Hudson Yards: Designing New York’s Newest Neighborhood - William Pedersen (KPF), Facades+ NYC 2016
1 hudson yards project (peter wertheim)
-
Upload
wwwtheurbanvisioncom -
Category
Technology
-
view
110 -
download
3
description
Transcript of 1 hudson yards project (peter wertheim)
The Hudson Yards Project
September 26, 2013
HUDSON YARDS DEVELOPMENT CORPORATION
Hudson Yards Project Area
Hudson Yards Area is bounded by West 43rd Street, 7th & 8th Avenues, West 30th Street and 12th Avenue
1
HUDSON YARDS DEVELOPMENT CORPORATION
Master Plan: Caemmerer West Side Yard released by the
MTA (1988)
•Plan proposed a mixed-use development of the MTA Rail Yards and the block south of the Javits Convention Center
•Report concluded a rezoning was necessary to permit a floor area ratio of 12 to support the plan
•Success of plan contingent upon extension of rapid transit access to the area
Special Jacob K. Javits Convention Center
District Created (1990)
•Established to facilitate mixed-use development adjacent to the Javits Convention Center
•Permitted FAR as high as 10 for residential, office, hotel, and community facility uses on sites surrounding the Javits plaza
•No development resulted
City Planning Commission Study of
the Hudson Yards Area (1993)
•Shaping the City’s Future report concluded that expanding existing CBDs was essential to accommodate long-term growth
•Hudson Yards was identified as an extension of the Midtown CBD
•Report concluded that the City must ensure “that appropriate as-of-right zoning is in place to accommodate expansion and future office needs.”
•The report suggested extending the No. 7 Subway west through Hudson Yards and on to New Jersey
The HY Idea Takes Shape
2
HUDSON YARDS DEVELOPMENT CORPORATION 3
The HY Project Plan Evolves
•Study linked land use and future development with expansion of mass transit•Existing conditions analysis of HY area focused on land use, transportation infrastructure and services, and the area’s tax base
•Transportation analysis of whether the street network could support additional development• Identified the need for a “self-financing” model for the subway extension
DCP Study of Extending the No. 7
Subway Line to Hudson Yards (1999)
• Identified the need for a transit-oriented mixed-use extension of the Midtown CBD•Established three essential components for redeveloping the HY area:•Rezoning to allow for millions of square feet of mixed-use development•Construction of the No. 7 Subway Extension•Creation of open space amenities to attract businesses, residents, and visitors
Far West Midtown: A Framework for
Development (2001)
•DCP and NYCEDC engaged a multi-disciplinary urban design team to create a master plan for HY in 2002Master Plan (2002)
•City of New York hired consultants Economics Research Associates (ERA) and Cushman & Wakefield (C&W) to forecast long-term growth of office-using employment (OUE) and to analyze HY’s ability to capture future demand for Class A office space in MidtownDemand Study (2002)
•DCP releases Preferred Direction Plan for HY in 2003•PDP confirmed the need for the three project components outlined in the 2001 Far West Midtown report
Preferred Direction Plan (2003)
HUDSON YARDS DEVELOPMENT CORPORATION
The Public Sector Organizes
City creates the administrative structure to execute the HY plan
4
HUDSON YARDS INFRASTRUCTURE CORPORATION HUDSON YARDS DEVELOPMENT CORPORATION
Created in 2004 Created in 2005
Oversees project financing and cost containment Responsible for the implementation of City’s HY development program
Board members:
OMB Budget Director
Deputy Mayor for Operations
Deputy Mayor for Economic Development
City Comptroller
Speaker of City Council
Board members:
All five HYIC Board Members, plus: Commissioners of SBS, Parks, HPD and City
Planning President, NYCEDC Manhattan Borough President Council Member for District 3 Community Board 4 Chair
Staffed by City’s Office of Management and Budget 9 full-time employees
HUDSON YARDS DEVELOPMENT CORPORATION
HYDC
DOT
DEP
DCP
DPR
NYCEDC
MTA
MVVA (Park Designers)
Developers
Community
City Hall/OMB/HYIC
Managing the HY Project
5
HUDSON YARDS DEVELOPMENT CORPORATION
Land Use
Predominantly residential
Mixed use
Predominantly Commercial
Open space
Cultural
12/1912/19
6.5(10)/136.5(10)/13
6.5(10)/126.5(10)/12
10/19.510/19.5
10/1810/18
666.5/156.5/15 66
1111
10/3310/33
7.57.5
10/1510/15
10/1210/12
1010
6.5/ 13
6.5/ 13
10/2410/24
10/21.610/21.6
10/2010/20
10/1210/12
10/3310/33
10/2410/24
10/ 21.610/
21.6
34th St.
42nd St.
8th A
ve.
10th
Ave
.
1010
The 2005/2009 Rezonings
6
HUDSON YARDS DEVELOPMENT CORPORATION
Hudson Park & Boulevard
7
Hudson Park and Boulevard → Clockwise: Block #1 (West 33rd/34th Streets); Block #2 (West
34th/35th Streets); and schematic design of park
and boulevard;
33RD ST
35TH ST
36TH ST
34TH ST
HUDSON YARDS DEVELOPMENT CORPORATION
Project Costs and Financing Structure
Total Cost ($mm)
No. 7 Subway extension:
Construction 2,260
Contingency 107
Acquisition of a portion of ERY TDRs from MTA 200
Parks, Streets and Property Acquisition 433
Total 3,000
Project financing plan operates by capturing the incremental revenues from new developments, made possible by the HY rezonings, to cover debt service on HY Project bonds issued by HYIC
$3.0bn of Hudson Yards Project bonds have been sold, making the project fully funded
$1.0bn of Hudson Yards bonds were sold in October 2011. The bonds were rated “A” by S&P and Fitch, and “A2” by Moody’s
$2.0bn of Hudson Yards bonds were sold in December 2006, with similar ratings
8
HUDSON YARDS DEVELOPMENT CORPORATION
Property Tax Equivalency Payments
Hudson Yards IDA PILOT Payments
DIB and ERY TDR Payments
HYIC
• No. 7 Subway Extension
• Parks and Streets
• $200 mm to MTA re: ERY
• HYDC Operating Expenses
Interest Payments by City if HYIC
Revenues Insufficient
Debt Service
Bond Proceeds
Bondholders
The HY Financing Structure
9
HUDSON YARDS DEVELOPMENT CORPORATION
COMMERCIAL DEVELOPMENT RESIDENTIAL DEVELOPMENT
INCLUSIONARYHOUSING BONUSDISTRICT IMPROVEMENT
FUND BONUS (DIB)
BASE (AS-OF-RIGHT)
DEVELOPMENT
EASTERN RAILYARDTRANSFER (ERY TDRs)
DIB
BASE (AS-OF-RIGHT)
DEVELOPMENT
A
B
West 36th S
treet
DIB (Pari Passu)
Mid-Block Blvd. &
Park
Increasing Density and Creating Non-Recurring Revenue Sources:
DIB and ERY TDRs
10
HUDSON YARDS DEVELOPMENT CORPORATION
ERY TDRs Generating Site
ERY TDRs Receiving Sites
DIB Available
34th Street
Eig
hth
Ave
nu
e
Ten
th A
ven
ue
42nd Street
ERY TDRs
ERY
Increasing Density and Creating Non-Recurring Revenue Sources: ERY TDRs
11
HUDSON YARDS DEVELOPMENT CORPORATION
34th St.
42nd St.
8th
Ave.
10th
Ave.
Zone 3
HY UTEP AreaZone 2
Zone 1No Discount*
25% Discount for 15 years,
or the benefit available in Zone 3, whichever is less,
then 4 year phase-out
Illustration of Percentage Discount to Actual Taxes Available for Office Buildings in Hudson Yards UTEP Area
1st 5 million sf 40% Discount,
2nd 5 million sf 25% Discount,
3rd 5 million sf 20% Discount,
4th 5 million sf 15% Discount,
all for 15 years, then 4 year phase-out
* Program provides fixed 3 percent annual payment increase for 15 years
12
Incentivizing Development
New office development will receive property tax abatements according to Uniform Tax Exemption Policy adopted by NYC IDA
HUDSON YARDS DEVELOPMENT CORPORATION14
34th S
treet
33rd S
tree
t
11th Avenue
Future 34th
Station
Entrance
Vent
Building
Hudson Park & Boulevard
Construction Status – Site J (11th Avenue between West 33rd/West 34th Streets)
13
Development Site (Related
Companies)
HUDSON YARDS DEVELOPMENT CORPORATION
15
Construction Status – Escalators to Mezzanine
14
HUDSON YARDS DEVELOPMENT CORPORATION16
Construction Status – Subway Tunnels
15
HUDSON YARDS DEVELOPMENT CORPORATION
Forecasting Future Development
As a result of the 2005/2009 rezonings, Hudson Yards district can now accommodate:
25 msf of new office development
20,000 units of new housing
2 msf of new retail
3 msf of new hotel
Developers have committed more than $11.4B to build 14 msf of new office, retail, residential and hotel development in Hudson Yards since the 2005 rezoning
More than 6,000 apartments, including 1,600 affordable units, and more than 3,200 hotel rooms have been built
Market rate residential rents are reportedly in the mid-$60s to mid-$80s
$90M of DIB has been sold since 2005
16
MiMA, 440 West 42nd Street (Related Companies)
Yotel, 570 Tenth Avenue
Silver Towers, 600 West 42nd Street(Silverstein Properties)
HUDSON YARDS DEVELOPMENT CORPORATION
Commercial Development Activity – Related Companies
“Coach Tower” (1.7 msf; corner of 10th Avenue and 30th Street) is under construction Coach will purchase its 700,000 sf of office space. Occupancy is planned for August
2015 Building is 85% leased with L’Oréal and SAP signed on for office space and with
Fairway Market anchoring the retail base $354M construction loan for the $1.4B tower secured from Starwood Property Trust
“North Tower” and adjacent retail complex (2.5 msf / 750,000 sf of retail;10th Avenue and 33rd Street) are in advanced stages of pre-development
Press reports indicate that Time Warner has leased1.2 msf of office space
Construction of the $800M ERY platform will start in January 2014
Related announced the hiring of Philippe Visser, formerly the Director of World Trade Center Redevelopment, to lead the development of the North Tower
NYCIDA is scheduled to review Related’s application for HY UTEP benefits at an October 2013 hearing
Related recently closed on its purchase of the development site adjacent to the first block of Hudson Park & Boulevard (11th Avenue and 33rd Street)
Extell Development, the seller, had been planning a 1.5 msf office building
Related is planning to start construction of a 1.0 msf tower in 2014
17
HUDSON YARDS DEVELOPMENT CORPORATION
Commercial Development Activity
Work continues on Brookfield Properties’ “Manhattan West” project (Ninth Avenue between 31st and 33rd Streets)
Mixed-use development will include more than 5.0 msf of office, commercial, and residential uses
$680M platform under construction using bridge technology (pictured top right)
450 West 33rd Street (pictured lower right) will be retrofitted as part of the project
McCourt Global recently paid $167.3M for a development site on 10th Avenue and 30th Street (indicated by arrow; pictured lower right)
Potential for 733,000 sf of commercial development
Sellers Sherwood Equities and Long Wharf Real Estate Partners paid $43.5M for the site in 2011
Hudson Yards BID awaiting City Planning approval. Organizers working towards approval by the full City Council in December 2013
18 360 Tenth Avenue (McCourt Global)
HUDSON YARDS DEVELOPMENT CORPORATION
Residential Projects in the 2013 Pipeline
19
Address Developer # of Units
605 West 42nd Street Moinian Group 1,194
West 31st Street (between Ninth and 10th Avenues)
Brookfield Office Properties 850
10th Avenue at West 41st Street Extell Development Company 600
509 West 38th Street Iliad Realty 250
West 36th Street (between 10th and 11th)
Lalezarian Developers 200
Total 3,094
HUDSON YARDS DEVELOPMENT CORPORATION
Hudson Yards: 2013/2014
The new 34th Street and 11th Avenue Station will accommodate up to 30,000 peak-hour riders when Hudson Yards is fully developed
20
HUDSON YARDS DEVELOPMENT CORPORATION
Hudson Yards: 2013/2014
Hudson Park and Boulevard – Looking north from West 34th Street (adjacent to 3 Hudson Boulevard)
21