Final Estimatesand

Asphalt Reports

Page 2: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

2

Setting Spread Rate For Asphalt Base

Page 3: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

3

Setting Spread Rate For Asphalt Super-pave Concrete

Page 4: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

4

Setting Spread Rate For Asphalt Concrete Friction Course

Page 5: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

5

Page 6: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

6

Page 7: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

7

Roadway Target Spread Rate

The Target for Traffic Level D, Design Mix SP 04-3807, Coarse SP-9.5 with a gmm of 2.339.

43.3 lbs./SY x 2.339 = 101.28 Lbs/SY/in. 101.28 Lbs/ in. x 1.5” = 151.92 lbs./SY or

a target of 152 lbs./SY +/- 5% Minimum = 144.4 lbs/SY Maximum = 159.6 lbs/SY

Page 8: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

8

Asphalt Road Reports

Page 9: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

9

Page 10: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

10

Target Spread Rate Set

Page 11: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

11

Page 12: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

12

Asphalt Road Report Header

Page 13: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

13

Page 14: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

14

Page 15: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

15

Page 16: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

16

Page 17: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

17

Page 18: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

18

Page 19: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

19

330-2.2 Minimum Process Control Testing Requirements

5. Monitor the mix spread rate at the beginning of each day’s production, and as needed to control the operations, at a minimum of once per 200 tons (200 metric tons) placed to ensure that the spread rate is within 5% of the target spread rate. When determining the spread rate, use an average of five truckloads of mix.

If the Contractor fails to maintain the construction process in accordance with the approved Quality Control Plan, the Engineer may elect to stop the construction operation at any time until the deficiencies are corrected.

Page 20: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

20

Page 21: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

21

Target and Actual Spread Rate

Page 22: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

22

Page 23: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

23

Paving Completed

Page 24: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

24

Pay Is Limited To 105% Of Set Spread Rate

Page 25: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

25

Page 26: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

26

Lot Density

Page 27: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

27

How the Quantities of Density and Non-Density Tons Affect

the Composite Pay Factor (CPF)

Page 28: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

28

Page 29: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

29

Page 30: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

30

Page 31: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

31

Page 32: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

32

Page 33: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

33

Page 34: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

34

Page 35: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

35

Page 36: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

36

Page 37: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

37

Page 38: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

38

Page 39: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

39

Plant Reports

Page 40: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

40

Page 41: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

41

Page 42: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

42

Lot Submittal Package

Page 43: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

43

Page 44: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

44

Page 45: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

45

Page 46: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

46

Page 47: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

47

Page 48: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

48

Page 49: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

49

Page 50: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

50

Page 51: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.

51