1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science...

37
1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department of Physics, K.N.T University, Iran Yaser Kasesaz Isfahan

Transcript of 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science...

Page 1: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

1

Design and construction of BNCT irradiation

facility at Tehran research reactor

1Nuclear Science and Technology Research Institute (NSTRI), Iran2Department of Physics, K.N.T University, Iran

Yaser Kasesaz

Isfahan

Page 2: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

2

Contents

BNCT project at Iran

Introduction to TRR

Structure of thermal column

Epithermal neutron beam design

Main challenges in construction process

Thermal neutron beam design

New challenges

Measurements of the neutron beam parameters

Conclusions

Page 3: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

3

BNCT project at Iran

Yazd

Page 4: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

4

~ 1990: The first attempt was conducted by Dr. Marashi & Dr. Pazirandeh

2009- Continue: A new Project has been defined at NSTRI:

in 5 International Symposium on Neutron Capture Therapy (1992)

The results showed that the neutron flux at none of the beam exits is not sufficient

Construction of BNCT facility at TRR

Page 5: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

5

Boron Drug

Phantom

TPS

ShieldingBoron Measur.

Dosimetrysystem

Simulatorroom

Medical room

Neutron Beam

The project has different sub-projects

Page 6: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

6

Introduction to TRR

Kashan

Page 7: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

7

Page 8: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

8

Seven Beam Tubes

TRR is a 5 MW MTR, pool type research reactor

fuel assemblies : LEU, plates ,U3O8 Al alloy

Reactor pool has two major parts, stall-end and open pool

Irradiation facilities:

In-core irradiation boxes

Two rabbit systems

Medical room

Gamma room

Main application: radioisotopes production

Page 9: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

9

it has been shown that the thermal column is the best facility which can be adapted for BNCT

Appl. Radiat. Isot, 90, 132-137 (2014).

Page 10: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

10

Structure of Thermal column

Shiraz

Page 11: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

11

Is it possible to remove all graphite blocks?

Page 12: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

12

Page 13: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

13

Page 14: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

14

All parts placed in their position for routine TRR activity

Page 15: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

15

Epithermal Neutron Beam Design

Shiraz

Page 16: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

16

Core

Lead Graphite

Reactor pool

Concrete

Concrete

Reflector

Reflector

Moderator

Collimator

Page 17: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

17

Moderator: Al (30 cm)

Reflector : Pb (35 cm)

Gamma filte: Two Bi Layers (5 cm)

Thermal neutron filter: Cd (2 mm)

Ann. Nucl. Energy (2014) 234–238

Page 18: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

18

Page 19: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

19

Page 20: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

20

Main Challenges in construction process

Shiraz

Page 21: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

21

high gamma dose caused by activated materials in the reactor structure

Access to 3th and 4th graphite layers

a new project is defined to design the thermal beam instead of epithermal beam

Page 22: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

22

Thermal Neutron Beam Design

Ramsar

Page 23: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

23

the 3Th and 4Th graphite layers are fixed

From the first layer only 9 special blocks are removed

For the 2Th layer three different configurations have been studied

Page 24: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

24

three different configurations

Page 25: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

25

Page 26: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

26

Page 27: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

27

Page 28: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

28

Thermal neutron Flux: 2.6E7 (n/cm2.s)

Cadmium Ratio: 112

Measurement of neutron beam parameters: at 90 kW

Gamma Dose Rate: failed

Page 29: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

29

New Challenges

Isfahan

Page 30: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

30

The new challenge : Gas and particle contamination at the reactor hall

Air

Page 31: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

31

Solution 1: using wood blocks

Not effective

Page 32: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

32

Solution 2: re- arranging the blocks in the second layer

It is effective

Page 33: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

33

Designed Neutron Beam Parameters

Isfahan

Page 34: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

34

Gamma Dose Rate: 0.19 mSv/Min (at 100 kW)

Neutron beam parameters:

Thermal neutron Flux: 1.7E8 (n/cm2.s) at 1.5 MW

Cadmium Ratio: 186

Page 35: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

35

Conclusions

Shiraz

Page 36: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

36

Conclusions

The designed beam has two major advantages:

We impose minimal changes in the thermal column structure

A sample or phantom can be irradiated outside of the thermal column

thermal neutron beam has been constructed based on the use of thermal column.

The arrangement of graphite blocks has been modified to provide a thermal neutron beam.

The final results have been shown that the thermal neutron flux at the beam port is 1.7E8 (n/cm2.s) at 1.5 MW which is appropriate for BNCT.

Page 37: 1 Design and construction of BNCT irradiation facility at Tehran research reactor 1 Nuclear Science and Technology Research Institute (NSTRI), Iran 2 Department.

37

Thank you ….