FB 2 STARTING PROCEDURES
RADIO MASTER SWITCH
UP IS“ON”
Assess readiness to get underway
Energize the following:
1) Radio Master Switch, Panel DC-1
NOTE This energizes the pre-adjusted, fixed mount radios (three Marine VHF radios and the LAFD “Astro” 800 MHz radio at the Chart Table).
![Page 2: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/2.jpg)
2
FB 2 STARTING PROCEDURES
Chart Table Consoles Forward and Aft
Energize the following:
![Page 3: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/3.jpg)
3
FB 2 STARTING PROCEDURES
LAFD MOTOROLA (handheld) radio
Energize the following:
![Page 4: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/4.jpg)
4
FB 2 STARTING PROCEDURES
Loudhailer
Energize the following:
CLOCKWISE for“ON”
![Page 5: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/5.jpg)
5
FB 2 STARTING PROCEDURES
ARDF, Forward Center Console
Radio Direction Finder
Energize the following:
![Page 6: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/6.jpg)
6
FB 2 STARTING PROCEDURES
UP FOR “ON”
MIDDLE POSITION FOR
“OFF”
DOWN FOR EMERGENCY
POWER SUPPLY
Lighting (navigation and emergency) as needed
SELECT DIRECTION OF TRAVEL
![Page 7: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/7.jpg)
7
FB 2 STARTING PROCEDURES
Emergency (blue) Lights
![Page 8: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/8.jpg)
8
FB 2 STARTING PROCEDURES
MDT on Chart Table
![Page 9: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/9.jpg)
9
FB 2 STARTING PROCEDURES
PITCHINDICATORS
SET ATZERO
![Page 10: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/10.jpg)
10
FB 2 STARTING PROCEDURES
VOITH ZEROPITCH
![Page 11: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/11.jpg)
11
FB 2 STARTING PROCEDURES
Verify green light(s) on Switchboard Monitoring Panel signifying Generator(s) ON LINE and Shore Power disconnected
ILLUMINATED:SIGNIFIES STBD
GEN ON LINE
SHORE POWER ON LINE
SHORE POWER AVAILABLE
SHORE POWER CONNECTED
PORT GEN RUNNING
STBD GEN RUNNING
PORT GEN ON LINE
STBD GEN ON LINE
![Page 12: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/12.jpg)
12
FB 2 STARTING PROCEDURES
YELLOW LED INDICATOR LIGHTS
ILLUMINATE TO SIGNIFY
“READY FOR OPERATION”
and
“REMOTE OPERATION”
Verify that Main Engine MTUs in Pilot House indicate “READY FOR OPERATION” and “REMOTE OPERATION”
![Page 13: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/13.jpg)
13
FB 2 STARTING PROCEDURESPRELUBE
STARTPRELUBE
COMPLETE
Start Main Engines upon completion of PRELUBE sequence
![Page 14: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/14.jpg)
14
FB 2 STARTING PROCEDURES
MAIN ENGINE START
Communicate with Mate at Bow; order “Cast off all lines”Proceed upon “All Clear” signal from Mate
Start Main Engines upon completion of PRELUBE sequence
![Page 15: 1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.](https://reader036.fdocuments.us/reader036/viewer/2022070605/5a4d1af37f8b9ab05997fdc4/html5/thumbnails/15.jpg)
15
FB 2 STARTING PROCEDURES
MATE
In charge of deck operationVerify that Off Ship Alarm is turned to “OFF” position before Shore Power is
turned off
Assess Fireboat 2 for readiness to cast offBow Watch
Communication Pilot to Mate: “Cast off”
Mate to Deckhands: “Cast Off”
Mate to Pilot: “All clear to get underway”