FRPA Quiz Show
Harvesting & Roads Module
FRPA Training Program
February 2004
Harvesting & Roads Module
2
Practice Requirements
The practice requirements in FPPR can be changed through an approved:
a) Exemption to some practice requirements
b) Alternative in FSP to “default results and strategies” in FPPR
c) Both “a” and “b”d) “a” only
Harvesting & Roads Module
3
Practice Requirements
Answer: C – “a” and “b”
The practice requirements in FPPR can be changed through an approved:
a) Exemption to some practice requirements
b) Alternative in FSP to “default results and strategies” in FPPR
Harvesting & Roads Module
4
Transition to FRPA
Harvesting under a cutting permit issued for areas under an approved FDP can continue once FRPA is in effect.
True
False
Harvesting & Roads Module
5
Transition to FRPA
Answer: True – in this case, harvesting follows the requirements of the FPC
Harvesting under a cutting permit issued for areas under an approved FDP can continue once FRPA is in effect.
Harvesting & Roads Module
6
Notify Government
Licensees must notify government before:
a) Starting timber harvesting
b) Starting construction of roads that are permanent access structures
c) Starting layout of cutblocks and roads
d) All of the above
e) “a” and “b”
Harvesting & Roads Module
7
Notify Government
Answer: E – “a” and “b”
Licensees must notify government before:
a) Starting timber harvesting
b) Starting construction of roads that are permanent access structures
Harvesting & Roads Module
8
Maximum Cutblock Size
An alternative result or strategy to the maximum cutblock size of 40 ha and 60 ha can be proposed in the FSP.
True
False
Harvesting & Roads Module
9
Maximum Cutblock Size
Answer: True
An alternative result or strategy to the maximum cutblock size of 40 ha and 60 ha can be proposed in the FSP.
Harvesting & Roads Module
10
Green-up
An exemption to the requirement for harvesting adjacent to another cutblock can be obtained from the Minister of Forests.
True
False
Harvesting & Roads Module
11
Green-up
Answer: False – an alternative result and/or strategy can be proposed in the FSP but not an exemption.
An exemption to the requirement for harvesting adjacent to another cutblock [cannot] be obtained from the Minister of Forests.
Harvesting & Roads Module
12
Wildlife Trees Retention Areas
An alternative result or strategy to the restriction on harvesting in a wildlife tree retention area can be proposed in the FSP.
True
False
Harvesting & Roads Module
13
Wildlife Trees Retention Areas
Answer: True -- an exemption can also be requested from the Minister of Forests.
An alternative result or strategy to the restriction on harvesting in a wildlife tree retention area can be proposed in the FSP.
Harvesting & Roads Module
14
Course Woody Debris
Course woody debris requirements include retaining at least 4 logs per hectare on a cutblock.
True
False
Harvesting & Roads Module
15
Course Woody Debris
Answer: True
Course woody debris requirements include retaining at least 4 logs per hectare on a cutblock.
Harvesting & Roads Module
16
Defences under FRPA
Defences under FRPA are:a) Due Diligence
b) Mistake of Fact
c) Officially Induced Error
d) Consistency with objectives
e) “a”, “b” and “c” only
f) All of the above
Harvesting & Roads Module
17
Defences under FRPA
Answer: E – “a”, “b” and “c”
Defences under FRPA are:a) Due Diligence
b) Mistake of Fact
c) Officially Induced Error
Harvesting & Roads Module
18
Annual Report
One of the items to report in the Annual Report is the location of wildlife habitat features in or contiguous to a cutblock/road that has not previously been reported (and required to be reported).
True
False
Harvesting & Roads Module
19
Annual Report
Answer: True
One of the items to report in the Annual Report is the location of wildlife habitat features in or contiguous to a cutblock/road that has not previously been reported (and required to be reported).
Harvesting & Roads Module
20
Road Layout and Design
RLAD plans are required but not approved under FRPA .
True
False
Harvesting & Roads Module
21
Road Layout and Design
Answer: False -- FRPA requires roads and structures to be constructed such that they are structurally sound and safe and to engineering requirements were established.
RLAD are not referred to, nor required, nor approved under FRPA.
Harvesting & Roads Module
22
Road Deactivation
Under FRPA , how long does a District Manager have to approve or disapprove a licensee’s declaration that a road is deactivated?
a) 60 days
b) 15 months
c) 15 years
d) Length specified by licensee in declaration
Harvesting & Roads Module
23
Road Deactivation
Answer: B
Under FRPA , how long does a District Manager have to approve or disapprove a licensee’s declaration that a road is deactivated?
b) 15 months
Harvesting & Roads Module
24
Responsibilities
When harvesting and constructing roads under FRPA , licensees are responsible for:
a) Delivery of results and strategies in an approved FSP
b) Delivery of government objectivesc) Meeting practice requirements in
regulationd) All of the abovee) “a” and “c”
Harvesting & Roads Module
25
Responsibilities
Answer: E – “a” and “c”
When harvesting and constructing roads under FRPA , licensees are responsible for:
a) Delivery of results and strategies in an approved FSP
c) Meeting practice requirements in regulation