1Experience-Based Approaches to Process Improvement© Otto Vinter /
Quality Week 2000
Experience-Based Approaches toProcess Improvement
-
Otto VinterProject Manager Software Process Improvements,
DELTA Software Engineering,Tel: +45 4586 7722, Fax: +45 4586 5898
&
Software Engineering Mentor
Tel/Fax: +45 4399 2662, Mobile: +45 4045 0771
[email protected] http://inet.uni2.dk/~vinter
2Experience-Based Approaches to Process Improvement© Otto Vinter /
Normative Models for SPI
CMM
BOOTSTRAP
SPICE (ISO15504)
Defined comprehensive process
Levels of maturity (capability)
Key process areas (KPAs) for each level
Assessed by certified assessors
3Experience-Based Approaches to Process Improvement© Otto Vinter /
Fundamentals in Normative Models
Software Process Assessment & Improvement(The BOOTSTRAP Approach)ISBN 0-631-19663-3
4Experience-Based Approaches to Process Improvement© Otto Vinter /
Problems with Normative Models
Abstract model
Assessment by external body
Costs money
Organisational focus
Points out KPAs to be improved
Little help on precisely what to do
Raises a lot of expectations
5Experience-Based Approaches to Process Improvement© Otto Vinter /
Alternative Approaches to SPI
Experience-based improvement actions
• Analyse problems from previous projects to extract knowledge on frequently occurring problems
• Change the development process through the use of an optimum set of methods and tools available to prevent these problems from reappearing
• Measure the impact of the changes in a real-life development project
• Diffuse the results to the rest of the organisation
6Experience-Based Approaches to Process Improvement© Otto Vinter /
Characteristics of Alternative Approaches
Experience-based
No specific model
Hot-spot driven
Focus on prevention
One issue at a time (incremental)
Piloting at project level
Evolve rather than define (feed-back)
Fits CMM level 1-2 cultures (where most of us are)
7Experience-Based Approaches to Process Improvement© Otto Vinter /
Examples of Alternative Approaches
Analysis of• defects• progress reports, etc.
Structured/Selective interviews• project managers• project members• customers, etc.
Goal-Question-Metric paradigm (GQM)
Some frameworks for alternative approaches:• Experience Factory (V. Basili e.a.) • Product Process Dependency Models
(PROFES: www.ele.vtt.fi/profes)• but primarily: you must find your own way
8Experience-Based Approaches to Process Improvement© Otto Vinter /
Brüel & Kjær - Sound & Vibration Measurement
Transducer Signalconditioning
Digitalconversion
Signalprocessing
Postprocessing
Output
Brüel & Kjær
Conditioning Amplifier
ISO 9001CERTIFIED
9Experience-Based Approaches to Process Improvement© Otto Vinter /
Defect Analysis from Error Logs
Definitions• Bugs are anything between serious defects and
suggestions for improvements• Problem reporting starts in the integration phase
Error Logs Analysed• Embedded and PC Windows development projects• Project sizes app. 5-7 person years• In total app. 1000 bugs analyzed in detail• Problem reports covered a period until 18 months after
first release
10Experience-Based Approaches to Process Improvement© Otto Vinter /
Problem Report Distribution over Time
Example of an Error-prone Product
Weeks
Bug
s R
epor
ted
Trial-releaseProduction-release
11Experience-Based Approaches to Process Improvement© Otto Vinter /
Defect Analysis Technique
Interview sessions• 1-2 developers and 1-2 process consultants• app. 5 minutes / bug
Bug Categorisation• based on a bug taxonomy by Boris Beizer:
- Boris Beizer: Software Testing Techniques, Van Nostrand Reinhold, 1990
• comprehensive set of bug categories and statistics
Capture Subjective Information on the Bugs • where and how the bug occurred• quality factor (reliability, usability, functionality ...)• complexity of bug (correction cost)• what could prevent the bug
12Experience-Based Approaches to Process Improvement© Otto Vinter /
The Beizer Bug Taxonomy
1. Requirements and Features
2. Functionality as Implemented
3. Structural Bugs
4. Data
5. Implementation (standards violation, and documentation)
6. Integration
7. System and Software Architecture
8. Test Definition or Execution Bugs
9. Other Bugs, Unspecified
Each category detailed to a depth of up to 4 levels
13Experience-Based Approaches to Process Improvement© Otto Vinter /
0,0 5,0 10,0 15,0 20,0 25,0
1. Requirements and Features
2. Functionality as Implemented
3. Structural Bugs
4. Data
5. Implementation
6. Integration
7. System and Software Architecture
8. Test Definition or Execution Bugs
9. Other Bugs, Unspecified
%
Our Analysis
Beizer
Problem Report Categorization
Category
14Experience-Based Approaches to Process Improvement© Otto Vinter /
1st Action: The Prevention of Errors through Experience-driven Test Efforts (PET)
Results of the analysis of error logs• no special bug class dominates embedded software
development• requirements problems, and requirements related
problems, are the prime bug cause (>36%)• problems due to lack of systematic unit testing is the
second largest bug cause (22%)
Action: Improve Testing Processes• static analysis
- source code complexity, data flow anomalies, coding standards
• dynamic analysis- code coverage by test cases, cross references code to test cases
Funded by CEC. Final Report: http://www.esi.es/ESSI/Reports/All/10438
17Experience-Based Approaches to Process Improvement© Otto Vinter /
Test Coverage Strategy
Test coverage must take into consideration• perceived complexity
- based on a visual inspection• criticality
- product and project issues• developer experience
- domain, product, and unit• bug and change request history• degree and type of reuse
Test cases for dynamic analysis are selected by normal testing techniques
• equivalence partitioning, boundary value analysis etc.
18Experience-Based Approaches to Process Improvement© Otto Vinter /
Results of the Improved Testing Process
46% Improvement in Testing Efficiency• Removing static bugs
• Increasing unit branch coverage to > 85%
75% Reduction in Production-Release Bugs• Compared to Trial-Release
70% Requirements Bugs in Production-Release
Next Action: Improve Requirements Engineering
19Experience-Based Approaches to Process Improvement© Otto Vinter /
2nd Action: A Methodology for Preventing Requirements Issues from Becoming Defects (PRIDE)
Results of the analysis of error logs• Requirements related bugs 51%• Usability issues dominate 64%• External software (3rd party & MS products) 28%
Action: Introduce requirements techniques• Use Situations (Scenarios)
- Relate demands to use situations. Describe tasks for each scenario.
• Usability Test, Daily Tasks, Navigational Prototype- Check that the users are able to use the system for daily tasks,
based on a navigational prototype of the user interface.
Funded by CEC. Final Report: http://www.esi.es/ESSI/Reports/All/21167
20Experience-Based Approaches to Process Improvement© Otto Vinter /
Scenarios
“The defining property of a scenario is that it projects a concrete description of activity that the user engages in when performing a specific task, a description sufficiently detailed so that design implications can be inferred and reasoned about”
John M. Carroll,Scenario-Based Design:
Envisioning Work and Technology in System Development,
Wiley 1995.
Many names for the same concept:• scenarios• use situations• work situations• work setting
21Experience-Based Approaches to Process Improvement© Otto Vinter /
Road Test Scenario
Road tests are done in the car when it is driving on special test roads. The purpose of the recordings is to identify noise sources, comparing them to earlier measurements, and eventually removing the noise through changes to the car design.
The engineer will record noises from various parts of the car when it is driving at various speeds, when it is turning, when it is breaking, etc. The microphone will have to be mounted at various places not accessible from the drivers seat.
Usually, the engineer has a plan for what to measure, but circumstances may change so that he has to do something different and later find out what he actually did and which sounds relate to what.
Back at the lab the sounds will be analyzed by the engineer himself, or - in many cases - someone else.
22Experience-Based Approaches to Process Improvement© Otto Vinter /
Usability Test Environment
PC
V
• •
Experiment Leader
User
Log Keeper
Tape Recorder
Microphone
23Experience-Based Approaches to Process Improvement© Otto Vinter /
Results of the 2nd Improvement Action
Product is selling steadily more than twice as many copies
• compared to a similar product developed for a similar domain by the same team
Usability is exceptional in the market• Users’ interaction with the product was totally changed
as a result of the early usability tests
Almost 3 times increase in productivity for the development of the user interface
27% reduction in problem reports
24Experience-Based Approaches to Process Improvement© Otto Vinter /
Improvement Approach Based on Project Manager Perceived Problems
Interview project managers• 1 project manager and 3 process consultants• app. 1 hour per interview• process-oriented interview guide
Analyze problems raised• classify the problems according to software process • present the issues at a project manager workshop• establish consensus on a few major issues• let each manager select an issue to improve
Monitor development projects• introduce and train the team on the selected issue • coach, and support regularly and on request• collect experience and results
25Experience-Based Approaches to Process Improvement© Otto Vinter /
Improvement Approach Based on Project Manager Perceived Problems
Major Issues • iterative software development model• requirements• project monitoring (estimation, progress evaluation, etc.)• project conclusion (test, configuration management, etc.)
Improvement Actions:• diffuse and adopt the test and requirements techniques • define new iterative development models• improve project monitoring
Results:• improvement actions were performed with enthusiasm• project related actions completed successfully
26Experience-Based Approaches to Process Improvement© Otto Vinter /
3rd Action: Iterative Software Development Model
DemoPrototype
FunctionallyComplete
Model
Specification
Spec.
Test
Design
Test
Code Code Code Code
Design Design Design
Test Test
Spec. Spec. Spec.
Customer Req. Spec. Validation
ReleaseVers. 1.0
FinalCustomerValidation
IntermediateCustomerValidation
Pre-Project
StabilizationPartial Implementation
Full Implementation
Specificationand user interface
mock-up
ReleasedProduct
CustomerViews:
ProductViews:
Cycles:
Phases: Specification Development Operation
DevelopmentViews:
27Experience-Based Approaches to Process Improvement© Otto Vinter /
Iterative Software Development Model
Types of Iteration• user validation (usability test)• exploration (e.g. performance)• proof-of-concept (e.g. architecture)• well-defined functionality (increment)
Duration • time-boxed
- less than 6 weeks, with 2 weeks spacing
• full increments- app. 3 months, with 2 weeks of stabilization
Essential for Success• user validation • stabilization
28Experience-Based Approaches to Process Improvement© Otto Vinter /
Results of the 3rd Improvement Action
• drive and motivation of team increased dramatically• turbulence within and around team decreased • control over project progress increased • requirements creep was kept under control• resources used more efficiently• serious problems were uncovered early• quality improved step-by-step
29Experience-Based Approaches to Process Improvement© Otto Vinter /
Comparison of Recommendations
Recommendation Defect 1st Bootstrap Project Mgr. 2nd Bootstrap Analysis Assessment Interviews Assessment
Development Model - iterations x x x - risk management x
Requirements x x x
Project Monitoring - estimation x x x
- time & resource usage x x
- monitor progress x x x
Project Conclusion - configuration mgmt. x x x
- testing x x x ()
- release criteria x x
Reuse x
Process Descriptions x
30Experience-Based Approaches to Process Improvement© Otto Vinter /
Problem Diagnosis Results
Defect analysis from error logs• has established a basic process for testing and release
• has improved our requirements process and products
Improvements from interviews• successful diffusion and adoption of previous
improvement actions
• established a new software development model
Impacts on maturity• development model, test, and requirement issues are no
longer on the Bootstrap recommendation list
31Experience-Based Approaches to Process Improvement© Otto Vinter /
In Conclusion
Problem diagnosis approach• is a simple and effective way to find problems in the
software development process
• good starting point for process improvement programmes in companies
• step-wise improvements with quick wins
• changes assessment recommendations
However, normative models are needed• comprehensive framework
- KPAs are important, levels are not
• established assessments
- effect of improvements