2
Objectives of PRO sub-project
• Develop global assimilation systems for greenhouse gases, reactive gases and aerosols (Year 1 …)
• Acquire, pre-process and monitor observations (Year 1 …)
• Develop web/verification infrastructure (Year 1 …)
• Produce trial analyses for greenhouse gases, reactive gases and aerosols (Year 2 …)
• Unify refined versions of assimilation systems into integrated GEMS assimilation system (Year 3)
• Produce extended analyses and daily forecasts (Year 3 …)
• Prepare for operational implementation, including real-time forecasts to support RAQ (Year 4)
3
Components of the PRO sub-project
WP_PRO_2
AER assimilation
system & reanalysis
WP_PRO_3
GRG assimilation
system & reanalysis
WP_PRO_1
GHG assimilation
system & reanalysis
WP_PRO_4
CTM interfaces &
technical support
WP_PRO_6
Web interface & verification
tools
WP_PRO_5
Technical observation processing
GHG sub-project
AER sub-project
GRG sub-project
RAQ sub-project
4
Components of the PRO sub-project
WP_PRO_2
AER assimilation
system & reanalysis
WP_PRO_3
GRG assimilation
system & reanalysis
WP_PRO_1
GHG assimilation
system & reanalysis
WP_PRO_4
CTM interfaces &
technical support
WP_PRO_6
Web interface & verification
tools
WP_PRO_5
Technical observation processing
GHG sub-project
AER sub-project
GRG sub-project
RAQ sub-project
Antje Dethof
Claes Larsson
Johannes Flemming
Jean-Jacques Morcrette + ?
Soumia Serrar
Miha Razinger
Martin Suttie
Angela Benedetti
Richard Engelen
5
GHG assimilation system & reanalysis
• Head-start from FP5 COCO project• Have generalized model code for new GEMS variables
– common to GHG, GRG and AER
• Implemented surface fluxes of CO2
• Have run two-month Radon forecast• Generalising code for background-error constraint Jb
– common to GHG, GRG and AER
April
6
GRG assimilation system & reanalysis
• Head-start on O3 from operations and ERA-40
• Have generalized model code for new GEMS variables• Started to address CTM coupling • Generalising code for background-error constraint Jb
• Have extended observation processing routines to
include other GRG (NO2, SO2, CO, CH2O) variables
• First copy O3 observation operators. Later use
averaging kernels.
SBUV and SCIAMACHY O3 retrievals assimilated
7
AER assimilation system & reanalysis
• Have generalized model code for new GEMS variables• Are implementing specific aerosol parametrizations• Generalising code for background-error constraint Jb
• Have introduced aerosol total optical depth as new
observed variable• Have run aerosol forecasts from climatological initial
data and derived error statistics from “NMC method”• Activity to be coordinated with Task 3 of AER sub-project
60°S60°S
30°S 30°S
0°0°
30°N 30°N
60°N60°N
150°W
150°W 120°W
120°W 90°W
90°W 60°W
60°W 30°W
30°W 0°
0° 30°E
30°E 60°E
60°E 90°E
90°E 120°E
120°E 150°E
150°E
Monday 1 January 2001 12UTC ECMWF Forecast t+120 VT: Saturday 6 January 2001 12UTC 1000hPa **
0.0010.005 0.01 0.02 0.03 0.05 0.075 0.1 0.15 0.2 0.5 1
-1.0 -0.6 -0.2 0.2 0.6 1.0Correlations on Aerosol Mixing Ratio
1000
800
600
400
200P
ressu
re le
vel
GlobalTropicsExtra-tropics NHExtra-tropics SH
8
Technical observation processing
• Discussed “generalised BUFR definition”• Updated Envisat-PDS to BUFR software• Reviewed data availability
• Extracted sample MODIS aerosol, SCIAMACHY NO2
and MOPITT CO data (all in HDF)• Next:
- Set up BUFR definitions, starting with sample datasets
- Develop HDF-to-BUFR converter
- Maintain data-availability spreadsheet
Start End Web FTP Comments
ESA ENVISAT SCIAMACHYUniv. of Bremen
CH4 vertical column ASCII 2002 Present
http://www.iup.physik.uni-bremen.de/sciamachy/NIR_NADIR_WFM_DOAS/wfmd_products_download.html
Needs e-mail detailing use of data
ESA ENVISAT SCIAMACHY ESAO3 vertical column 2.5 BUFR
http://envisat.esa.int/instruments/sciamachy/data-app/dataprod.html
ftp://ftp-ops.pdk.envisat.esa.int and ftp://ftp-ops.pde.envisat.esa.int
14/12/2002 to present
ESA ENVISAT SCIAMACHY KNMIO3 vertical column 11.0 ASCII
http://www.temis.nl/protocols/O3total.html
ftp://ftppro.knmi.nl/data/o3scia
31/01/2004 to present
ESA ENVISAT SCIAMACHY KNMI
NO2 vertical column 25.0 HDF 01/01/2003 Present
http://www.temis.nl/airpollution/no2col/no2col.php Unknown
ESA ENVISAT SCIAMACHY BIRA-IASB
SO2 vertical column
http://www.temis.nl/airpollution/so2.html
Only maps. Cannot find Level 2 data.
ESA ENVISAT SCIAMACHY CH2ORemoved from TEMIS
Data in ECFS
Data access
Agency Mission InstrumentSpecies
for GEMS
Estimated data
volume
Data time frameProcessing
CentreData
format
9
Web interface & verification tools
• Last task to start• Basic prototype for plot display has been set up• Claude Gibert will discuss capabilities and access
mechanisms in Technical Session 3 • Strong interaction with RAQ project; plan for
verification needs developing