Transcript of 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base.
1
Final Estimatesand
Asphalt Reports
2
Setting Spread Rate For Asphalt Base
3
Setting Spread Rate For Asphalt Super-pave Concrete
4
Setting Spread Rate For Asphalt Concrete Friction Course
5
6
7
Roadway Target Spread Rate
The Target for Traffic Level D, Design Mix SP 04-3807, Coarse SP-9.5 with a gmm of 2.339.
43.3 lbs./SY x 2.339 = 101.28 Lbs/SY/in. 101.28 Lbs/ in. x 1.5” = 151.92 lbs./SY or
a target of 152 lbs./SY +/- 5% Minimum = 144.4 lbs/SY Maximum = 159.6 lbs/SY
8
Asphalt Road Reports
9
10
Target Spread Rate Set
11
12
Asphalt Road Report Header
13
14
15
16
17
18
19
330-2.2 Minimum Process Control Testing Requirements
5. Monitor the mix spread rate at the beginning of each day’s production, and as needed to control the operations, at a minimum of once per 200 tons (200 metric tons) placed to ensure that the spread rate is within 5% of the target spread rate. When determining the spread rate, use an average of five truckloads of mix.
If the Contractor fails to maintain the construction process in accordance with the approved Quality Control Plan, the Engineer may elect to stop the construction operation at any time until the deficiencies are corrected.
20
21
Target and Actual Spread Rate
22
23
Paving Completed
24
Pay Is Limited To 105% Of Set Spread Rate
25
26
Lot Density
27
How the Quantities of Density and Non-Density Tons Affect
the Composite Pay Factor (CPF)
28