1 Engineering Project Management

Transcript of 1 Engineering Project Management. 2 Define the terms project and project management, and...

Page 1: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

1

Engineering Project Management

Page 2: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

2

Engineering Project Management

• Define the terms project and project management, and differentiate between project and process management.

• Describe the causes of failed engineering / technology projects.

• Describe the basic competencies required of project managers.

• Describe the basic functions of project management.

• Differentiate between PERT and Gantt charts as project management tools.

Page 3: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

3

Overview

• Describe eight activities in project management.• Define scope and write a statement of work, to document

scope.• Use a work breakdown structure, to decompose a project

into tasks.• Estimate tasks’ durations, and specify intertask

dependencies on a PERT chart.• Assign resources to a project and produce a project

schedule with a Gantt chart.• Assign people to tasks and direct the team effort• Use critical path analysis to adjust schedule and resource

allocations in response to schedule and budget deviations.• Manage user expectations of a project and adjust project

scope.

Page 4: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

4

What is your project management practice?

• Burn the mid night oil ?????• 24-7 in order to meet the deadline!

Page 5: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

5

Your own experiences

•From your past experiences, such as•Your C++ programming project •Subject based mini-project

•Did you apply any project management skills?

•Do you think a proper project management practice is necessary?

•What is/are the most important factor(s) affecting the progress, or success of your project?

Page 6: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

6

Theory of project management

Page 7: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

7

Project, Project Management, and Process Management

Project – a sequence of unique, complex, and connected activities having one goal or purpose and that must be completed by specific time, within budget (and other resources), and according to specifications/requirements.

Page 8: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Project management

• Project management – the process of scoping, planning, staffing, organizing, directing, and controlling the development of an acceptable system at a minimum cost within a specified time frame. The project management is a subset of management.

• There are four (4) management functions: planning, organizing, directing, and controlling.

8

Page 9: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

9

Measures of Project Success

SIX (6) criteria for project success:– The resulting system is acceptable to the customer– The system was delivered “on time.”– The system was delivered “within budget and allocated

resources.”– The process and the final system is up to required standard.– All the documentation (i.e. reports) are well written and

complied.– The system development process had a minimal impact on

ongoing business operations. (in FYP cases, i.e. not have adverse effect on study of your other subjects)

Page 10: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

10

Some Common Causes of Project Failure

• Complete failure in time management / project scheduling

• Lack of commitment to the project– Depends on your expectation

• Taking shortcuts through or around the system development methodology

Page 11: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Some Common Causes of Project Failure

• Poor expectations management (unlikely in a final year project)– Scope creep (範疇蔓延 ) – the unexpected

and gradual growth of requirements during the project.

– Feature creep (功能蔓延 ) – the uncontrolled addition of technical features to a system.

• Premature commitment to a fixed budget and schedule– Are you willing to spend more than $1200?

11

Page 12: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

12

Causes of Project Failure

• Poor estimating techniques• Overoptimism

– Or over confident• The mythical man-month (name of a book written

by Brooks, 1975)– Adding manpower to a late project makes it later!

• Inadequate people management skills (for team projects) – only 1 student doing all the works

• Insufficient resources– Supervisor to blame?

• Failure to “manage to the plan”– Do you have a plan?

Page 13: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

13

Project Manager Competencies

• Business awareness

• Business partner orientation

• Commitment to quality

• Initiative

• Information gathering

• Analytical thinking

• Conceptual thinking

• Interpersonal awareness

• Organizational awareness

• Anticipation of impact

• Resourceful use of influence

• Motivating others

• Communication skills - written, oral & graphical

• Developing others

• Monitoring and controlling

• Self-confidence

• Stress management

• Concern for credibility

• Flexibility

(Adapted from Wysocki, Beck, and Crane, Effective Project Management: How to Plan, Manage, and Deliver Projects on Time

and within Budget.)

Page 14: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Project manager

14

Who is the project manager?Your supervisor?Your group mate?Nobody?

Page 15: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

15

Project Management Functions

Eight (8) functions performed by every project manager:

• Scoping – setting the boundaries of the project

• Planning – identifying the tasks required to complete the project

• Estimating – identifying the resources required to complete the project

• Scheduling – developing the plan to complete the project

• Organizing – making sure members understand their roles and responsibilities

• Directing – coordinating the project

• Controlling – monitoring progress

• Closing – assessing success and failure

Page 16: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

16

Project Management Tools & Techniques

PERT chart (Programme Evaluation & Review Techniques) – a graphical network model used to depict the interdependencies between a project’s tasks.

Gantt chart – a bar chart used to depict project tasks against a calendar.

Page 17: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

17

PERT Chart

Page 18: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

18

Gantt Chart

Page 19: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

19

Microsoft Project Gantt Chart

Page 20: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

20

Microsoft Project PERT Chart

Page 21: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

21

Activity 1 – Negotiate Scope

Scope – the boundaries of a project – the areas of a business that a project may (or may not) address. Includes answers to five (5) basic questions:

– Product – Quality – Time – Cost

– *Resources - Manpower, Money, Material, Equipment, Facility, Information/Technology

Statement of work – a narrative description of the work to be performed as part of a project. Include scope statement, project definition, project overview, and document of understanding.

Page 22: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

22

Scope of project

• Are you dare to tell your supervisor that the scope is too large?

• Are you dare to tell your supervisor that the project is too difficult to handle?

• Did you talk to your supervisor related to the scope?

Page 23: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Sample statement of work

• http://contracts.onecle.com/navisite/clearblue.sow.2003.01.01.shtml

23

Page 24: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

24

Statement of Work

I. Purpose

II. BackgroundA. Problem, opportunity, or directive statementB. History leading to project requestC. Project goal and objectivesD. Product description

III. ScopeA. StakeholdersB. DataC. ProcessesD. Locations

IV. Project ApproachA. RouteB. Deliverables

V. Managerial / Technical ApproachA. Team building considerationsB. Manager and experienceC. Training requirements

(continued)

Page 25: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

25

Statement of Work (concluded)

V. Managerial / Technical Approach (continued)D. Meeting schedulesE. Reporting methods and frequencyF. Conflict managementG. Scope managementH. Techniques/algorithm/methods to be used

VI. ConstraintsA. Start dateB. DeadlinesC. BudgetD. Technology

VII. Ballpark Estimates (ballpark – approximately)A. ScheduleB. Budget

Page 26: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

26

Statement of Work

VIII.Conditions of Satisfaction (what need to be done to get the grade that you want)

A. Success criteriaB. AssumptionsC. Risks

IX. Appendices

Page 27: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

27

Activity 2 – Identify Tasks

Work breakdown structure – a graphical tool used to depict the hierarchical decomposition of the project into phases, activities, and tasks.

For example to build an aircraft

structure – wings, tail, crew compartment , fuselage

Fuselage – primary structure, secondary structure

Page 28: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

WBS

Milestone – an event signifying the completion of a major project deliverable. How to get a Grade C – completing phase A

How to get a Grade B – completing phase B

How to get a Grade A – completing all phases

28

Page 29: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

29

A Graphical Work Breakdown Structure

Page 30: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

30

Page 31: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

31

Page 32: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Work breakdown

32

Some widely used reasons for creating a WBS include:•Assists with accurate project organization•Helps with assigning responsibilities•Shows the control points and project milestones•Allows for more accurate estimation of cost, risk and time•Helps explain the project scope to stakeholders

Page 33: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Work breakdown

• The project manager and subject matter experts determine the main deliverables for the project.

• Once this is completed, they start decomposing the deliverables they have identified, breaking them down to successively smaller chunks of work.

• How small?– Two weeks rule (able to complete in two weeks)

– 8/80 rule (no less than 8 hours or longer than 80 hours)

– 100% rule (the sub-tasks must to equal to the task in the upper level)

33

Page 34: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

34

No Type of Task Description of Task1 Main Task Physical transportation of items from old to new

office1.1 Sub-task Order Crates1.2 Sub-task Pack office equipment and documentation into crates1.3 Sub-task Transport crates to new office1.4 Sub-task Transport furniture and equipment to new office1.5 Sub-task Unpack crates1.6 Sub-task Arrange for removal of crates2 Main Task Transferring of telephones and networks2.1 Sub-task Arrange transfer of phone numbers to new office (or

allocation of new numbers)2.2 Sub-task Installation of cables2.3 Sub-task Installation of any additional sockets in new office2.4 Sub-task Installation of telephones and fax machine in new

office2.5 Sub-task Installation of PCs and printers in new office

Work Breakdown Structure Template – partially completed using an example of some of the work involved in an office

move

Page 35: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

35

Activity 3 – Estimate Task Durations

1.  Estimate the minimum amount of time it would take to perform the task – the optimistic duration (OD).

2.  Estimate the maximum amount of time it would take to perform the task – the pessimistic duration (PD).

3.  Estimate the expected duration (ED) that will be needed to perform the task.

4.  Calculate a weighted average of the most likely duration (D) as follows:

D = (1 x OD) + (4 x ED) + (1 x PD) 6

3.33 days = (1 x 2 days) + (4 x 3 days) + (1 x 6 days) 6

PDEDOD

Page 36: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Exercise

• Based on your own project– Derive a work breakdown structure – Estimate task durations– Identify three milestones (based on expected grade)

36

Page 37: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

37

Scheduling Strategies

Forward scheduling – a project scheduling approach that establishes a project start date and then schedules forward from that date.

Reverse scheduling – a project scheduling strategy that establishes a project deadline and then schedules backward from that date.

Page 38: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

38

Activity 5 – Assign Resources

• People – includes all the system owners, users, analysts, designers, builders, external agents, and clerical help that will be involved in the project in any way.

• Services – includes services such as a quality review that may be charged on a per use basis.

• Facilities and equipment – includes all rooms and technology that will be needed to complete the project.

Page 39: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

39

Assign Resources

• Supplies and materials – includes everything from pencils, paper, notebooks to toner cartridges, and so on.

• Money – includes a translation of all of the above into budgeted dollars!

Page 40: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

40

Resource Leveling

Resource leveling – a strategy for correcting resource overall allocations or unbalanced use of resources

There are two techniques for resource leveling:task delaying – when more resources are needed than

are available. Delaying task until resources are available

task splitting – divided into sub-tasks utilize the available resources

Page 41: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Resources

Six (6) Resources- 1. Manpower, 2. Money, 3. Material, 4. Equipment, 5. Facility, 6. Information/Technology

41

Page 42: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

42

Activity 6 – Direct the Team Effort

• Supervision resources– The Deadline: A Novel

about Project Management– The People Side of

Systems

• Stages of Team Maturity (see figure to the right)

Page 43: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

43

10 Hints for Project Leadership

• Be Consistent.• Provide Support.• Don’t Make Promises You Can’t Keep.• Praise in Public; Criticize in Private.• Be Aware of Morale Danger Points.• Set Realistic Deadlines.• Set Perceivable Targets.• Explain and Show, Rather Than Do.• Don’t Rely Just on [Status Reports].• Encourage a Good Team Spirit.

Page 44: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

44

Activity 7 – Monitor and Control Progress

• Progress reporting

• Change management

• Expectations management

• Schedule adjustments—critical path analysis ( CPA)

Page 45: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

45

Sample Outline for a Progress Report

I. Cover PageA. Project name or identificationB. Project managerC. Date or report

II. Summary of progressA. Schedule analysisB. Budget analysisC. Scope analysis (describe any changes that may have an impact on future progress)D. Process analysis (describe any problems encountered with strategy or methodology)E. Gantt progress chart(s)

III. Activity analysisA. Tasks completed since last reportB. Current tasks and deliverablesC. Short term future tasks and deliverables

(continued)

Page 46: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

46

Sample Outline for a Progress Report (concluded)

IV. Previous problems and issuesA. Action item and statusB. New or revised action items 1. Recommendation 2. Assignment of responsibility 3. Deadline

V. New problems and issuesA. Problems (actual or anticipated)B. Issues (actual or anticipated)C. Possible solutions 1. Recommendation 2. Assignment of responsibility 3. Deadline

VI. Attachments(include relevant printouts from project management software)

Page 47: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

47

Change Management

Change management – a formal strategy in which a process is established to facilitate changes that occur during a project.

Page 48: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Change management

Changes can be the result of various events and factors including:– An omission in defining initial scope– A misunderstanding of the initial scope– An external event such as government

regulations that create new requirements

48

Page 49: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Change management

– Organizational changes– Availability of better technology– Shifts in planned technology that force

unexpected and significant changes to the business organization, culture, and/or processes

– Management’s desire to have the system do more than was originally requested or agreed to

– Reduced funding for the project or imposition of an earlier deadline.

49

Page 50: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

50

Examples– As the project progresses, the customer discovers

additional scope that they would like added to the project. The project manager accepts the new scope with the intention of “fitting it in” somewhere. Even if a log is kept that records this additional scope, the customer expectation for delivery date has not changed. They expected the product to be delivered on October 15th. Now when the due date starts getting near, the project is falling behind and either 1) misses the delivery date or 2) cuts corners in testing or other areas to make it on time.

Page 51: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

51

Change management example

Scenario 2– As the project progresses, the customer discovers

additional scope that they would like added to the project. The project manager and team work with the customer to fully understand what they are asking for. Additional scope WILL cost more. The customer should decide whether delivering on time is the most important factor (time-constrained project) or if the delivery date can be pushed out to accommodate the additional scope. If the project is time constrained, additional resources (or overtime cost) will be added to the project to finish more work in the same duration.

Page 52: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Change management example

• Working together, the project team and customer do an impact analysis to identify how much additional work is really required, how much longer it will take, and how much more it will cost. Whatever the outcome, the customer expectations have been updated to reflect the NEW baseline delivery date and cost. The customer can choose to reject the change request and continue as planned, or approve the change request and update the baseline.

52

Page 53: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

53

Change control

• In both of the scenarios above, the same scope was added. In Scenario 1, the project will be delivered late or with an unthoughtful decrease in quality or functionality. Because expectations were never updated, this project is late.

• In Scenario 2, the project may be delivered later than the ORIGINAL baseline, but because good change control and management of customer expectations is in place, the TRUE baseline has been updated to reflect customer choice and the reality of the project. This project is not late (at least not due to expectation problems).

Page 54: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

54

Expectation management

• Traditional project management – time, cost, and scope– The quality is the central theme

• Modern project management – time, cost, scope and quality – Expectation is the central theme

希望越大失望越大

Page 55: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

55

Expectation management

cost time

scope

qualityexpectation

quality

time

cost

scope

Page 56: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Expectation management

• Ipad and Apad• Ipad is $5000• Apad is $1000• What is your expectation when buying an Ipad

comparin g to buying an Apad?

• Last Thursday no one was expecting a typhoon holiday! Because observatory informed you that the chance of a signal no. 8 was unlikely. Were you happy in morning to see the symbol of no. 8 ?

56

Page 57: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

57

Expectations Management

Expectations management (期望管理 ) matrix – a tool to help project managers set and monitor system’s owners and users’ expectation

The most importantThe second most important

The least important

Can have only one X in each row and each

column

Page 58: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

58

Expectation management matrix (EMM)

• The rows correspond to the measures of success in any project: cost, schedule and scope/or quality

• The columns corresponding to priorities: first P1, second P2, third P3

• Names are assigned to priorities– Maximize or minimize (most important for a given

project)– Constrain– accept

Page 59: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

59

Rules for EMM

• For any project, one must record a P1, a P2, and a P3 within the nine available cells

• No row may contain more than one Priority; a single measure of success must have only one priority designation

• No column may contain more than one Priority; there must be a first, second, and third priority.

Page 60: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

60

Example

• In 1961 President JF Kennedy established the charter for a major project – land man on the moon and return him safely before the end of the decade.

• The expectation of the project is shown in the next slide

Page 61: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

61

Lunar Project Expectations Management

Page 62: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

62

Result of the lunar project

• Scope and requirement achieved • Cost over spent by 50%• Most people perceived the project a monumental

success• Public’s expectation – realizing the maximum safety

and minimum risk, coupled with meeting the deadline was an acceptable trade-off for the cost overrun

Page 63: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

63

Typical, Initial Expectations for a Project

Page 64: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

64

EMM

• If unanticipated business problems are identified – Project behind schedule– User requirements expand (change in scope)

• Schedule slippage was the ‘accept’ priority – Not a major concern

• Scope increase is the more significant problem as added requirements will increase the cost of the project

• Discuss with the project owner to adjust the priority

Page 65: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

65

Adjusting Expectations

Page 66: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

66

Changing Priorities

Page 67: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Expectation management

• Focus on the issue that is most important and try to achieve that

• Once you can meet the expectation then minor “faults” become insignificant!

• When doing you project, make sure that you do know your supervisor’s expectation related to your project!

67

Page 68: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

68

Expectation management

• Identify a real-life example to reflect that expectation management is important.

Page 69: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Exercise

• Based on your own project, complete the Expectation management matrix

69

Page 70: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

70

PERT chart

• PERT – program evaluation and review technique• PERT is a model for project management designed to

analyze and represent the tasks involved in completing a given project

• PERT is a method to analyze the involved tasks in completing a given project, especially the time needed to complete each task, and identifying the minimum time needed to complete the total project.

Page 71: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

71

PERT chart Terminology

• A PERT event: is a point that marks the start or completion of one or more tasks. It consumes no time, and uses no resources. It marks the completion of one or more tasks, and is not “reached” until all of the activities leading to that event have been completed.

• A predecessor event: an event (or events) that immediately precedes some other event without any other events intervening. It may be the consequence of more than one activity.

event

event

Activity

Page 72: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

72

PERT Chart

• A successor event: an event (or events) that immediately follows some other event without any other events intervening. It may be the consequence of more than one activity.

• A PERT activity: is the actual performance of a task. It consumes time, it requires resources (such as labour, materials, space, machinery), and it can be understood as representing the time, effort, and resources required to move from one event to another. A PERT activity cannot be completed until the event preceding it has occurred.

Page 73: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

PERT event and activities

73

Event A13-Oct

Event B18-Oct

Activity

If the activity lasts for 5 days

Page 74: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

74

PERT terminology

• Optimistic time (O): the minimum possible time required to accomplish a task, assuming everything proceeds better than is normally expected

• Pessimistic time (P): the maximum possible time required to accomplish a task, assuming everything goes wrong (but excluding major catastrophes).

• Most likely time (M): the best estimate of the time required to accomplish a task, assuming everything proceeds as normal.

• Expected time (TE): the best estimate of the time required to accomplish a task, assuming everything proceeds as normal (the implication being that the expected time is the average time the task would require if the task were repeated on a number of occasions over an extended period of time).

– TE = (O + 4M + P) ÷ 6

Page 75: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

75

What is the duration of the project?

start

F

D

C

B E

G End

A

Page 76: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

76

PERT Terminology

• Critical Path: the longest possible continuous pathway taken from the initial event to the terminal event. It determines the total calendar time required for the project;

• any time delays along the critical path will delay the reaching of the terminal event by at least the same amount.

Page 77: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

77

What is the duration of the project?

start

F

D

C

B E

G End

A

If A-C-E-G is the critical path then you cannot delay these activities

Page 78: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Slack

• Slack: the slack of an event is a measure of the excess time and resources available in achieving this event. Positive slack(+) would indicate ahead of schedule; negative slack would indicate behind schedule; and zero slack would indicate on schedule.

• Slack is the possible delay of an activity not in the critical path

78

Page 79: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

79

Implementing PERT

• The first step to scheduling the project is to determine the tasks that the project requires and the order in which they must be completed.

• The order may be easy to record for some tasks (e.g. When building a house, the land must be graded before the foundation can be laid) while difficult for others (There are two areas that need to be graded, but there are only enough bulldozers to do one).

Page 80: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

PERT process precedence

• Example : to cook rice then you need to:– Wash the rice 1– Add suitable water to the container 2– Put the container into the rice cooker 3– Power on the rice cooker 4

80

Page 81: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

The PERT chart for rice cooking

81

start

end

1

2

3

4

Page 82: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Implementing PERT

• The time estimates usually reflect the normal, non-rushed time.

• Many times, the time required to execute the task can be reduced for an additional cost or a reduction in the quality

• Sometimes, extending the duration of a task will reduce its cost

82

Page 83: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

83

Example

Activity Predecessor Time estimates Expected time

Opt. (a) Normal (m)

Pess. (p)

A 2 4 6 4

B 3 5 9 5.33

C A 4 5 7 5.17

D A 4 6 10 6.33

E B,C 4 5 7 5.17

F D 3 4 8 4.5

G E 3 5 8 5.17

Page 84: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

84

PERT chart

start

F

D

C

B E

G End

A

Page 85: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

85

Network diagram

• A network diagram starts with a node “start”• The “Start” node has a duration of zero • Then you draw each activity that does not have a predecessor

activity and connect them with an arrow from start to each node (a, b).

• Next, since both c and d list a as a predecessor activity, their nodes are drawn with arrows coming from a. Activity e is listed with b and c as predecessor activities, so node e is drawn with arrows coming from both b and c, signifying that e cannot begin until both b and c have been completed.

• Activity f has d as a predecessor activity, so an arrow is drawn connecting the activities. Likewise, an arrow is drawn from e to g. Since there are no activities that come after f or g, it is recommended (but again not required) to connect them to a node labeled finish.

Page 86: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

86

Network diagram

The activity name The normal duration time The early start time (ES) The early finish time (EF) The late start time (LS) The late finish time (LF) The slack

Page 87: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

87

Network diagram

• In order to determine the information it is assumed that the activities and normal duration times are given. The first step is to determine the ES and EF. The ES is defined as the maximum EF of all predecessor activities, unless the activity in question is the first activity, for which the ES is zero (0). The EF is the ES plus the task duration (EF = ES + duration).

• The ES of the “End” is the expected duration of the project

Page 88: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Early start and early finish

88

tj = maxi [ti +Lij]

Page 89: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Example

89

a

b

c

4

5

EF=9

EF=6

What is the ES of C?

Page 90: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

90

Network diagram

• To determine the LF, needs to move backward• The LF is defined as the minimum LS of all successor

activities, unless the activity is the last activity, for which the LF equals the EF. The LS is the LF minus the task duration (LS = LF - duration).

Page 91: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Late finish and late start

Ti = minj [Tj – Lij]

Page 92: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Example LF and LS

92

a

b

c4

5

LF=9

LF=6What is the LF of C?

Page 93: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

93

Critical path

• The critical path is the path that takes the longest to complete.

• To determine the path times, add the task durations for all available paths.

• Activities that have slack can be delayed without changing the overall time of the project. Slack is computed in one of two ways, slack = LF - EF or slack = LS - ES.

Page 94: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Critical path

• Activities that are on the critical path have a slack of zero (0).

• In the example, critical path is ACEG• Activities not included in the critical path can be

delayed without affecting the duration of the project

94

Page 95: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

95

Network diagram

Page 96: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

96

Critical Path Analysis

Page 97: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

97

Activities that have a slack

• SLACK = LF - EF• Activity b has an LF of 9.17 and an EF of 5.33, so the

slack is 3.84 work days. • Activity d has an LF of 15.01 and an EF of 10.33, so

the slack is 4.68 work days. • Activity f has an LF of 19.51 and an EF of 14.83, so

the slack is 4.68 work days. • Activity b can be delay for 3 days without affecting

the project duration!

Page 98: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

98

Exercise

• Identify the critical path• Determine the earliest completion time • Is it possible to reduce the duration of the

project by reducing the duration of activity C

Page 99: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

99

Exercise

Activity Duration (weeks) precedence

A 2 -

B 3 A

C 3 B

D 7 B

E 6 B

F 2 C, D

G 5 D, E

H 4 F, G

I 8 H

J 2 H, I

Page 100: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Exercise

Activity Predecessor

Duration (weeks)

Cost per week ($)

A 3 500B 4 450C A 4 300D C 10 300E A 2 600F B 7 200G E 8 450H G 5 350I F, G 3 600J H 6 480K J 5 700L K 9 500

100

Page 101: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

Exercise

101

Determine the expected duration of the project and the total cost of the project. If the management team wants to reduce the total project duration by 3 weeks, what is the additional cost required if the following constraints must be satisfied.

•Only activity with a duration longer than 5 weeks can be reduced•Duration of an activity can only be reduced by 1 week and its “cost per week” will be increased by 15%

Page 102: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

102

Activity 8 – Assess Project Results and Experiences

• Did the final product meet or exceed user (supervisor’s) expectations?– Why or why not?

• Did the project come in on schedule?– Why or why not?

• Did the project come in under budget? – Why or why not?

Page 103: 1 Engineering Project Management. 2 Define the terms project and project management, and differentiate between project and process management. Describe.

103

Conclusion

• Output α input– Output (your grade) – Input (your effort)

• Who is/are the stakeholder of the project? • Time Vs yourself • Do not over estimate your abilities – always reserve

more time for your project!!!!!