1 $01

1

$011 I $0 i

IMethod Subtolal $0 $Oi

o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I

1 I $0 -shyi $0

$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619

c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0

II $00

t=C PEICE included in estimate _ $0 ~ $0

~ $0 io $0

Method Subtotal f--shy $273619

o Local Forces o Slate Forces III Contract PEICE SO

Right-of-way

Perm Repair Totals $273619 Envilonmental Assessment Recommendation

V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date

(ttho 1

Il) Eligible I Ineligible Mark Stinson ~ 4 [l]

Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence

ONG Local Agency Representative

0 Date( I

I DYes

Form FHWA-1647 (Rev 4-98)

i-I

DETAILED DAMAGE INSPECTION REPORT us Department

rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon

location (Name ofROIJd and Milepost)

Report Number

K-071 -LA-SRB-Jefferson Oavis

Sheet __1 _ of 1__ _ _~

FHWA Disaster Number

Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length

I Includes 4 travel lanes and 2 parking lanes

Katrina

Inspection Date 05042010

DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

OS s maeC tEti t

Description of Work 10 Date Unit Unit PrIce

Cost (Equipment Labor and Materials) Quantity

Completed Remaining

$Oi NA

I $Oi -~

$0 $0 1

1 $0

I $0

~ $0 i(i $Oi

$0W

$0 $0

I $0

1

IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0

Emergency Repair Total $0 $0

j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100

c ADA rampS Miscellaneoua work such as manhole i

$478390

~O ~ I adjustments and curb and gutter replacement to be included

--~-

$0 S only where required to accomodate patchDg and overlay $01I $0IX

$0 1i PEiCE included in estimate

IJ $0

I $0 1

i shyI $0

I Method Subtotal $478390

I

o Local Forces o State Forces III Contract PEfCE $0

Rlght-ofmiddotWay

Penn Repair Totals $478390 Environmental Asse8llment Recommendation

I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390

I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I

DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI

Coneurtaf1(8 i Local Agency Representative U CJ Date I

I [J Yes r No

Form FHWA-1547 (Rev 4-98)

L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle

of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway

__1_ of _1__ Administration

ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina

i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date

i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~

Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate

DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt

(Equipment Labor and Matenals) Completed Remaining

$0 NA $0

$01

$01

l $Oi ~ $0 (S $0c ~i II)

$0

$0E W

$0 $0

$0

MethOd Subtotal $0 $01

o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0

Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0

$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i

c Miscellaneous work such as manhole $0

1adjustments and curb and gutter replacement to be included i $0-------

$0

Monly where required to accomodate patching and overlay

$0 1 bull PECE included in estimate $0CI)

$0til i $0 c i $0

MethOd Subtolal $658220

o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way

Perm RepairT08s $658220 Environmental Assessment Recommendation

R1 CategOrical Exclusion o EIVEIS Estimated~ $658220

i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i

2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf

BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve

D Date I IUYea nNo

Form FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department

of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)

Federal Hlahway (Title 23 Federal-aid Highways)

FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length

InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

1

between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans

Cost Estimate

CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining

$0

$0 $0

$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O

~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0

$0 $0

I $0

Method SubtOtal $0 $0

o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0

$0 $0

$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474

c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0

Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi

J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1

r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I

I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474

o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu

Recommendation IiJ Eligible

Concurrerue

Concurrence I rJ YelS DNO

Local Agency Repre5entatille - 0 IDatef

Form FHWAmiddot1647 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

bull pertmentof TransportationFedaral Highway Administration

DETAILED DAMAGE INSPECTION REPORT

(Title 23 Federal-ald Highways)

Location (Name ofRoad and Milepost)

1 Freret from Louisiana to Jefferson in Orleans Parish 094 miles in length Includes 2 travel lanes and 2 parking lanes

Description of Damage

Pavement deterioration due to submerged road andor debris hauling after

I Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate

Description of Work to Date I Unit Unit Price Quantity(EqUipment Labor and Matelials)

INA

i J II

i 0 iJ i fl~ w

Method Subtotal

Local Forces Stele Forces oContract PECE

Report Number

K-071-LA-SRB-Freret

Sheet f 1__0 -~~-

FHWA Disaster Number Katrina

Inspection Date 050412010

Federal-aid Route Number

Local

I State County

LA Orleans

Cost

Completed Remaining

$0 $0

$0 $0 $01 $01 $0 1

$0 $0 $0 $0 $0 $0 $0

1

$01 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overl~stripping $56705QD 100 $567050 c ADA ramps Miscellaneous work such as manhole $0 0

$0p adjustments and curb and gutter replacement to be included III

~ only where required to accomodate patching and overtay $0gj $00 PECE included in estimate $0c Gl

$0c

~ $0 If $567~Method Subtotal

o Local Forces o State Forces III Contract PElCE $0

Right-of-Way I I Penn Repair Totals $567050 rEnvironmental Assessment Recommendation I (7) Categorical exclUSion n EAlEIS Estimated ToIal $567050 Recommendation FHWA Engineer 1r1-4AJJkned Form on File Date

1pound Eligible r Ineligible Mark Stinson PE r J W GrZtUO~-~~-~---~------~~-----~

State Engineer d~ L-~ Datel

~Concurrence Il Yes DNo Buzzv Wegener PE IA z-gt 10

I Concurrance Local Agenc ReprasentaUve J D I

Datel I i rYeS rNo

Form FHWA-1647 (Rev 4-98)

I

2panmen Report Number IDETAILED DAMAGE INSPECTION REPORT K()71-LA-SRB-Nashville iat Transportation (Title 23 Federal-ald Highways) Sheet IFldtllll Highway

__1_ of _~__ IAdmlnlstratlofl

Location (Name ofRoad and Milepost) FHWA Disaster Number

1Nashville from S Claiborne to Fountainbleau in Orleans Parish 058 miles in length Katrina

Includes 4 travel lanes and 2 parking lanes Inspection Date 050412010

DescriptionofDa~e Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 JLA Orleans

Cost Estimate

Description of Work to Date Unit Unit PrIce Quanllty Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

I $0

$0 iii I $0i

$0I

~I $0 (II

I $0El (II

$01~I $0

$0

$0

Method Subtotal $0 $0

o Local Forces o State Forces ocontract PEICE $0 $Oi Emergency RepaIr Total $0

I $Oi $0

Pavement patching Mill 4 and 4K HMAC overlay (2 miles) $0 Mill 2 and 2 HMAC overlay (38 miles) stripping $7261228 100 $726122

~ ADA ramps Miscellaneous work such as manhole $0 I I adjustments and curb and gutter replacement to be included $0i only where required to accomodate patching and overlay $0

$0 o

J PECE included in estimate $0 $0IV

E I $0 ~ $0

Melhod SUbtotal $726122

o local Forces State Forces III Contract PElCE $0

Right-of-Way

I i

Perm Repair Totels $726122 i Environmental Assessment Recommendation

V categorical Exclusion n EAlEIS Eslimated Total $726122 Recommendation FHWA Engineer A~ed Form [ij Date

IZ Eligible r Ineligible Mark Stlns~E fJtJJ LJ f C2ZJtJ i 1--- shy

State Engl~~ )~ Date I Concurrence IZ Ves ONo J--m (gt lt7 10BuzzvWe -7

Concurrence Local Agency Representative U

D Date

rVes [NO

Form FHWA-1547 (Rev 4-98)

---------------_ -___ shy

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment

01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)

Administration

Location (Name ofRoed end Milepost) FHWA Disaster Number

Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010

Description of Damage FeltIe1al-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate Description of Work to Data i Unit Unit Price Quantity

Cost

i (Equipment Labor and Materials) Completed Remaining i $0 NA $0

$0 i $O

iij 0 $0

1

~ $0 ~ $0r GI

i $02

~ $0

i 1 $01

1

$011 I $0 i

IMethod Subtolal $0 $Oi

o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I

1 I $0 -shyi $0

$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619

c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0

II $00

t=C PEICE included in estimate _ $0 ~ $0

~ $0 io $0

Method Subtotal f--shy $273619

o Local Forces o Slate Forces III Contract PEICE SO

Right-of-way

Perm Repair Totals $273619 Envilonmental Assessment Recommendation

V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date

(ttho 1

Il) Eligible I Ineligible Mark Stinson ~ 4 [l]

Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence

ONG Local Agency Representative

0 Date( I

I DYes

Form FHWA-1647 (Rev 4-98)

i-I

DETAILED DAMAGE INSPECTION REPORT us Department

rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon

location (Name ofROIJd and Milepost)

Report Number

K-071 -LA-SRB-Jefferson Oavis

Sheet __1 _ of 1__ _ _~

FHWA Disaster Number

Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length

I Includes 4 travel lanes and 2 parking lanes

Katrina

Inspection Date 05042010

DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

OS s maeC tEti t

Description of Work 10 Date Unit Unit PrIce

Cost (Equipment Labor and Materials) Quantity

Completed Remaining

$Oi NA

I $Oi -~

$0 $0 1

1 $0

I $0

~ $0 i(i $Oi

$0W

$0 $0

I $0

1

IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0

Emergency Repair Total $0 $0

j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100

c ADA rampS Miscellaneoua work such as manhole i

$478390

~O ~ I adjustments and curb and gutter replacement to be included

--~-

$0 S only where required to accomodate patchDg and overlay $01I $0IX

$0 1i PEiCE included in estimate

IJ $0

I $0 1

i shyI $0

I Method Subtotal $478390

I

o Local Forces o State Forces III Contract PEfCE $0

Rlght-ofmiddotWay

Penn Repair Totals $478390 Environmental Asse8llment Recommendation

I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390

I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I

DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI

Coneurtaf1(8 i Local Agency Representative U CJ Date I

I [J Yes r No

Form FHWA-1547 (Rev 4-98)

L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle

of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway

__1_ of _1__ Administration

ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina

i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date

i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~

Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate

DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt

(Equipment Labor and Matenals) Completed Remaining

$0 NA $0

$01

$01

l $Oi ~ $0 (S $0c ~i II)

$0

$0E W

$0 $0

$0

MethOd Subtotal $0 $01

o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0

Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0

$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i

c Miscellaneous work such as manhole $0

1adjustments and curb and gutter replacement to be included i $0-------

$0

Monly where required to accomodate patching and overlay

$0 1 bull PECE included in estimate $0CI)

$0til i $0 c i $0

MethOd Subtolal $658220

o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way

Perm RepairT08s $658220 Environmental Assessment Recommendation

R1 CategOrical Exclusion o EIVEIS Estimated~ $658220

i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i

2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf

BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve

D Date I IUYea nNo

Form FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department

of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)

Federal Hlahway (Title 23 Federal-aid Highways)

FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length

InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

1

between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans

Cost Estimate

CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining

$0

$0 $0

$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O

~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0

$0 $0

I $0

Method SubtOtal $0 $0

o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0

$0 $0

$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474

c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0

Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi

J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1

r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I

I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474

o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu

Recommendation IiJ Eligible

Concurrerue

Concurrence I rJ YelS DNO

Local Agency Repre5entatille - 0 IDatef

Form FHWAmiddot1647 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

I

2panmen Report Number IDETAILED DAMAGE INSPECTION REPORT K()71-LA-SRB-Nashville iat Transportation (Title 23 Federal-ald Highways) Sheet IFldtllll Highway

__1_ of _~__ IAdmlnlstratlofl

Location (Name ofRoad and Milepost) FHWA Disaster Number

1Nashville from S Claiborne to Fountainbleau in Orleans Parish 058 miles in length Katrina

Includes 4 travel lanes and 2 parking lanes Inspection Date 050412010

DescriptionofDa~e Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 JLA Orleans

Cost Estimate

Description of Work to Date Unit Unit PrIce Quanllty Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

I $0

$0 iii I $0i

$0I

~I $0 (II

I $0El (II

$01~I $0

$0

$0

Method Subtotal $0 $0

o Local Forces o State Forces ocontract PEICE $0 $Oi Emergency RepaIr Total $0

I $Oi $0

Pavement patching Mill 4 and 4K HMAC overlay (2 miles) $0 Mill 2 and 2 HMAC overlay (38 miles) stripping $7261228 100 $726122

~ ADA ramps Miscellaneous work such as manhole $0 I I adjustments and curb and gutter replacement to be included $0i only where required to accomodate patching and overlay $0

$0 o

J PECE included in estimate $0 $0IV

E I $0 ~ $0

Melhod SUbtotal $726122

o local Forces State Forces III Contract PElCE $0

Right-of-Way

I i

Perm Repair Totels $726122 i Environmental Assessment Recommendation

V categorical Exclusion n EAlEIS Eslimated Total $726122 Recommendation FHWA Engineer A~ed Form [ij Date

IZ Eligible r Ineligible Mark Stlns~E fJtJJ LJ f C2ZJtJ i 1--- shy

State Engl~~ )~ Date I Concurrence IZ Ves ONo J--m (gt lt7 10BuzzvWe -7

Concurrence Local Agency Representative U

D Date

rVes [NO

Form FHWA-1547 (Rev 4-98)

---------------_ -___ shy

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment

01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)

Administration

Location (Name ofRoed end Milepost) FHWA Disaster Number

Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010

Description of Damage FeltIe1al-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate Description of Work to Data i Unit Unit Price Quantity

Cost

i (Equipment Labor and Materials) Completed Remaining i $0 NA $0

$0 i $O

iij 0 $0

1

~ $0 ~ $0r GI

i $02

~ $0

i 1 $01

1

$011 I $0 i

IMethod Subtolal $0 $Oi

o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I

1 I $0 -shyi $0

$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619

c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0

II $00

t=C PEICE included in estimate _ $0 ~ $0

~ $0 io $0

Method Subtotal f--shy $273619

o Local Forces o Slate Forces III Contract PEICE SO

Right-of-way

Perm Repair Totals $273619 Envilonmental Assessment Recommendation

V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date

(ttho 1

Il) Eligible I Ineligible Mark Stinson ~ 4 [l]

Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence

ONG Local Agency Representative

0 Date( I

I DYes

Form FHWA-1647 (Rev 4-98)

i-I

DETAILED DAMAGE INSPECTION REPORT us Department

rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon

location (Name ofROIJd and Milepost)

Report Number

K-071 -LA-SRB-Jefferson Oavis

Sheet __1 _ of 1__ _ _~

FHWA Disaster Number

Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length

I Includes 4 travel lanes and 2 parking lanes

Katrina

Inspection Date 05042010

DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

OS s maeC tEti t

Description of Work 10 Date Unit Unit PrIce

Cost (Equipment Labor and Materials) Quantity

Completed Remaining

$Oi NA

I $Oi -~

$0 $0 1

1 $0

I $0

~ $0 i(i $Oi

$0W

$0 $0

I $0

1

IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0

Emergency Repair Total $0 $0

j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100

c ADA rampS Miscellaneoua work such as manhole i

$478390

~O ~ I adjustments and curb and gutter replacement to be included

--~-

$0 S only where required to accomodate patchDg and overlay $01I $0IX

$0 1i PEiCE included in estimate

IJ $0

I $0 1

i shyI $0

I Method Subtotal $478390

I

o Local Forces o State Forces III Contract PEfCE $0

Rlght-ofmiddotWay

Penn Repair Totals $478390 Environmental Asse8llment Recommendation

I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390

I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I

DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI

Coneurtaf1(8 i Local Agency Representative U CJ Date I

I [J Yes r No

Form FHWA-1547 (Rev 4-98)

L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle

of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway

__1_ of _1__ Administration

ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina

i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date

i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~

Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate

DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt

(Equipment Labor and Matenals) Completed Remaining

$0 NA $0

$01

$01

l $Oi ~ $0 (S $0c ~i II)

$0

$0E W

$0 $0

$0

MethOd Subtotal $0 $01

o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0

Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0

$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i

c Miscellaneous work such as manhole $0

1adjustments and curb and gutter replacement to be included i $0-------

$0

Monly where required to accomodate patching and overlay

$0 1 bull PECE included in estimate $0CI)

$0til i $0 c i $0

MethOd Subtolal $658220

o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way

Perm RepairT08s $658220 Environmental Assessment Recommendation

R1 CategOrical Exclusion o EIVEIS Estimated~ $658220

i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i

2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf

BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve

D Date I IUYea nNo

Form FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department

of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)

Federal Hlahway (Title 23 Federal-aid Highways)

FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length

InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

1

between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans

Cost Estimate

CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining

$0

$0 $0

$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O

~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0

$0 $0

I $0

Method SubtOtal $0 $0

o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0

$0 $0

$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474

c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0

Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi

J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1

r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I

I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474

o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu

Recommendation IiJ Eligible

Concurrerue

Concurrence I rJ YelS DNO

Local Agency Repre5entatille - 0 IDatef

Form FHWAmiddot1647 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Fountainbleaurtment

01 T ransportlllion Sheet ___ of_1__ Federal Highwav (Title 23 Federal-aid Highways)

Administration

Location (Name ofRoed end Milepost) FHWA Disaster Number

Fountainbleau from Broadway to Nashville in Orleans Parish 035 miles in length i_Ka_tr~in~a__~_____-I Inspection DateIncludes 2 travel lanes and 2 parking lanes 050412010

Description of Damage FeltIe1al-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate Description of Work to Data i Unit Unit Price Quantity

Cost

i (Equipment Labor and Materials) Completed Remaining i $0 NA $0

$0 i $O

iij 0 $0

1

~ $0 ~ $0r GI

i $02

~ $0

i 1 $01

1

$011 I $0 i

IMethod Subtolal $0 $Oi

o Local Forces o SIaIe Forces Deontract PEiCE $0 $0 i Emergency Repair Total $01I

1 I $0 -shyi $0

$01 Pavement patching Mill 2 and 2 HMAC overlay stripping $2736191i 100 $273619

c i ADA ra2s Miscellaneous work such as manhole $0j i adjustments and curb and gutter replacement to be Included $0 only where required to accomodate patching and overlay $0

II $00

t=C PEICE included in estimate _ $0 ~ $0

~ $0 io $0

Method Subtotal f--shy $273619

o Local Forces o Slate Forces III Contract PEICE SO

Right-of-way

Perm Repair Totals $273619 Envilonmental Assessment Recommendation

V Categorical Exdusion n ENEIS Estimated Total $273619 Recommendation FHWA Engineer ~~ ~gned Fonn on File Date

(ttho 1

Il) Eligible I Ineligible Mark Stinson ~ 4 [l]

Concurrence State Engineer ~~~(~ J [l] Date f 1Ii Yea DNo Buzzy Wegener PE (r -r (o ~) 0 Concurrence

ONG Local Agency Representative

0 Date( I

I DYes

Form FHWA-1647 (Rev 4-98)

i-I

DETAILED DAMAGE INSPECTION REPORT us Department

rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon

location (Name ofROIJd and Milepost)

Report Number

K-071 -LA-SRB-Jefferson Oavis

Sheet __1 _ of 1__ _ _~

FHWA Disaster Number

Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length

I Includes 4 travel lanes and 2 parking lanes

Katrina

Inspection Date 05042010

DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

OS s maeC tEti t

Description of Work 10 Date Unit Unit PrIce

Cost (Equipment Labor and Materials) Quantity

Completed Remaining

$Oi NA

I $Oi -~

$0 $0 1

1 $0

I $0

~ $0 i(i $Oi

$0W

$0 $0

I $0

1

IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0

Emergency Repair Total $0 $0

j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100

c ADA rampS Miscellaneoua work such as manhole i

$478390

~O ~ I adjustments and curb and gutter replacement to be included

--~-

$0 S only where required to accomodate patchDg and overlay $01I $0IX

$0 1i PEiCE included in estimate

IJ $0

I $0 1

i shyI $0

I Method Subtotal $478390

I

o Local Forces o State Forces III Contract PEfCE $0

Rlght-ofmiddotWay

Penn Repair Totals $478390 Environmental Asse8llment Recommendation

I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390

I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I

DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI

Coneurtaf1(8 i Local Agency Representative U CJ Date I

I [J Yes r No

Form FHWA-1547 (Rev 4-98)

L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle

of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway

__1_ of _1__ Administration

ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina

i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date

i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~

Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate

DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt

(Equipment Labor and Matenals) Completed Remaining

$0 NA $0

$01

$01

l $Oi ~ $0 (S $0c ~i II)

$0

$0E W

$0 $0

$0

MethOd Subtotal $0 $01

o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0

Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0

$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i

c Miscellaneous work such as manhole $0

1adjustments and curb and gutter replacement to be included i $0-------

$0

Monly where required to accomodate patching and overlay

$0 1 bull PECE included in estimate $0CI)

$0til i $0 c i $0

MethOd Subtolal $658220

o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way

Perm RepairT08s $658220 Environmental Assessment Recommendation

R1 CategOrical Exclusion o EIVEIS Estimated~ $658220

i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i

2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf

BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve

D Date I IUYea nNo

Form FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department

of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)

Federal Hlahway (Title 23 Federal-aid Highways)

FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length

InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

1

between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans

Cost Estimate

CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining

$0

$0 $0

$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O

~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0

$0 $0

I $0

Method SubtOtal $0 $0

o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0

$0 $0

$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474

c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0

Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi

J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1

r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I

I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474

o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu

Recommendation IiJ Eligible

Concurrerue

Concurrence I rJ YelS DNO

Local Agency Repre5entatille - 0 IDatef

Form FHWAmiddot1647 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

i-I

DETAILED DAMAGE INSPECTION REPORT us Department

rJ== (TiUe 23 Federal-aid Highways)Admlnl$tra1lon

location (Name ofROIJd and Milepost)

Report Number

K-071 -LA-SRB-Jefferson Oavis

Sheet __1 _ of 1__ _ _~

FHWA Disaster Number

Jefferson Davis from Gravier to Canal in Orleans Parish 051 miles in length

I Includes 4 travel lanes and 2 parking lanes

Katrina

Inspection Date 05042010

DescrIpI---io-n-o-fDa-m-ag-e------------------------j-Federal-ald Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

I between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

OS s maeC tEti t

Description of Work 10 Date Unit Unit PrIce

Cost (Equipment Labor and Materials) Quantity

Completed Remaining

$Oi NA

I $Oi -~

$0 $0 1

1 $0

I $0

~ $0 i(i $Oi

$0W

$0 $0

I $0

1

IMethod Subtotal $0 $Oi o local Forces D State Forces DContract PEiCE $0 $0

Emergency Repair Total $0 $0

j $0 I $OLavement patching Mill 2 and 2 HMAC overll stripping I $4783908 100

c ADA rampS Miscellaneoua work such as manhole i

$478390

~O ~ I adjustments and curb and gutter replacement to be included

--~-

$0 S only where required to accomodate patchDg and overlay $01I $0IX

$0 1i PEiCE included in estimate

IJ $0

I $0 1

i shyI $0

I Method Subtotal $478390

I

o Local Forces o State Forces III Contract PEfCE $0

Rlght-ofmiddotWay

Penn Repair Totals $478390 Environmental Asse8llment Recommendation

I7l CategOl1cal Exclusion DEAlEIS EsUmated Total $478390

I Recommendation FHWA Engineer I~Igned Form on FIle I Date III EUgible o Ineligible Mark Stins~ Miff11 A W fiztt()I

DaZJ7JIConcurrance fl Yes DNo StateE~~~~~ JU]J3uzzi W8Qe sr AgtI

Coneurtaf1(8 i Local Agency Representative U CJ Date I

I [J Yes r No

Form FHWA-1547 (Rev 4-98)

L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle

of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway

__1_ of _1__ Administration

ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina

i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date

i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~

Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate

DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt

(Equipment Labor and Matenals) Completed Remaining

$0 NA $0

$01

$01

l $Oi ~ $0 (S $0c ~i II)

$0

$0E W

$0 $0

$0

MethOd Subtotal $0 $01

o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0

Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0

$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i

c Miscellaneous work such as manhole $0

1adjustments and curb and gutter replacement to be included i $0-------

$0

Monly where required to accomodate patching and overlay

$0 1 bull PECE included in estimate $0CI)

$0til i $0 c i $0

MethOd Subtolal $658220

o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way

Perm RepairT08s $658220 Environmental Assessment Recommendation

R1 CategOrical Exclusion o EIVEIS Estimated~ $658220

i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i

2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf

BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve

D Date I IUYea nNo

Form FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department

of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)

Federal Hlahway (Title 23 Federal-aid Highways)

FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length

InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

1

between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans

Cost Estimate

CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining

$0

$0 $0

$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O

~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0

$0 $0

I $0

Method SubtOtal $0 $0

o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0

$0 $0

$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474

c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0

Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi

J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1

r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I

I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474

o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu

Recommendation IiJ Eligible

Concurrerue

Concurrence I rJ YelS DNO

Local Agency Repre5entatille - 0 IDatef

Form FHWAmiddot1647 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

L Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Bienvllle

of Tranaportallon (TItle 23 Federa-aid Highways) SheetFaderli Highway

__1_ of _1__ Administration

ILocation (Name ofROBd and Mi~st) FHWA Disaster Number Katrina

i Bienville from Jefferson Davis to Carrolton in Orleans Parish 046 miles in length Inspection Date

i Includes 4 travel lanes and 2 parking lanes 050412010--IDescription ofDamage F_~_~

Pavement deterioration due to submerged road andor debris hauling after Local 1-------shyHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans I Cost Estimate

DescI1ption of Wor1llo Date Unit Unit Price Quantity Colt

(Equipment Labor and Matenals) Completed Remaining

$0 NA $0

$01

$01

l $Oi ~ $0 (S $0c ~i II)

$0

$0E W

$0 $0

$0

MethOd Subtotal $0 $01

o Local Forces o Slate Forces DContract PECE $0 $0 Emergency Repair Total $0

Mill 2 and 2 HMAC overlay (23 miles) $0 Mill 4 and 4 HMAC overlay (23 miles) i $0

$0 Pavement patching ADA Ramgt stripping $65822Ori 100 $658220 i

c Miscellaneous work such as manhole $0

1adjustments and curb and gutter replacement to be included i $0-------

$0

Monly where required to accomodate patching and overlay

$0 1 bull PECE included in estimate $0CI)

$0til i $0 c i $0

MethOd Subtolal $658220

o Local Forese o State ForctNI III Contract FECE $0 Right-of-Way

Perm RepairT08s $658220 Environmental Assessment Recommendation

R1 CategOrical Exclusion o EIVEIS Estimated~ $658220

i Recommendation FHWA Engineer ~ned Form on Date i III Eligible C ineligible Mark $tlnson ~1114 f11171 [l] (zZr i

2---rf-m Datero72)7V rConcurrence III Yes DNa Slate Engineer itf

BuzzvWegener PE CoIlcurrence Local fgerq Represenlatlve

D Date I IUYea nNo

Form FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department

of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)

Federal Hlahway (Title 23 Federal-aid Highways)

FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length

InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

1

between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans

Cost Estimate

CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining

$0

$0 $0

$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O

~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0

$0 $0

I $0

Method SubtOtal $0 $0

o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0

$0 $0

$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474

c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0

Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi

J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1

r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I

I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474

o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu

Recommendation IiJ Eligible

Concurrerue

Concurrence I rJ YelS DNO

Local Agency Repre5entatille - 0 IDatef

Form FHWAmiddot1647 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPEC1ON REPORT K-071-LA-SRB-BanksUs Department

of Transportation Sheet Administration __1_ of_1__ location (Name ofRoad and Milepost)

Federal Hlahway (Title 23 Federal-aid Highways)

FHWA DlsalSter Number KatrinaBanks from Carrolton to St Patrick in Orleans Parish 052 miles in length

InlSpectlon DateIncludes 4 travel lanes and 2 parking lanes 050412010 De$cripion of Damage Federal-ald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

1

between FHWA Division and LDOTD Field review conducted on 5142010 LA Orleans

Cost Estimate

CostDescription of Work to Date Unit Unit Price 1 Quantity(Equipment Labor and Materials) Completed Remaining

$0

$0 $0

$0 II ~ ~~-----------------------------------+--~------+-------~--------~------~~ ~ $0~----------------------------+-~~----~------4----------+------~~ ~~__________________________+--+____~----~------_+------~$O

~~----------------------------~_r----_+------r_------_+------~$~O ~~ ------------------------------b__+----~------~--------_r-------$~0

$0 $0

I $0

Method SubtOtal $0 $0

o Local Forces o State Forces DContract 00 PEICE $0 $0 Emergency Repair Total $0

$0 $0

$0 i Pavement patching Mill 2 and 2M HMAC overlav stripping $6524741i 100 $652474

c i ADA ramps Miscellaneous work such as manhole $0 g i adjustments and curb and gutter replacement to be included $0 s i only where required to accomodate patching and overlay $0

Ii ~ c~P~8~C~E~ln~Clu-d~ed~ln-e-~~im-me----------------------~-4-------+------~--------------------i$~O ~Imiddot __________________~~--~--~----------~$~OEgt- $0amp~----------------------------------~--~------+-------~------------------~$~Oi

J--M-e-th-od----------~ ____~~_~__~~_J~_____L -~ ~L------S-U-btota--I~====~$c=6~-=c5~2=4~7==4I 1

r7I Contract PEICE I ___~$O~I I I Local Forces 0 State Forces ILJ __Right-of-Way J------- -_-_____I

I I Perm RepalrTotaI5 $652474 Environmental Assessment Recommendation I (Z Categorical ExdulSion n EAJEIS Estimated Total $652474

o lnertglble FHWA Engineer _ A bull sectigned Form on File Da~ L_ _ ~ Mark Stinso~tA4 ~1--JI m (ilu

Recommendation IiJ Eligible

Concurrerue

Concurrence I rJ YelS DNO

Local Agency Repre5entatille - 0 IDatef

Form FHWAmiddot1647 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

__

I Report Number12_ DETAILED DAMAGE INSPECTION REPORT I Kmiddot071-LA-SRB-CityPark

r~~~~ (Title 23 Federal-ald Highways) Sheet __1_ of 1__

Location (llame ofRoad and Milepost) Admlniltratlon

FHWA Disaster Number KatrinaCity Park Ave from Canal to Orleans in Orleans Parish 050 miles in length

Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010 DeSCrfptlon of Damage Federalmiddotald Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement state County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate

Descr1ption ot Wort to Date CostUnit Unit PriCe

1 1I (Equipment Labor and Materials) Quantity I-Com----pleted------~Re-m-a~In-Ing---i

$0 NA

~ ~

a~----------------~+---~--r---~----=~ 1 SO

C~~i----------------------~-r----r_----_r------r_---~$~O~ $0 ~~------------------------------r--i_-----t_------i_------_1--------~~ $0 w~------------------------------r-i----~-------T-----~------~$~O

$0I

Method Subtotat $0 $OJ ~-----~~-------~o Local Forces o State Forces oContract PEICE I ______---$0t-___-$~O

Emergency Repair Total- $0

$0 $0 $0

i Pavement patching Mill 2 and 2 HMAC overl~ stripping $470 008D 100 $470 008 C ADA rams Miscellaneous work such as manhole $0i i adjustm~ts and curb and gutter replacement to be Included $0 i S only where required to accomodale patching and overlay $0 iI ~I~~iP~B~C~E~I~nc~lu-d~ed~in-e~~~middotm-a7~-------------------~r--+-------~i------f-----_-~~_-~~~~~~~====~$O~I ~ $0 ~ ---------------j--i---------- $01-

~~--------------------------------~-r------t-----~-------------------~$O~ ~~~------------------------------L-~------~middotmiddotmiddotmiddotmiddot------~----~S~~~~~II-~_-_-~~$4~~7~0~OO~lAl8~ Method shy

o Local Forces o State Forces III Contract PBCE~--------$=O~ Rlght-ot-Way 1--_____--

Perm RepairTo~1S $470008 I Environmentat Assessment RecommendationI III Categorical ExtIusion 0 EAlEIS Estimated Total $470008 I Recommendation FHWA Engineer S~ed Form on File Date ~_ i I III Eligible o Ineligible MarkStlnsonPJr2f1dA ~ m tUJO Concurrence State Engineer Vl L J r71 Da~ 1-3 1 0 IIII Yes DNo BUZZYWegener~~( - ~yLLJ Il 1 Concurrence Local Agency Representative V 0 Date 1 I

[J Yes DNo i

Form FHWAmiddot1647 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

bull Report Number DETAILED DAMAGE INSPECTION REPORT K~071-LAmiddotSRB-Esplanadeus Department

of Transportation (Title 23 Federal-ald Highways) SheetFtdn HlghWlly

__1_ of 1Admlnistrltion

Location (Name ofRoad end Milepost) FHWA Disaster Number

Esplanade from Moss to N Claiborne In Orleans Parish 155 miles in length Katrina Inspection DeteIncludes 4 travel lanes and 2 parking lanes 051042010

Description of Damage Federel-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

I Cost Estimate

Description of Work to Date Unit Unit Price QuantitY Cost

(Equipment Lebor and Materials) i Completed Remaining

$0 iNA $0

$0 $0

i $0I $0

~ $0Ii $02l

~ I $0w $0 $0

i $0

IMethod SUbtotal $0 $0 o Local Forces State Forces DContract PEICE $0 $0

j Emergency Repair Total $0

i $0 $0 $0

bull Pavement patching Mill 2 and 2 HMAC overlay stripping $17752ii 100 $1775277 ~ IADA ramps Miscellaneous work such as manhole $0 ~ i adjustments aod curb and gutter replacement to be included $0

bull only where required to accomodate patching aod overlay $0I i $0 C PECE included in estimate $0 i ~---

$0 E $0 ~ $0

Method Subtotal $1775277

o Local Forces Stete Forces III Contract PEtCE SO Right-of-way

I Penn Repair Totals $1775277

Environmental Assessment RecommendatiOn III Categorical exclusion DEAlEIS Estimated Total $1775277

Recommendation FHWA Engineer 1A ~ned FOIm on File Date III Engibe o Inefigible Mark Stlnso~ iIf 0 cPZ24

Concurrence III Yes DNo Stale Engineer ) ~1 1 o Dv3oBuzzy Wegenhr~e 71

Concurrence Local Agency Representative Date7 I

C Yes DNa D Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-lAsRB-Basinus Oepertrnenl -shyof TI1I~ortaIlon (TItle 23 Federal-aid Highways) SheetFadenII ighway 1 of 1AdmlnlatnltlOll -

Location (Nama ofRoad and MHepost) FHWA DIsaster Number

Basin from Canal st to N Villere in Orleans Parish58 miles in length Katrina

Inspection DateIncludes 6 travel lanes and 2 parking lanes 05042010 Descrtpllon of Damage Federal-aid Route Number

i Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrinamiddot Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans I

Cost Estimate I Description of Work to Date

Unit Unit Price Quantity I Cost (Equipment Labor and Maieriels) Completed Remaining

$0 NA $0

i $0

$0

JI $0 1

$0 lr $0i

$0EI ~ I $0

UJ $0 $0 $0

Method Subtotal $Oi $Oj o Local Forces o Stete Forces Dcontract PECE $0 $01

IEmergency Repair Total I $0 -1--

i $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlav stripping $8846~ 100 $884663 c ADA ramps Miscellaneous work such as manhole $0 ~ I adjustments and curb and gutter replacement to be included $0 S bull only where required to accomodate patching and overlaybull J-

$0 GIa I $01 PEfCE Included in estimate $0

$0 EJ

----~~----

$0 ~ $0_--_

Method Subtotal $884663

o Local Forces D State Forces tZl Contract PECE $0

Right-of-Way I Perm Repair Totals $884663Ienvironmental Assessment Recommendation

III Categorical Exclusion OENEIS Estimated Total $884663 Recommendallon =nglneer lJned Form on File

D212110III Eligible C Ineligible tinso~f1il JII1f~ A [Z] Concurrence State Engineer J~ IA Date

IIII Ves DNo tshy [Z] Z--7 0Buzzy Wegener f

Concunence Local Agency Representative D Da1 7 1Dves nNo I

Form FHWAmiddot1547 (Rev 4middot98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

us Depar1ment of TraMportation

DETAILED DAMAGE INSPECTION REPORT Report Number

K-071-LA-SRB-Rampart

(TiUe 23 Federal-aid Highways) Federal Hlthway __1 _ of Admlntatratlon

Sheet

Location (Name ofRoad and MHep~t) FHWA Disaster Number

Rampart from Iberville to Esplanade (8 miles) and from Esplanade to Elysian Fields (46 miles) --K_at_r--n_B--_______ in Orleans Parish Includes 4 travel lanes and 2 parking lanes InspeClion Date

05042010 j

~~~~~-----------------------------------------------4_---~~~-----~~OeSCliptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreementI I between FHWA Division and LDOTO Field review conducted on 5412010

IState County

LA Orleans I

Cost Estimate

DescripflOn of WoIk to Date Unit Unit Price I Quantity

Cost (Equipment Labor and Materials)

Compleled Remalning

$Oi INA $0 i $0 I $0

i I $0c ~ $0 ~ $0r

~ $0

~ $0

$0 $0

Method Subtotal i $0 $0 o local FOfC$$ o Slate Forces oContract PECE $0 $0

Emergency Repair Total $0 $0 $0 $0

Pavement patching Mill 2 and 2 HMAC overlay stripping $12597fij 100 $1259785i ADA ramps Miscellaneous work such as manhole SO ~djustments and curb and gutter replacement to be included $0

only where required to accomodate patching and overlay $0 ~i $0I PEICE c~ded ~ tim $0

$Of $0

0 $Oj Method Subtotal $1259785

D Local Forces D Slale Forces III Cannet PElCE

f-----shy $01 Right-of-Way

Penn Repair Totals $1259785 Environmental Assessment Recommendation

III Categorfcal Exclusfon DEAlEIS Estimated Total $1259785 Reoommendatlon FHWA En~~ Signed Form on File Data

rll Eligible o Ineligible Mark Stln bull PE ~Abull 4~ W crZZ0 Concurrence

Stale Englneef e~ -shy Data f III Ves No Buzzy Weaener PE ~---- W ( L-JIO

Concurrence LOcal Aqency RepresentatiVe lt

D Date I 7 rVes LiNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

11= Repolt Number -

DETAILED DAMAGE INSPECTION REPORT K-071middotLAmiddotSRBmiddotForstall I 01 Transportation

(Title 23 Federal-ald Highways) SheetFederal Highway __1_ of 1

I Administration Location (NINTIfI ofRoad and Milepost) FHWA Disaster Number

Forstall from Douglas St to N Claiborne (42 miles) in Orleans Parish Katrina I

Includes 2 travel lanes Inspection Date 050412010 I

Oescription of Damage I Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County Ibetween FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate I

Description of Work to Date Unit Unit Price Quantity Cost

(Equipmen~ Labor and Materials) Completed Remaining $Oi

NA $0

$0

$0

$0

$0 ~ $01c ~ $0 ~i $0

W $0

$0

$0

Melhod Subtotal $0 $0

Local Forces o State Forcas Dcontract PECE $0 $0 I

Emergency Repair Total $0

$0

I $0 $0

Pavement patchina Mill 2 and 2 HMAC overlay stripping $22633BJd 100 $226338 c ADA ramps Miscellaneous wor1lt such as manhole $02

adjustments and curb and gutter replacement to be included $0~

only where required to accomodate patching and overlay $0 $0

C PEICE included in estimate $0 QI

$0c 111

E $0 ~ $0

Melhod Subtotal $226338

C Local Forces State Forces III Contract PElCE -r0 Right-of-Nay

Perm Repair Totals $226338 Environmental Assessment Recommendation

I7i Categortcal Exclusion n EAlEIS Estimated Total $226338 Recommendation FHWA Engineer 1 Signed Form on File

Oete2I rz Eligible r Ineligible Mark Stinson fEMAA ~~ [l] ( tIIJ Concurrence State Engineer n1~ L I [l] Date 1Il Yes No

Buzzv WeDen bull t - b 1 ~ 4 Concurrence Local Agency Representative U o IDatE(

I ryes rNo

Form FHWAmiddot1647 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number

fEpartment DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Tupelo 01 TlllnlPQftatlon

(Title 23 Federal-aid Highways) Sheet Ftcleral HIghway 1 of 1bull Administration

Location (NaTM of Roacland Milepost) FHWA Disaster Number KatrinaI Tupelo 8t from Douglas 8t to 81 Claude Ave (44 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010IIDescription of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

I Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orfeans

Cost Estimate

Description of Work to Date i CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$O NA $0

$0 $0

I $0 $01

~ $0c Q)

$021 ~ $0w

$01 $0 $0 1

Method Subtotal $0 $0 Local Forces State Foroes oContract PECE $0 $0

Emergency RepairTotel $0 $0

$0 $0 Pavement patching 2 overlay stripping Shldr aggregate $2032228 100 $203222

c ADA ramDS Miscellaneous wor1lt such as manhole ~O0 i adjustments and curb and gutter replacement to be included $0 ~ i only where required to accomodate patohing and overlay $0

I $0 E PEiCE Included In estimate $0CD

$0c co E $0 cf $0

Me1hod Subtotal $203222

o local Forces State Forces III Contract PEiCE $0

Right-of-Way 1-------------1 Perm Repair Totel$ $203222middot

Environmental Assessment Recommendation i I7i Categorlcel Exclusion [J EAlEIS Estimated Total $203222k--

FHWA Engineer MA ArI Signed Form on File DateRecommendation (2tboIII Eligible C Ineligible Mark Stlnso~ A shy [7J i

Concurrence StateEngin~ y [7J Date IshyMrYes DNa BuzzvWe t -u7 0 I Concurrence Local Agency Representative

D Da f

IDYes DNo Fonn FHWAmiddot154T (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

I

I Report Numbermiddotlpartm8nt DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-St Bernard of Tral18po1tation (Title 23 Federal-ald Hlgh--) SheetFldara HighWay ---1-

I

Admlnllltrlltlon __1_ of ~1~_ Location (Name of Road and Milepost) FHWA Disaster Number

KatrinaSt Bernard from N Rampart to Sere (18 miles) in Orleans Parish IIfl8pection DateI Includes 4 travel lanes and 2 parking lanes I 05041201 0

Descliption of Damage Federal-aid Route NUmber

I I

i

I

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 542010

Cost Estimate I Dascriptlon of Work to Date Unit Unit Pr1ce Quantity(Equipment Labor and Materials)

NA

I

11 til

ia

~ ~ ~ w

I

[Method Subtotal

o Local Forces o State Forces Dcontract PEfCE i

Local

State County

LA Or1eans

C05t

Completed Remaining

I

-I

$0 $0

Emergency Repair Total

I I

$0 $0 1

$0 $0 $0 $0 $0 $0 1

$0 1

$0 $0 $0

$0 $0 $0 $0 $0 $0

$17633ji --~-

$1763320 II Pavement patching 2 mill and 2 HMAC overlay stripping 100

5 ADA ramps Miscellaneous work such as manhole ~O adjustments and curb and gutter replacement to be included SOshy

$0 I only where required to accomodate patching and overlay $0

i rPEICE included in estimate $0 c $0

i $0

$17633~~1I~ Method Subtotal

o Local Forceamp o State Forceamp III Contract PEJCE SO

i Right-of-Way

I Perm RepeifTotals $1763320 IEnvironmental As5e5ampment Recommendation

I7J Categorical Exclusion o EAlEIS Es1Imaled Total $1763320 r-ReCommendation FHWA Engineer m)~Igned Form 0 Date

I III EligIble [J Ineligible Mark Stlnso~ A4 - f (22110 IConcummoe III Yes DNo State EnoiNlMI 7 1---

Buzzy Wage er ~ ClJ ~7~JoiCOIICUmlllCe

CYe5 CNo Local Agency Representafive v D Date I f

i Fonn FHWAmiddot1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

DETAILED DAMAGE INSPECTION REPORT

(TIUe 23 Federal-ald Highways)

Report Number

K-071-LA-SRB-Gentllly

Sheet __1_ 01_1__

Location (Name ofRoad and Milepost) FHWA Disaster Number KatrinaGentilly Blvd from Paris to Broad (93 miles) in Orleans Parish

i Oescripton of Work 10 Oate Unit Price QuantityUnit(Equipment Labor and Materials)

I NA

i l 01

il G)

E w

Method Subtotal

i D Local Forces D Stale Forces PEiCE

Cost

Completed Remaining

$0 $0

I

I

$0 $0 $0 $0 SO $0 $01 $O $0 $0 $0 $0 1

$O $0Dcontract

Emergency Repair Total $0 $01

f- $0

i SO Pavement patching 2 mill and 2 HMAC overlay stripping $11567amp1 100 $1156703

c ADA ramps Miscellaneous work such as manhole $0 0

bull adjustments and curb and gutter replacement to be included $0 i only where required to aecomodate patching and overlay $0

ampI $0 E bull PECE included in estimate $0 ~ $011)

ii $0 oi $0

MeIhod Subtotal $1156703

Local Forces D State Forces III Contract PElCE SO

Right-of-Way

Perm Repair Totals $1156703 Environmental Assessment Recommendation

II III Categorical Exclusion o ENEIS Estimated Total $1156703 bull

Recommendation FHWA Engl~~Aj Signed Form on File DaG2ZUOI III Eligible o Ineligible Mark Stlnso bull P L~ 0 Concurrence State Englneer~A

~ 0 Datel gtItI ll Yes No 12 -z) DI _ Buzzy ~e bull PE bullIConcurrence Local Agency Representative 0 DatEt I

[lVes eNo

Includes 6 travel lanes and 2 parking lanes Inspection Date 05042010

DescriptIon of Damage

Pavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010

Fecleral-aid Route Number

Local

State County

LA Orleans

Cost Estimate

Fonn FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

I Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRS-Filmore 1 us Oapartmenl

of TranspOl1ation Sheet Administration i Federal Highway (Title 23 Federal-aid Highways)

__1_ Of_1__

loltatlon (Name of Road and Milepost) FHWA Disaster Number Katrina IFilmore from West End to Canal (39 miles) in Orleans Parish

Inspection Dete Includes 2 travel lanes and 2 parking lanes 05042010 I

Descrtptlon of Demage Federal-aid Route Number

LocalIPavement deterioration due to submerged road andor debris hauling after i Hurricane Katrina Pavement meets submerged roads criteria per agreement between FHWA Division and LDOTD Field review conducted on 5412010i

State

LA

County

Orleans

Cost Estimate

l ~t IDescr1ptlon of Wort to Date Unit Unit Pnce a ntlty I

(Equipment Labor and Materials) ua Completed Remaining i -~~----l-----l---+-~~~

I $01 NA $0

$01 $0 ~

~~----------------------------~--~----+-----~--------+-----~~ ampI f------------------t--+---+-----+------r-----$~Oi

~

J~------------------------------~--+------+------4---------~-------7~~ $0 $0 $0

$0Emergency Repair Total

Method Subtotal $0 $0 I -------~~-------~ o Local Forces o State Forces DContract PEICE 1-_____$0+-~_______$j01

$01 $0 $0

Pavement patching 2 HMAC overlay stripping 1$241 766Ii 100 $241 766 c ADA ramps Miscellaneous work such as manhole $0 ~~a~dJ~middotu=st~m~en~~~an~d~c~u~rn~a~nd~gu=tt=er~~~p~la=ce~m~en~t~ro~b~e~in~c~lu=d~ed~~~------+-------~-----------------~$~Oi only whe~ ~Quired ro accomooate patching and overlay $$~

oc~middot________~__--------------------_-+--__--+_-----~------------__----~I PEiCE included in estimate ~

$0~~--------------------------------~---~----~------~------------------~$~OL _________________________I-_______ci ---------L---------c------------~

Method Subtotall---_---=$241J7~6~6I PE~E~______~$Oo Local Forces o Slate Forces III Contract

Right-of-VVay 1---________

Perm Repair Totals i

$241766I Environmental Assessment Recommendation

Ili categorical Exclusion 0 EAlEIS $241766Estimated Total Recommendation FHWA Engineer A digned Fonn on File iDe h_

rili EHgible D lnerlgibie Mark Stinsor(1fS JiJ D~_ 0 (eJZltJ Concurrence i State Engineer 2 11 A DateT III Yes

i Buzzy Welenr~P~ tJ- - -J--0 r h3 116 Concurrence i Local Agency Representative D Date7 7

DyesI Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Ilpartmn Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Filmore2

of Tranaportelion (Title 23 Federal-ald Highways) bull SheetI Feder1 Hlg~y

__1_ of _1__I Admlnltrdon

bull Location (Name ofRoad and MIlepost) FHWA Disaster Number I

Filmore from Marconi to Wisner (84 miles) in Orleans Parish Katrina

Includes 2 travel lanes IlISpection Date 051042010

Description of Damage Federal-aid Route Number

I Pavement deterioration due to submerged road andor debris hauling after Local

1 Hurricane Katrina Pavement meets submerged roads criteria per agreement State Counly I between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit Unit Pr1ce Quanlily

Cost (Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

I I $0 III

$0I $0 i $0c ~ $0 ~ I $0w

$0

$0

$0

Method Subtotel $0 $0

o Local Forces State Forces DContract PECE i $0 $0 Emergency Repair $0

I $0

$0 I $0

Pavement patching 2 AC overlay surfaceyrep stripping $332515d 100 $3325151 c Miscellaneous work such as manhole $0

Q adJustments and curb and gutter replacement to be Included $0

~ only where required to accomodate patching and overlay $0$ $0C PEICE included In estimate $0CI)

I $0c t1I

$O-sectICI)

$00

Method Subtotal $332515 bull

Local Forces o State Forces III Contract IoPECE $0 Right-ofmiddotVVay L

I Perm Repair Totals bull $332515 Environmental Assessment Recommendation

(l Categorical Exclusion D ENEIS Estimated Total $332515 Recommendation FHWA Engineer JL Signed Form on File

Date6271t)I III Eligible n Ineligible Mark StillsonfPE- )l1A1J uIr shy W Concurrenlte State Engineer ) V I~ vJ

I --f4d Date~ lshyi Il Yes DNa Buzzy WegenlrP~ [hl b 7) QI Concurrenlte local Agency Representative DDateI I

~Yes rNo I Fonn FHWA-1547 (Rev 4middot98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

0gt Repor1 Number

IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-RobertELeeu$ Department or rlllfl$portalion

(Title 23 Federal-ald Highways) Sheet Fed_I Highway __1_ Of_1__bullAdmlnlatratlon

Location (Name ofRoecJ end Milepost) FHWA Disaster Number

Robert E Lee from Elysian Fields to Franklin (53 miles) in Orleans Parish Katrina Inspection Dale lIncludes 4 travel lanes and 2 parking lanes 050412010 I

DescI1pIion of Damege Fedenll-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

HUrricane Katrina Pavement meets submerged roads criteria per agreement State ~ between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate i

Description of WOfk to Date Unit Unit Price Quantity

Cost (Equipment Labor and Materiall) Completed Remaining

$0 NA $0

$0 $0

Ii $0 $0

~ $0 41)

$0~Ir $0UJ

$0

$0 $0

Method Subtotal $0 $0 o Local Forces o State Forces Dcontlact PEiCE $0 $0

Emergency Repair Total $0 $0 $Oj SO

$5624s6di -~-~-- --~ I

i Pavement patching 2 mill and 2 HMAC overlay stripping 1QO $562456 r ADA ramps Miscellaneous worK such as manhole I $01 ~ I adjustments and curb and gutter replacement to be included SOli only where required to accomodate patcilina and overlay $0

=I0 1 i PEICE included in estimate

f $0

I $01 amp $0

~d SubtotaJ $562456

o Local Forces D Stata Forces III Contract PElCE $0 Right-of-lNay

I Pelm Repair Total $562456 Environmental AsseMment Recommendation

III Categortcal Exclusion DENEIS Eltlmatelti Total $562456 Recommendation FHWA Englnee~ J1~ed Form ffi Date

fl Eligible o Ineligible Mark Stinson 1nt1A f middot(hZ~ Concummce

DNo State EnginaIJ VJ 7 -y w ~ Vt

~ves BuZV We r~ v Jf-J 0

Concurrence Local Agency Representative v

D Date7

eVes [J No I

Fonn FHWA-1647 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Franklin [IUS Department

or Tranaportallon (Title 23 Federal-aid Highways) Sheet 1 FIIO Highway 1 of 1 Admlnlstratlon

iILocation (Name ofRoad and Milepost) FHWA Disaliter Number Katrina

i Franklin from Filmore to Gentilly (71 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 2 parking lanes 05042010

DescrIpIIon of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Slate County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work tgt Date Unit Unit Prioe Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0

$0 $0~I

0 $0

~ $0 II)

$02 CD

JJ $0

$0 $0

$0

Method Subtotal $0 $0 o Local Forces o Stale Fones oContract PEICE $0 $0

I I Emergency Repair Total $0

$0 $0 $0

Pavement patching 2 mill and 2 HMAC overfay $75729On 100 $757290 C i ADA ramp~ Miscellaneous work such as manhole $0Jr~djU8tments and curb and gutter replacement to be Included i $0

only where required to accomodste patching and overlay $0I $00

$0C PECE included in estimate II)

=i $0c III

$0e ~ $0I

Method SUbtotal $757290

o Local Forces o State FOICe$ ~ ConlJllCt PECE $0 Right-at-Way

Perm Repair TotalS $757290 Environmental Assessment Recommendation

III Calegorkal Exclusion n EAlEIS Estlmated Total $757290

i Recommendation FHWA Engineer ~AJ Afflgned Farm on File Date (l Eligible o Ineligible Mark Stinson E A - m nQ

ConCUlTlnce Ipoundj Ves DNo

state Engineer -rshy2J41L ~ i m tlv7krW~ PEConcurrence gency Representative 0

Date DVes DNo

Form FHWA-1S47 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

-- ---

Report Number DETAILED DAMAGE INSPECTION REPORT

nt bull K-071-LA-SRB-Hayne

Iof TranamppOltalion SheetFederal HIghway (Title 23 Federal-ald Highways)

of1 Admlnlstlltlon

Location (Name ofRoad and Milepost) FHWA DAster Number KatrinaHayne from Press to Congress (38 miles) in Orleans Parish

Inspection DateIncludes 2 travel lanes 05042010i i OesaIption of Damage Federal-aid Route Number

LocalPavement deterioration due to submerged road andor debris hauling after Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Cost1 Description of ~rk to Date Unit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

$0 NA $0

$0 i $0

iiIi $Oi a i

~ ~ ~

$0 $0 $0 SOl

~

Method SUIllotaI $0 $0 PEICE $0 $0Local Forces o Slate Forces Deontract

Emergency Repair Total $0 $0 $0 1i ---

I $0 Pavement patching 2 mill and 2 HMAC overlay stripping $167333100$1673330

c Miscellaneous work such as manhole SO $0f adjustments and curb and gutter replacement to be included $0 $0

Jionly where required to accomodate patching and overlay

c $0PEICE included in estimate-Q)c $0 E til

SO tfmiddot $0

Method Subtotal $167333 PElCE $0o Local Forces State Forees III Contract

Rlght-ofmiddotway

Penn Repair Totals $167333I Environmental Aampampesampmeot Recommendation I1l categorical Exclusion OENEIS $167333Eltlmated Total Recommendation FHWA Engineer Ad Fonn on File

Iii Eligible D Ineligible D~tltJ IMark Stinson ~--IYJA 11 W Concurrence Date - ~7State Engineer ~~I J JIII Yes DNo IBuzzy Weaener PE 11 W -z]D

Local Agency Representative Date 7IConcurrence DYes DNo 0 I

fonn FHWAmiddot1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT Kmiddot071-LAmiddotSRB-Congress Department

01 TranportationI[ U

Federal Highway (Title 23 Federal-ald Highways) Admlnlalratian

Location (Name of Road and Milepost)

Sheet __1_ of _1__

FHWA Disaster Number KatrinaCongress from Hanye to Madrid (54 miles) and from Madrid to Chef Mentur (11 miles)

Inspection Oate164 miles total in Or1eans Parish Includes 2 travel lanes and 15 avg par1lting lanes 0510412010 I

IDesctiplion of Damage Fedefal-ald Route Number

i LocslI Pavement deterioration due to submerged road andor debris hauling after I

HUrricane Katrina Pavement meets submerged roads crltena per agreement County

between FHWA Division and LDOTD Field review conducted on 542010 Or1eans

Cost Estimate

OeSCllptlon of WOrk to Date Unit Unit Price Quantity(Equipment Labor and Materials)

NA

I i

10

IiCf (tcQ)

EI~

Method Subtotal

Local Forcss o State Forceamp Dcontract PEICE

Cost

Completed Remaining

$0 $0

$01 $0 $0] $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0

I Emergency Repair Total $0 I Hanyne to Madrid (54 miles) Mill 4 and 4 HMAC overlay $0

I Madrid to Chef Mentur (11 miles) Mill 2 amp 2 HMAC overlay i $0 $0

I Pavement patching stripping ADA ramps $12533()i 100 i $1253300 1

c Miscellaneous work such as manhole $012 adjustments and curb and gutter replacement to be included $01 only where required to accomodate patching and overlay $0 ~ $0

i i PECE included in estimate i $0 $0

~ $0 ~ $0

Method Subtotal $1253300 o Local Forces o State Forces III Contract

PElCE $0 RlghtmiddotofIJVay

Perm Repair Totals $1253300 i Environmental Assessment Recommendation

rzJ Categorfcal exclusion o EAlEIS Estimated Total $1253300 Recommendation FHWA Engineer AA J ~ned Foon on File ~hzloI III Eligible o Ineligible Mark Stinson Ph IllA m

i concurrencs III Yes DNo i Stale Engineer a~~(L +m DalZ 271 0i Buzzy Weaene bullbull Concurrence Local Agency RepresentatlVe v D Dale I

Dyes DNO

Fonn FHWAmiddot1547 (Rev 98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

I Report Number

DETAILED DAMAGE INSPECTION REPORT K-071-LA-SR6-Morrisonus OeperIment of Transpcwtlllion FedtmlIH~y (Title 23 Federal-aid Highways) Sheet

i

1

Cost Estimate

__1_ of_1__Admlnlstmion

Location (Name ofRoad and MIlepost) FHWA DIsaster Number 1 Morrison from Lamb to Mayo (84 miles) in Orleans Parish Katrina

lnspectloo DateIncludes 4 travel lanes and 2 parking lanes 05042010 Description of Damage i Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stete County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

I Description of Work to Date Unit Unit Price Quantity i Cost (Equipment Labor and Malenals) i Completed RemainingI

1 I $0 NA $0

$0

$0

1 $0 I $0

~ $0 Q)

$02 ~ i $0w

$0

$0

$0

Method Subtotal $0 $0

I o Local Forces o State Forces oContract PEICE $0 $0

Emergency Repalr Total $0 $0

i $0 $0

IPavement patching 2 mill and 2 HMAC overlay striooina $749157d 100 $7491571

sect ADA Ramps Miscellaneous work such as manhole $0

1 adjustments and oorb and gutter replacement to be included $0 0 only where required to accomodate patching and overlay $0i $00

i PEICE included in estimate $0 c $0 ~ $0 ~ $0

MeItIod subtotal $749157

Local Forces State Forces III Contract PEICE $0 Right-ot-Way c-- _

$7491571Penn Repair Totals

Environmental Assessment Recommendation (lj categorical exclUsion o EAlEIS Estimated Total $749157

Recommendation FHWA Englne~~ A srd Fonn rnilj Datehrill Eligible D Ineligible Mark Stinson PE r4 ~ 2l-()

bullConcurrance III Yes ONo State Engineer l~ ~A-J ~ Date h 7I BUZZY Wegene PE I lJllo i

Concurrance Local Agerry Representative v 0

Dale ( I DYes DNo

1 -shy

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Il~ment Report Number IDETAILED DAMAGE INSPECTION REPORT K-071-LA-SRB-Mayo i of Tranaportajon (Title 23 Federal-ald Highways) Sheet Federal Highway

1 of 1Adminhltndlon -shyLocation (Name ofRoad and Milepost) FHWA Disaster Number

IMayo from Hayne to 1-10 (84 miles) in Orleans Parish Katrina

Inspection DaleIncludes 4 travel lanes (5 miles) 2 travel lanes (34 miles) and 2 parking lanes 050412010 i

Oesaiption of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andlor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement Stele COunty

between FHWA Division and LDOTD Field review conducted on 542010 ILA Orleans

Cost Estimate

Description of Work to Dete Unit Unit Price I Quantity Cost

(Equipment Labor and Materials) Completed Remaining

$0 iNA $0

$0

$0

R $0iii Co

amp $0 igt $0c Q)

$0~ ltII E w

$0

$0

$0

Method subtotal $0 $0

Local Fornes State Fornes Deontract PEICE $0 $0 Emergency Repatr Total $01

$0 $0 1

$0 I Pavement patching 2 mill and 2 HMAC overlay stripping $661711 100 $661711

c ADA RampS Miscellaneous work such as manhole $0 ~ adjustments and curb and gutter replacement to be included $0 ~ only where required to accomodate patching and overlay $0

amp $0 PEfCE included in estimate $0aic $0 ~ $0 amp $0

Metlod Subtotal $661 711

o local Fornes o State Forcas III Contract 04 PECE $0

i Right-of-Way i

Perm Repair Totals $661711 i Environmental Assessment Recommendation

III Categorical ExclUSion o ENEIS Estimated Total $661711

I Recommendation FHWA Engineer ~ed Form on File Date III Eligible o Ineligible Mark Stinson rrC)tvJ4A [l] ltZlIO

I Concurrence III Yes DNo State En~neer dttV J [l] Oate l rlBuzzy Wegener PE IV II 1-3 10

Concurrence Local Agency Representative v

0 Date 1 I

I[J Yes nNo

Form FHWAmiddot1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

ro Report Number DETAILED DAMAGE INSPECTION REPORT K-071middotLA-SRB-AlvarIus Department

01 Transpol1lltion (Title 23 Federal-ald Highways) Sheet Federal Highway 1 of 1Admlnlstndlon -shy

Location (Name ofRoad ancI MIlepost) FHWA DIsaster Number IKatrina I

AJvar from Florida to Almonaster Bridge (11 miles) in Orleans Parish Inspection DateIncludes 4 travel lanes and 1 parking lane 05042010

DesCl1ption of Damage Federal-ald Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

IHurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 542010 LA Orleans

Cost Estimate

DescI1ptlon ofWork to Date CostUnit Unit Price Quantity(Equipment Labor and Materials) Completed Remaining

I $0 NA I $0 ~-

$0I I

I $0

1 $0 $0

~ $0 ~

I $0 ~ $0w

$0 $0 $0

Method Subto1a1 $0 $0 o local Forces S1ate Forces DContract PEICE $OJ $0 1

Emergency RepaIr To1a1 $01 Composite section (6 miles) Mill 2 HMAC overlay 2 $0 Concrete section (5 miles) 2 HMAC overlay $0

$0 i Pavement patching stripping ADA ramps $765104- 100middot $765104

c Misceltaneous worK such as manhole $02 bulladjustments and curb and gutter replacement to be included $0 only where required to accomodate patching and overlay $01II $0Ir

c PECE included in estimate SO ~ $0

~ $0 - -shy

$0Cl I-shyMethod Subtotal $765104

i Local Forces D State Fortes III Contract PElCE SO

Right-of-way

I Perm RepalrTo1aLamp $765104

I Enviwnmental Assessment RecommendationI III categorical Exduslon o EAlEIS Estimated Total $765104 bull Recommendation I III Eligible o Ineligible

FHWA Engineer J314~ ~ed Form on rue Mark Stinson PE 141 m oateh

~ ttl() I Concurrence IZ Vea DNa State Engineer 1 h1J ~ J [Z] D1)~J()Buzzy Wegener P A

I Concurrence Local Agency Representative V D

Date ( I

DVes UNo i Form FHWAmiddot1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number

Depa1menl DETAILED DAMAGE INSPECTION REPORT K-071middotLA-5RBmiddotLeonldas

011 Transportallon (Title 23 Federal-ald Highways) SheetFed Highway __1_ of _1__Admlnlstnlllon

Locatlon (Name ofRoad and Milepost) FHWA Disaster Number

ILeonida from Palmetto to Earhart (49 miles) in Orleans Parish Katrina Inspection DaIBIncludes 2 travel lanes 05042010

I Description of Damage Federalmiddotaid Route Number

Pavement deterioration due to submerged road andor debris hauling after Local

Hurricane Katrina Pavement meets submerged roads criteria per agreement State County

between FHWA Division and LDOTD Field review conducted on 5412010 LA Orleans

Cost Estimate

Description of Work to Date Unit UnltPrke Quantity Colt

(Equipment Labor and MalBnals) Completed Remaining SO

NA $0

$0 $0

1 $0 amp SO

~ $oi ~ $0

~I SO I $0

$0 $0

Method Subtotal $0 $0

localFOIC88 State Forces oContract PElCE $0 $0 Emergency Repair Total SO

$01 $0 $01

Pavement patching 2 mill 2 HMAC overlay stripping $21472om 100 $214720 sect I ADA Ramps Miscellaneous work such as manhole SO ii I adjustments and curb and gutter replacement to be included $0 2 only where required to accomodate patching and overlay $0il $0 1i i PEICE included in estimate $0 i l $0 E $0Igt

$0a bullMethod Subtotal $214720

Local FOIC88 o State Forces III Contract 00 PEICE $0

Right-of-Way Perm Repair Tolais $214720

Environmental Assessment RecommendationV Categorical Exclusion [1 EAEIS Estimated Total $214720

RecommendatiOn FHWA Engineer r1( I~ed Form on File IDaterv2zboIII Eligible r Ineligible MarK Stinson P~ 7IA A [l]

Concurrence II Yes DNa Slate Engineer

~~~ j [l] Dal ~3tJ IBuzzy Weaener Concurrence Local Agency Representative v

0 Date 7 i [Jyes eNo I

1 i Fonn FHWAmiddot164T (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)

Report Number DETAILED DAMAGE INSPECTION REPORT K-051-LA-SRB-ClearviewI us Oepaltmenl

i of Tl1Insportallon (Title 23 Federal-ald Highways) Sheet Feder1 Highway

__1_ of 1bull Admlnlstrdon

I location (Narl1$ ofRoad and MIlepost) FHWA DIsaster Number

I Clearview from Veterans to Kawanee (4 miles) in Jefferson Parish Katrina Inspection Date

i Includes 4 travel lanes 050412010

Descr1ptlon of Damage Federal-aid Route Number

Pavement deterioration due to submerged road andor debris hauling after local

i rin 55 m State Coun

between FHWA Division and LDOTD Field review conducted on 542010 ILA Jefferson

Hurr cane Kat a Pavement meet ub erged roads critena per agreement ty

Cost Estimate

i Description of Work to Date I Unit Unit Price Quantity Cost

(equipment labor and Materials) Completed Remaining

$0 NA $0

SOl $0

$0 $0

~ $0 Q)

$0i $0w $0 $0 $0

Method Subtotal $0 $0 i o Local Forces o State Forces Dcontract PEICE $0 $0 i Emergency Repair Total $0

$0 I $0

I SO

Pavement patching 2- mill 2 HMAC overlav strtpPinJ $2n 90bi 100 $277901 8 I ADA Ramps Miscellaneous wor1lt such as manhole SOi adjustments and curb and gutter replacement to be Included $0

only where required to accomodate patching and overlay $0i -shy $0

jl PEJCE included in estimate I $0I

$0 E $0tf -r--shy

$0 1

Method Subtotal $277901

o local FOICe$ o State Forces rlI Contract PEICE SO Right-of-wayi

Perm Repair Totals $277901 Envlronmentel Asampe8Sment Recommendation

17 Categorical Exclusion DEAlEIS Estimated Total $2n901 Recommendation FHWA Engineer ArLlgned Form on File Date~J221JfIII Eligible D Ineligible Mark Stlnson~4iJ r- m

i Concurrence Il Yes DNo Slate Engineer lr1t4lfV- -A- m D7 i~JkQ BuzzvWeaeni

Concurrence local Agency Representative -

D Date I

I Dyes QNo

Form FHWA-1547 (Rev 4-98)