1

Forums on Lump Sum Grant Review

Forum One

18 March 2008

Page 2: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

2

1 Progress Update

• LSG Steering Committee Meeting - 3 March 20

08

• Increase of $200M in recurrent subventions for

NGOs in 2008-09

• Concerns of subvented agencies not on LSG m

ode

Page 3: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

3

2 Today’s Discussion: LSG Review

2.1 Spirit & basic principles of LSG

2.2 Irregularities and inconsistencies in actual implementation

2.3 Complaints-handling mechanism

Page 4: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

4

LSG Independent Review

The Terms of Reference of the Committee:

1. To review LSG with a view to assessing its overall effectiveness and identifying areas and scope for improvement covering but not limited to-

a) overall implementation;

b) flexibility, efficiency & cost-effectiveness in the use of public funds and in service delivery by subvented NGOs;

c) the accountability and corporate governance of subvented NGOs;

d) the impact of the LSG on the quality of welfare service; and

e) the handling of complaints related to implementation. 2. To report findings and make recommendations to the Secreta

ry for Labour and Welfare

Page 5: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

5

Spirit & basic principles of LSG

Rationale for setting up of the LSG

subvention system:

To replace the inflexible, complex and

bureaucratic Model System and

Modified Standard Cost System

Page 6: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

6

Spirit & basic principles of LSG

1 A commitment of the government to meet service needs

2 Introduction of an improved subvention system for NGOs to deliver the services

Objectives :

Page 7: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

7

Spirit & basic principles of LSG

1 Flexibility

2 Transparency

3 Partnership between SWD & NGOs

4 Benchmark approach in allocations

With the above objectives, the following basic principles are to be observed:

Page 8: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

8

Spirit & basic principles of LSG

According to the LSG Manual, “NGOs will be given flexibility in the deployment of funds to meet the service needs….With the exception of a few designated items, NGOs may freely deploy the funds as long as the required objectives, outputs, results and standards are met…….”

1 Flexibility

Page 9: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

9

Spirit & basic principles of LSG

Flexibility – problems encountered :

With FSA, LSG does not allow NGOs to really ‘deploy’ funds in delivering services beyond the FSA scope though they are much needed in the community ----- flexibility only in a narrow sense of deployment of funds on staffing/PE; but not on meeting the service needs which can be changing very fast.

Page 10: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

10

Spirit & basic principles of LSGFlexibility – problems encountered :

Lot of tedious workload for agencies:

(i) Lots of reporting & making justifications on agencies’ expenditures (e.g., on items over 5% variance as compared with the previous year)

(ii) Lots of checking/disagreements on ‘recognized’ & ‘non-recognized’ items (e.g., directors’ & officers’ liability insurance)

(iii) Lots of checking in ‘preventing’ cross-subsidies for non-LSG activities

Agencies not treated as a ‘one-whole’ organization!!!

Page 11: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

11

Spirit & basic principles of LSG

No transparency on how the resources are allocated to NGOs at all by SWD. Without the transparency, agencies are difficult to formulate their planning, in particular on HR-related matters.

2 Transparency

Page 12: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

12

Spirit & basic principles of LSGTransparency

Transparency is only required on NGOs’ management, but not on SWD. NGOs are:

- Not given the basis for calculating for new services- Not given the basis for calculating resources for new units of existing services- Not given the basis for calculating ‘add-on’ resources- Not given the basis for calculating resources for in-situ expansion- Not given the basis for revised allocations to NGOs subsequent to each adjustment

Page 13: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

13

Spirit & basic principles of LSG

Original objective of setting up LSG :

“…..SWD is committed to introducing a package of measures to both the funding & monitoring of services provided by the subvented sector to meet service objectives…..The improvements made to service monitoring and funding will lay a solid foundation for the Government to work with service providers to improve the welfare planning framework and process.” ------- implying a partnership/collaboration relationship

3 Partnership between SWD & NGOs

Page 14: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

14

Spirit & basic principles of LSG

No equilibrium partnership relationship is found. Rather, agencies’ goodwill is always ‘exploited’, such as :

1 Agencies still suffer from the budget cut by the govt even though there is a benchmark for LSG that has been agreed by both sides at implementation

2 Agencies have no ‘say’ even though the govt does not honour their pledge/commitment (e.g., provide welfare planning framework)

Partnership between SWD & NGOs

Page 15: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

15

Spirit & basic principles of LSG

The use of the mid-point allocations and notional

staffing establishment being the ‘gist’ of LSG

allocations.

Problem ----- no review mechanism in face of :

(i) the ever changing social & economic environment and community needs which affect optimal staff mix and staff establishment

(ii) the growing maturity of the work force of the sector

(iii) the ‘market’ demand of different posts

4Benchmark approach in allocations

Page 16: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

16

Spirit & basic principles of LSG

Proposed measures for improvement:

- To reconfirm the spirit and basic principles of LSG and clarify their application in implementation of the subvention system

- To set up a platform between the Department and NGOs for better communication ----- to discuss and update on agencies’ needs so as to make adjustment from time to time

- To establish a platform for appeal when there are disputes

Page 17: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

17

Irregularities and inconsistencies in actual implementation

Examples of irregularities:

- No supervisory nor clerical support for new ‘add-ons’

- Irregularities on the unit costs for some services when they are contracted to NGOs through different modes

- Difficult to integrate the new ‘add-ons’ to the original services since no formula nor calculation basis for the ‘add-ons’ are provided to NGOs

Page 18: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

18

Irregularities and inconsistencies in actual implementation

Examples of inconsistency:

- The existing Grant Code create lots of complication during cross-services or cross-units staff movement, staff deployment & apportion of manpower especially during audit

- The approved items for LF Block Grant are unclear ─ difficult for agencies to determine which items should or should not be included in their applications

- Different requirement of SWD and HKICPA regarding accural basis accounting and depreciation practices cause extra workload

- The inadequacy of funding from Lotteries Fund Block Grant for repair & maintenance

- Different benchmark between old & new services (commenced after 1/1/2008)

Page 19: 1 Forums on Lump Sum Grant Review Forum One 18 March 2008.

19

Irregularities and inconsistencies in actual implementation

Proposed measures for improvement:

- To clarify with NGOs on all the irregularities & inconsistent areas

- To set up a platform with NGOs, especially with their accounting staff, on the unclear areas and then to set up a regular meeting for the Finance Branch to communicate with agencies’ staff on SWD’s accounting requirements